Sales and Operations Planning (Aggregate Planning)

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

Advanced Piloting Cruise Plot.
Operations Management Maintenance and Reliability Chapter 17
Copyright © 2002 Pearson Education, Inc. Slide 1.
Copyright © 2002 Pearson Education, Inc. Slide 1.
PowerPoint Presentation
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Slides prepared by JOHN LOUCKS St. Edward’s University.
Operations Management
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Strategic Capacity Management.
Sales and Operations Planning (Aggregate Planning)
Capacity Management Planning the resource capacity that a firm will need to meet its demand.
Managing Capacity.
Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.
Chapter 11 Strategic Capacity Management
PRODUCTION AND OPERATIONS MANAGEMENT
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Chapter 5 Strategic Capacity Planning
Capacity and Constraint Management
Capacity and Constraint Management
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J S 7-1 Operations Management Capacity Planning Supplement 7.
Strategic Capacity Planning for Products and Services
Chapter 5 Test Review Sections 5-1 through 5-4.
Addition 1’s to 20.
25 seconds left…...
Week 1.
We will resume in: 25 Minutes.
Business Processes Sales Order Management Aggregate Planning Master Scheduling Production Activity Control Quality Control Distribution Mngt. © 2001 Victor.
Topics to be Covered 1. Capacity Planning
CAPACITY LOAD OUTPUT.
Sales and Operations Planning (Aggregate Planning)
Operations Management Aggregate Planning Chapter 13
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operational Planning Operations Management Chapter.
Operations Management Aggregate Planning Chapter 13
Operations Management
Aggregate Planning.
WEEK 11A – [S&OP] AGGREGATE PLANNING (CHAPTER 13) Planning levels (long, intermediate and short ranges and real time control); Planning & Control Model;
1 Introduction to Operations Management Aggregate Planning CHAPTE R 12.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning Delivered by: Eng.Mosab I. Tabash Eng.Mosab I. Tabash.
Sales and Operations Planning (Aggregate Planning)
1 Slides used in class may be different from slides in student pack Chapter 16 Aggregate Sales and Operations Planning  Operations Planning Overview 
©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 1 Capacity Decisions Defining.
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Operations Management
PowerPoint presentation to accompany Heizer/Render - Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
AGGREGATE PLANNING Rachmat A. Anggara 9th of April 2010.
Operations Management Aggregate Planning
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e 1-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall.
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
Chapter 13 Aggregate Planning.
Chapter 10 Sales and Operations Planning (Aggregate Planning)
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 16 Sales and Operations Planning.
© 2007 Pearson Education Sales and Operations Planning.
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
© The McGraw-Hill Companies, Inc., OUTPUT PLANNING PROCESS Aggregate Planning.
LESSON 2 Sales and Operations Planning (S&OP) and Aggregate Planning
Sales and Operations Planning
SALES AND OPERATIONS PLANNING AGGREGATE PLANNING PRODUCTION PLANNING OPERATIONS PLANNING How to meet effectively and efficiently forecasted requirements.
Chapter 14 Aggregate Planning.
Operations Management
13 Aggregate Planning.
Chapter 8 Aggregate Planning in the Supply Chain
Fundamentals of Production Planning and Control
Dr Sh Salleh bin Sh Ahmad
Manufacturing’s Objectives
Presentation transcript:

Sales and Operations Planning (Aggregate Planning) ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield

Sales and Operations Planning Strategic and tactical considerations Top-down planning Bottom-up planning Optimization techniques ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield

Back to Pennington Cabinet Strategic Capacity Level: Five machines, nine assembly teams Company produces make-to-stock cabinets for sale at Lowe’s, etc. Effective capacity: 5,000 jobs per year OR about 420 jobs per month ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield

Pennington (continued) Raw Demand for next 6 months: January 150 jobs February 250 March 350 April 450 May 600 June 650 What are our options . . . ? Class discussion before proceeding, what would the students do? ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield

Pennington (again) . . . Raw Demand Need 450 600 Monthly capacity = 420 300 April ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield

Sales and Operations Planning (SOP) Purpose: Select capacity options over the intermediate time horizon Capacity options: Workforces Shifts Overtime Subcontracting Inventories etc. ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield

Short-Range Plan (days, weeks out) Long-Range Plan (years out) Time Horizon View . . . Short-Range Plan (days, weeks out) SOP (months out) Long-Range Plan (years out) Capacity levels considered “frozen” in the short-term Changes in adjustable capacity possible fixed ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield

SOP continued (2 - 18 months out) “Big Picture” approach to planning Outside of time frame  strategic planning Inside of time frame  tactical planning “Big Picture” approach to planning Families or groups (aggregation) of: Products Resources Technologies or skills Provide “rough” estimates ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield

