From Knowledge and Capacity Development to Performance Improvement in Water Supply: the Importance of Competence Integration and Use The Management contract.

Slides:



Advertisements
Similar presentations
UNITED NATIONS’ RESPONSE TO THE
Advertisements

1 Welcome Safety Regulatory Function Handbook April 2006.
1 DG Regio Evaluation Network Meeting Albert Borschette, Brussels, 14 October 2010 Ex post evaluation of Interreg III - Presentation of Final Results Pasi.
The Mental Capacity Act and Deprivation of Liberty Safeguards Implications for Commissioners and Care Providers Bruce Bradshaw Patient Experience Manager.
Assessing student learning from Public Engagement David Owen National Co-ordinating Centre for Public Engagement Funded by the UK Funding Councils, Research.
Summary of theme 1 CHALLENGES Uta Wehn de Montalvo 30 May 2013.
Capacity development - key to sustainable water operations Water Operator Partnership and Institutional Capacity Development for Urban Water Supply Richenel.
Dr. M.A. Quassem May 30th, 2013 Country Case Study Bangladesh.
Department of Environmental Quality Environmental Management System Overview.
INTRODUCTION TO ISO Joan Kithika. OUTLINE DEFINITIONS WHY ENVIRONMENTAL MANAGEMENT? LEGAL OVERVIEW HOW TO MANAGE THE ENVIRONMENT-AN ENVIRONMENTAL.
Assessment of Organisational Development Capacity of National Nodes
Presentation for the Management Study of the Code Enforcement Process City of Little Rock, Arkansas August 3, 2006.
Development of internal control: methodology and responsibility
October In May 2000, Walkerton’s drinking water system became contaminated with deadly bacteria, primarily Escherichia coli O157:H7.1 Seven people.
Ray C. Rist The World Bank Washington, D.C.
UK WIR The UK Experience Christopher Royce Anglian Water Services.
CLOSING CEREMONY 31 May Symposium Final Reflections Guy Alaerts 1 June 2013.
INDUSTRIAL & SYSTEMS ENGINEERING
Preparation of Institutional and Human Resources Directory and Assessment of Capacity of Regional Secretariat and National Nodes Simba Sibanda Troparg.
Improving the Energy Efficiency of the Heat and Hot Water Supply Presenter: Bayramgul Garabaeva, Programme Officer Decentralization and Community Development.
NATIONAL STRATEGY FOR WSP IMPLEMENTATION IN GHANA. Nii Okai Kotei Director, Water Public Utilities Regulatory Commission, Accra, GHANA IWA Africa Region.
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
Ship Recycling Facility Management System IMO Guideline A.962
Seminário O controle interno governamental no Brasil Velhos Desafios, Novas Perspectivas 14 a 16 de Maio Iguassu Resort – Foz do Iguaçu - Paraná International.
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
‘Developing the appraisal process in the wider context of the Sport and Fitness sector of Higher Education’. Welcome & Introductions.
Sustainable Procurement & Life Cycle Analysis Heather Pearce 9 th February 2010.
GOVERNMENT OF ROMANIA MINISTRY OF PUBLIC FINANCE MANAGING AUTHORITY FOR COMMUNITY SUPPORT FRAMEWORK Evaluation Central Unit Development of the Evaluation.
Title Consultation on the 7 th replenishment of IFAD’s resources IFAD’s operating model : overall structure and components Consultation on the 7th replenishment.
Developing a result-oriented Operational Plan Training
Logistics and supply chain strategy planning
WSNTG Annual Conference 8 th September 2005 WSNTG 9 th Annual Conference “Water Services Strategic Plans – Fact or Fiction”
Quality Management.  Quality management is becoming increasingly important to the leadership and management of all organisations. I  t is necessary.
Coordination and Net Working on DRR Rapid Emergency Assessment and Coordination Team (REACT) Bishkek November, 2009.
Institutional Development for Improved Water Quality | November 2010 Operation and Maintenance for Safe Drinking Water – Institutional development to achieve.
By Bankole Ebisemiju At an Intensive & Interactive workshop on Techniques for Effective & Result Oriented Annual Operation Plan November 24th 2010 Annual.
Understanding customer expectations and perceptions
Transforming Community Services Commissioning Information for Community Services Stakeholder Workshop 14 October 2009 Coleen Milligan – Project Manager.
System Analysis of Virtual Team Collaboration Management System based on Cloud Technology Panita Wannapiroon, Ph.D. Assistant Professor Division of Information.
1 Governance, accountability and performance reporting in the public sector Des Pearson Executive in Residence August 2013.
Health Promotion as a Quality issue
Management in relation to learning processes Proposal Sources: ANECA, CHEA, DETC.
BEYOND MKUKUTA FRAMEWORK: Monitoring and Evaluation, Communication and Implementation Guide Presentation to the DPG Meeting 18 th January, 2011.
The Danube River and Black Sea GEF Financed Investment Program The GEF/WB Nutrient Reductions Partnership.
The P Process Strategic Design
1 The Future Role of the Food and Veterinary Office M.C. Gaynor, Director, FVO EUROPEAN COMMISSION HEALTH & CONSUMER PROTECTION DIRECTORATE-GENERAL Directorate.
PRESENTATION TO PORTFOLIO COMMITTEE ON WATER AFFAIRS AND FORESTRY Cindy Damons 28 May 2008 The role of municipalities in managing and giving effect to.
Kathy Corbiere Service Delivery and Performance Commission
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
1 Response to Financial and Fiscal Commission Submission for The Division of Revenue 2010/2011 Presentation to Select Committee on Finance 06 August 2009.
MODULE 5 PLANNING, REPORTING & ACCOUNTABILITY ADB Private Sector Development Initiative Corporate and Financial Governance Training Solomon Islands Dr.
“DEVELOPMENT OF A NATIONAL ICT POLICY ICT Policy in the ECTEL Member States Mr. Donnie Defreitas MSc, (Hav.), ECTEL Caribbean Internet Forum Bay Gardens.
What is commissioning? “Commissioning is the cycle of assessing the needs of people in an areas, designing and then achieving outcomes”
Regional Policy Guidance on monitoring TÓTH Gábor DG EMPL – Impact Assessment, Evaluation Unit ESF Evaluation Partnership meeting, Rome, 26 November 2014.
Provider Forum 5 th July – Supported Lodgings & Floating Support Value for Money –“the relationship between economy, efficiency and effectiveness” –“a.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
OWNER BY MFG OUTPUTS Incoming Supplier Quality Audits ( Supplier feedback System) Continuous Improvement plans Yields Cycle Time Problems solving as needed.
Presented By Tasnuva Nashtaran Miusi Priyangwada Abdullah Shibli Sadiq CAPACITY BUILDING APPROACHES FOR PUBLIC ADMINISTRATION.
Karnataka Public Financial Management and Accountability Study Launch Presentation September 14, 2004.
Marelize Gorgens The World Bank An M&E strategy Monitoring & Evaluation strategy Master & Execute Money and Energy is a waste of M&E that we do not M&E.
Financial and Operational Performance Improvement Programe (FOPIP) Danube Water Conference 2017, Vienna, May 18 Training session on Local governments’
COBIT® 5 for Assurance Introduction
Impact of EU structural funds in research and innovation: the experience of the Lithuanian 'Valleys’ April, 2016.
a New Focus for External Validity
2018/19 ANNUAL PERFORMANCE PLAN FOR MISA
URBAN STREAM REHABILITATION
COBIT® 5 for Assurance Introduction
COBIT® 5 for Assurance Introduction
Helene Skikos DG Education and Culture
COBIT® 5 for Assurance Introduction
Presentation transcript:

From Knowledge and Capacity Development to Performance Improvement in Water Supply: the Importance of Competence Integration and Use The Management contract between Aqua Vitens Rand Limited (AVRL) and Ghana Water Company Limited (GWCL) By Silas Mvulirwenande Guy Alaerts Uta Wehn de Montalvo

Outline of the Presentation 1.The problem 2.Main concepts 3.Main results 4.Conclusions

The proxy measure problem in KCD Performance improvement is associated with competence development. However, the former does not always automatically translate into the latter Knowledge integration processes : take long but often taken for granted (or simply neglected) Measuring KPIs and conclude on KCD instead of measuring KCD per se KCD interventions Improved institutional performance Performance targets (often based on KPIs) Improvement in technical KPIs used as proxy measure of KCD effectiveness Translate Knowledge integration and use Measure of changes in competences

Main concepts Technical competence Competence on Governance Competence on Learning and Innovation (Knowledge competences) Managerial competence Action Arena Community Attributes Evaluative Criteria Actors Action Situations Outcome Patterns of Interactions Rules- in-Use Physical/Ma terial Conditions Knowledge conversion modes (Nonaka) Aggregate competences (Alaerts and Kaspersma) IAD Framework (Ostrom)

Synergistic effect of the concepts The three concepts illustrated above together allow an KCD analysis that: Comprehensively describes the changes in capacity (Aggregate competences) Shades light on the actual integration processes new knowledge and capacity undergoes once introduced in a social system (Knowledge conversion modes); and Is multi-level and inserts the outcome of KCD intervention into organisational internal and external environment (IAD Framework)

Results

The performance indicator – based assessment by the Auditors Raw water quality Target to meet the standards of the water Resource Commission The monitoring programme started only after 3 years Some important parameters were not measured Conclusion: the operator failed to meet fully the service standard Treated water quality and pressure Target to meet standards set by Ghana Standards Board Tracking Treated Water Quality started from the 3rd year Consistent incidences of quality not complying with standards Pressure could not permanently be maintained in most distribution systems Conclusion : quality and pressure did not meet the service standards Non Revenue water Target to deduce NRW by 5 % per annum For 35 systems investigated in the 4 th year Total NRW was about 51% (against 50% before management contract) Conclusion: the operator was unable to achieve the 5% reduction annually Treatment plant operations Target to maintain average daily production for at least ten months in a year In the 4th Contract Year, out of 94 plants: 24 plants were complying with the management contract criteria. Electromechanical and hydraulic equipment was in a poor state. Conclusion: the operator failed to meet fully the service standards but also allowed the conditions of the plants to deteriorate through poor maintenance practices Failed AVRL has not been able to meet the targets set in the management contract Performance Technical aspects ( poor : 2 on five point scale ) Overall performance score (Average)

An alternative approach to assessing the Management Contract The capacity - based assessment by the Authors The targets in the contract say nothing about capacity However, AVRL had to develop the capacity of the utility in order to improve its performance. Hypothesizing that the conventional (technical) KPIs need to be complemented with measures of the changes in capacity prior to and after the project, the authors conducted a capacity based-assessment

Changes in capacity (Technical) At organisational level Before the Management contractAfter the Management Contract Raw water quality Lack of data, no maintenance of facilities, no plans and strategies to assess and protect water sources Introduction of a raw-water quality monitoring programme, drinking water safety plans, raw water quality baseline, improvement of the capacity of several laboratories Treated water quality Water from wells not chlorinated only rudimentary, treatment steps simplified or bypassed Introduction of a new reporting and monitoring system based on electronic files, development of emergency procedures. Non Revenue Water No robust strategies to fight NRW estimated at 50% NRW plan (activities and policies), metering programme, GIS office, loss control teams in all the regions, District Metered Areas (DMA) launched At individual level Typical technical competences Weak Network mapping Techniques for meter management Knowledge competences Weak Teamwork Networking Communication Problem solving Information and Communication Technology Respondents recognize these aspects as important changes in capacity

Conclusion by the Authors on the Management contract Strong and broad evidence exists on changes in competences due to the Management Contract. Although AVRL did not meet the technical KPI targets, it did however enhance the fundamental capacity of the utility. If the above competences were further expanded and mobilized throughout the whole organisation, this would create a large impact first in capacity, and then after a few years in technical performance.

Conclusions

On theory The concepts used proved useful for understanding KCD The public sector is right in stressing the role of K&C. However, it must learn a lot from the private sector on how to manage processes inside organisations. The enabling environment, the organisational leadership and management procedures are critically important to help develop and maintain new competences and capacity.

On the problem of proxy measures It makes sense to differentiate performance improvement from competence development Therefore, KCD targets should be set that are realistic, taking into account the time knowledge and capacity take to nurture Traditional technical indicators are useful to indicate the level of utility performance. However, they do not inform about the real capacity and the extent to which it improves due to KCD. Therefore, need for appropriate methodologies to assess KCD to complement KPIs based assessments. This would allow fair and realistic assessments

Purpose of 5th Symposium Thank you for your attention. Questions + Comments ? Contact details Silas Mvulirwenande PhD Research Fellow UNESCO-IHE – Institute for Water Education