Benefits of the Origo PhaseID System. Double click on the speaker icons to hear audio.

Slides:



Advertisements
Similar presentations
Week 1: Introduction to GIS
Advertisements

LOGO Safety Through Prevention – Safe Switching Using Smart Key Technology Shuqiang Jin, Unitech, Zhuhai, China Nan Liu Youru Huang, SERCC EPRI's 14th.
Digital Current Transformer Reporter
Welcome to the Award Winning Easiest to Use & Most Advanced View, Manage, and Control Security, Access Control, Video, Energy & Lighting Systems, & Critical.
GIS: Integrating, Analyzing and Automating It's Easier Than You Think.
Programming Types of Testing.
1 Distributed Generation and Power Quality. 2 Relaying considerations DG infeed may reduce the reach of overcurrent relays –DG feeds fault, so utility.
BA271 Week 6 Lecture Database Overview Dave Sullivan.
Microsoft Access 2003 Introduction To Microsoft Access 2003.
Application of GIS to Bridge Health Monitoring Presented in partial fulfillment of the requirements for CVEN 689 Presented by : Mohammed Safi Uddin Adil.
CS 128/ES Lecture 11a1 GPS. CS 128/ES Lecture 11a2 Global Positioning System
XP New Perspectives on Microsoft Office Access 2003, Second Edition- Tutorial 1 1 Microsoft Access 2003 Tutorial 1 – Introduction To Microsoft Access 2003.
Distributed Power Systems ELCT 908
SDReaderCE An Overview on Use and Functionality. Using SDReaderCE After loading the route to the handheld from SDReader6, select the route folder from.
Computer and Internet Basics.
AS ICT.  A portable communication device is a pocket sized device that is carried around by an individual  They typically have a display screen with.
Transmission planning in Vermont Past, present and future Docket 7081 workshop By Dean LaForest 9/19/05.
Fundamentals of Power Electronics and Power System with MATLAB
Copyright © 2004, Cabinet NG Inc. All Rights Reserved The only automated filing solution that begins filing as you begin typing An Introduction to…
Database Applications – Microsoft Access Lesson 2 Modifying a Table and Creating a Form 45 slides in presentation Accessibility check 9/14.
CHAPTER 9 DATABASE MANAGEMENT © Prepared By: Razif Razali.
The Utilization of GIS Technology at Northeastern REMC Presented By: Steven Weber, GISP Northeastern REMC (260)
GIS at Bangor Hydro February 5, 2004 Gary Duplisea Steve Severance Kris Dean.
Radian Research, Inc. Radian Research, Inc. an employee owned company Power and Energy Measurement Specialists 3852 Fortune Drive.
Geo CE-XM ch 4 Edited 10/14/05 1 The XM is the newest of the rovers, and unlike other units, it comes with software installed on the unit as well as using.
MagicInfo Pro Scheduler Now that a template has been created from content imported into the Library, the user is ready to begin scheduling content to.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Energy Management System Industrial Controls & Drives (India) Private Limited Chennai
Operating Systems. Without an operating system your computer would be useless! A computer contains an Operating System on its Hard Drive. This is loaded.
Just as there are many human languages, there are many computer programming languages that can be used to develop software. Some are named after people,
Low Voltage Smart Grid System Enables Near Real Time Energy Balancing as a Tool for Detecting and Managing Energy Losses Jan Olwagen Senior Engineer Utillabs.
XP New Perspectives on Microsoft Access 2002 Tutorial 1 1 Microsoft Access 2002 Tutorial 1 – Introduction To Microsoft Access 2002.
Microsoft Office Illustrated Introductory, Second Edition Started with Outlook 2003 Getting.
Database Applications – Microsoft Access Lesson 1 Introduction 26 Slides in Presentation Updated 8/12.
Oncor Electric Delivery Intelligent Grid at Oncor Electric Delivery SWEDE Conference Alan Bern – SCADA / Automation Manager May 1, 2008.
Microsoft Access. Microsoft access is a database programs that allows you to store retrieve, analyze and print information. Companies use databases for.
Frankfurt (Germany), 6-9 June 2011 Louise Jakobsen, Danish Energy Association – Denmark – Session 3 – Paper 0811 Louise Jakobsen, Danish Energy Association.
Easy Set-Up Instructions Vuze ® Table Location System (PC Version) Questions ? Phone: , option 2
BA271 Week 6 Lecture Dave Sullivan. Goal for today… Status Report – Review where we are … Status Report – Review where we are … Begin learning about Microsoft.
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
Basic Computer Organization Rashedul Hasan.. Five basic operation No matter what shape, size, cost and speed of computer we are talking about, all computer.
Distribution Systems-General
Contents Introduction What are Location-based services Working of Location-based services Location Tracking Technologies Power profiling a mobile phone.
70-294: MCSE Guide to Microsoft Windows Server 2003 Active Directory, Enhanced Chapter 6: Active Directory Physical Design.
Systems and User Interface Software. Types of Operating System  Single User  Multi User  Multi-tasking  Batch Processing  Interactive  Real Time.
UNIT 3 – MODULE 5: Data Input & Editing. INTRODUCTION Putting data into a computer (called data coding) is a fundamental process for virtually all GIS.
AUSTIN ENERGY ROAM STREETLIGHT MANAGEMENT SYSTEM ROAM = Remote Operations Asset Management SWEDE 2016.
If you have a transaction processing system, John Meisenbacher
Fast Phasing Made Possible by the G3 Field Probe (100+ Locations a day) Real-time remote phase identification of any energized conductor anywhere on the.
Loop-Sectionalizing Automation Scheme Colin Hawthorne 4/26/2016.
CURRENT ® Smart Grid Overview July SMART GRID = ENHANCED FUNCTIONALITY Smart Grid delivers more than advanced metering infrastructures: -safe.
Sub Station.
Introduction to Electric Power System and A. C. Supply
Power Generation and Distribution
RCM Turbo SQL Version.
Types of Computers & Computer Hardware
GPS with Collector for ArcGIS
Advanced Distribution System Management and Enterprise Engineering & Operations Wayne Carr -- Milsoft.
Chapter 12 Accessing Databases
How Can I Download My Transactions Directly Into Quicken
Tutorial 1 – Introduction To Microsoft Access 2003
Fast Phasing Made Possible by the G3 Field Probe
Tutorial 1 – Introduction To Microsoft Access 2003
TransCAD Vehicle Routing 2018/11/29.
Rapidly phase identify your entire utility 100+ Locations a day
LONG RANGE PHASING TOOL
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
FPGA Vinyl to Digital Converter (VDC)
CORDLESS PHASING TESTER
Customized gis applications for Electric DISTRIBUTION Utilities
Presentation transcript:

Benefits of the Origo PhaseID System. Double click on the speaker icons to hear audio.

Origo PhaseID System The PhaseID System now makes it possible to quickly and easily determine energized phase attributes anywhere in your system. Use it on primary, secondary, overhead, underground, livefront, deadfront, transformers, switching cabinets, substations, and standard 120-volt receptacles.

How it Works The basic concept of the PhaseID System is very simple. GPS timing signals are used to obtain snapshot phase measurements at an unknown field location and at a known reference location at the same instant of time. When these two measurements are compared, the phase attribute at the unknown field location can be determined.

Why it is Needed Simply put, complete system phase knowledge is required to operate a smooth, balanced, efficient, well maintained utility. For example, phase knowledge allows distribution load balance to be obtained and maintained as new customers are added.

Benefits of Phase Identification Geographical Information Systems (GIS) These systems are only as good as the data they contain. When GIS phase attribute data is incorrect, the usefulness of these important data bases are greatly diminished. A phase identification system allows you to easily and accurately correct your phase maps. Reduce Outage Management Errors An accurate outage management data base allows a utility to instantly determine which feeder has tripped based on customer outage calls. However, if the phase attribute data associated with individual customers is wrong, time is wasted directing a troubleman to the wrong fuse or breaker. A phase identification system allows you to correct these data base errors. Load Imbalance As new customers are added, or due to seasonal load changes, feeder loads may have to be re-balanced by switching loads from one phase to another. If the phase load being switched is connected to one that is not accurately known, phase balancing becomes a time consuming and frustrating process. Instead of moving load from C to A, you might be really moving load from B to C, which makes the problem worse instead of better. With a phase identification system, cables can be accurately tagged. Wasted Crew Time Hours are wasted daily with entire crews waiting while attempting to identify phasing. The current practice of driving a line to determine phase is no longer necessary. A phase identification system can accurately determine phase anywhere in a matter of minutes. Neutral Current This is an area utilities have not spent much attention to because, prior to the availability of phase identification systems, there was no cost effective way to address it. Neutral current is caused by unbalanced phase currents and results in wasted energy. Although not possible to totally eliminate neutral currents, reducing them by using a phase identification tool to balance feeder currents throughout your system can save hundreds of thousands of dollars per year in wasted energy costs.

Neutral Current Loss

Origo PhaseID System No cell phones No work delays due to lack of cellular coverage Use on any voltage Very portable (only 3 lbs) Lowest cost solution available

Phase Measurement Comparisons The reference phase base station can be connected to any convenient wall socket of any phase. Each GPS second, the wall socket phase is measured and stored in a PC file. When touched to any energized line, the field probe measures the unknown phase at the next GPS second and encodes it into a 9-digit sequence. Base and field measurements can be compared at any convenient time and manner by simply entering the 9-digit sequence into the PC.

Available in Handheld or Lineman

Available in Manual or Datalogger Non-Real-Time phase attribute determination. Write down the phase sequences and enter them into the base station later. Call your dispatcher, or any other utility personnel, and give them the 9-digit sequence. They will enter it into their PC and tell you the phase attribute. Real-Time phase attribute determination if Internet access available. Automatically records the phase sequence in a measurement file. Provides GPS location. Accepts user notes. Real-Time Satellite communication link available soon. Manual VersionDatalogger Version

Lineman Field Probe Substation Buss12.5KV Bushing

Lineman Field Probe Elbow Test PointSecondary Conductor

Handheld on Transmission Lines 345KV No extendo stick required. Determine all 3 phases with a single measurement.

Handheld on Overhead Lines 69KV12.5KV

Handheld in Cabinets 12.5KV Bushing12.5KV test Point

Handheld on Single Phase Line

Handheld with Netbook PC & Aircard

Convert a 20 Minute Extendo Stick Phasing Task on High Overhead Lines into a 20 Second Task using the Handheld 69KV

Handheld on Meters

Three Phase Horizontal Lines

Three Phase Vertical Lines

Base Station

Base Station Antenna

Remote Base Stations

Base Station Software

Tagging Reference Phase Tagging reference phase is one of the most important concepts of phase identification. Tagging reference phase simply refers to what phase attribute you wish to call each 3-phase conductor. There is no universal Phase A. Phases A, B, and C are simply the phase attributes the utility wishes to tag or assign to each of the 3-phase conductors. Once assigned, all conductors of the same phase are tagged according to this chosen tagging reference phase.

Typical Configuration Files

Primary and Secondary Connection Phase Attributes

Secondary Phase Attribute

Field PC Software

User Inputs

GPS Position

Batch Convert All measurement sequences can be converted to phase attribute with a single click. First, copy the base station daily reference file into the field PC data directory. Next, click on the third icon to the right of the measurement sequence window (red-to-green icon). This action converts all measurement sequences to phase attributes and changes all red dots to green dots.

PhaseID USA Customers (That we know of) Origo also has customers in Australia, Canada, India, Jamaica, New Zealand, and Taiwan.

When you are tasked with collecting thousands of attributes to phase identify your entire utility, no other system available is as fast and convenient as the Origo PhaseID System Bottom Line