Position in the Overall Business Planning Cycle Decisions Time Frame Product and process “Bricks and Mortar” 18+ months Employment and overall inventory levels What demand to meet? 2 to 18 months Specific products and times Scheduling of people and equipment Less than 2 months Long-Range Plans SOP Short-Range ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield

Inputs to the Process SOPs Demand Management Strategic Capacity Levels Forecasts of customer demand Need for spares, etc. Pricing Strategic Capacity Levels Existing buildings Processes SOPs External Capacities Suppliers Subcontractors ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield

Advantages of SOP Negotiated process Functional coordination “Agreed” demand Functional coordination Budgets and cash flow analyses Reduces operations task to “meeting the plan” ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield

SOP Approaches Top-Down Bottom-Up Similar products OR stable mix Standards available for planning time, cost requirements from history and/or planning documentation Can “Average” product Bottom-Up Different products AND unstable mix Requires forecasts and production data for individual products Can be extremely data- intensive ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield

Top-Down Planning Develop the aggregate sales forecast and planning values. Translate the sales forecast into resource requirements. Personnel, equipment, materials Generate alternative production plans. Chase, level, mixed Select the best of the plans. Lowest cost, best fit to capability ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield

Top-Down Example I (Product Data) % of Total Labor/Unit A100 10% 40 hours B200 50% 20 hours C300 20% 15 hours D400 5% 10 hours E500 F600 ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield

Top-Down Example II (“Average” Products) % of Total Labor/Unit A100 10% 40 hours B200 50% 20 hours C300 20% 15 hours D400 5% 10 hours E500 F600 10%(40) + 60%(20) + 20%(15) + 10%(10) = 20 hours ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield

Top-Down Example III (Conditions or Constraints) Agreed upon demand to be met for upcoming 12 month period Can vary workforce and inventory levels No backordering “Average” unit requires 20 worker hours Each worker works 160 hours per month Class discussion about where these conditions or constraints can come from: Top management, company culture, general policy, desired service level for customers, etc. ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield

Top-Down Example IV (Demand Forecast for 12 months) March 1592 September 2504 April 1400 October May 1200 November 3000 June 1000 December July 1504 January August 1992 February Class discussion about where these conditions or constraints can come from: Top management, company culture, general policy, desired service level for customers, etc. ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield

Top-Down Example V (Other tidbits of data …) Hiring cost = $300 Firing cost = $200 Inventory holding cost = $6 / unit / month Start and end with 227 workers (goal) Start and end with about 1000 units in inventory (goal) ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield

Detail of First Six Months from Level Strategy Demand Demand in Employee Hours Employees to Meet Production Plan Actual Employees Actual Production Firings Hirings Ending Inventory March 1592 31840 199 252 2016 25 1424 April 1400 28000 175 2040 May 1200 24000 150 2856 June 1000 20000 125 3872 July 1504 30080 188 4384 August 1992 39840 249 4408 Taken in part from Note: We develop a level strategy by setting “Actual Employees” equal to the average required for the 12 month planning period ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield

Detail of First Six Months from Chase Strategy Demand Demand in Employee Hours Employees to Meet Production Plan Actual Employees Actual Production Firings Hirings Ending Inventory March 1592 31840 199 28 1000 April 1400 28000 175 24 May 1200 24000 150 25 June 20000 125 July 1504 30080 188 63 August 1992 39840 249 61 Taken in part from the Excel file Ch12-SOP_Chase.xls using Note: We develop a chase strategy by setting “Actual Employees” equal to the number needed in each period ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield

Another View ... ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield

Cost Details from the Spreadsheets ... Level strategy Chase strategy ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield

Top-Down Example (Other Issues …) Are complete costs shown? Expand out for budget and cash flow analysis “Input” (suppliers) and “output” (logistics and warehousing) considerations Lead time, materials availability, storage space? Variations in actual production Scrap, rework, equipment breakdowns Input and output considerations such as lead-time, availability, storage space, etc. ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield

Top-Down Example (Expand the options …) We can now subcontract production Maximum subcontract of 1400 units per month Cost is $5 more per unit than internal production cost Will this option: 1) increase costs? 2) decrease costs? 3) have no effect on costs? Plan will decrease costs by holding employment steady and using subcontracting last three months (536, 688, and 1176), finishing with 1000 units in inventory – total cost is $136,704. ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield

Second Approach: “Bottom-Up” SOP Products with very different requirements Requires forecasts and production data for individual products Can be extremely data-intensive ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield