Special Conditions (up-front document); Annex A1: Work plan (Descricption of the action); Annex A2: General Conditions applicable to EC- financed grant.

Slides:



Advertisements
Similar presentations
BUDGETING Training Unit 13.2 Principles and financial rules of mobility.
Advertisements

Slide: 1 Website: DG ECHO HUMANITARIAN AID AND CIVIL PROTECTION Finance, Legal Affairs and Partner.
Regional Policy EUROPEAN COMMISSION 1 EGTC regulation EGTC regulation ESF and EGTC regulations Regulation of the European Parliament and of the Council.
1 Unit C3 Finance, legal Affairs and Partner support CALL FOR PROPOSALS APPLICATION PROCEDURE SPECIFIC ADMINISTRATIVE AND FINANCIAL ISSUES Version
INTERREG and Tacis budgets Main differences: No breakdown of the Tacis budget between the partners is required; No strict limits for the project management.
This project is implemented by ECO This project is funded by European Union Implementation of Twinning & TAIEX Operations in Azerbaijan Workshop on implementation.
SECTOR SKILLS ALLIANCES TOURISM AND CATERING GRANT AGREEMENT NO. EAC PRESENTED BY DR SHYAM PATIAR.
UNOPS-DAKAR Regional Office for West and Central Africa EXECUTION OF IFAD PROJECTS: Constraints and proposed solutions.
Progress and Financial Reporting Geoff Butters, MDR Partners 05 March 2012, KB, The Hague.
1 Financial Procedures in FP7 Projects Reporting and Audits Karolina Lis Research Assistant DCU, Finance Office
Culture2000 Programme Presentation of the application’s budget and interim/final report.
Technical Exchange on the new templates of the Delegation Agreement Thursday, 21 th of March 2013 Practitioners’ Network – Brussels.
Twinning Manual 2009 – New procedures, new templates, preparing and amending Twinning Contracts DG Enlargement – Unit D4 February 2010.
HR 08 IB SPP 02 TWINNING PROJECT “ENHANCEMENT OF CAPACITY FOR EFFECTIVE MANAGEMENT OF EU COHESION POLICY FUNDS” 1 The most significant results of Component.
Government of the Republic of Macedonia Secretariat for European Affairs TWINNING EXPERIENCE IN MACEDONIA Orhideja Kaljoshevska. MA NCP Twinning “1 st.
KOR-EU Leaders for Global Education (KE-LeGE) – ADMINISTRATION AND FINANCES.
LIFE Platform meeting Denmark 2008 Tommy Sejersen, Financial Desks EC DG ENV – LIFE Unit Telephone
KOR-EU Leaders for Global Education (KE-LeGE) – ADMINISTRATION AND FINANCES.
SOCRATES PROGRAMME ADMINISTRATIVE AND FINANCIAL HANDBOOK FOR BENEFICIARIES Selection 2005.
HOW TO WRITE A BUDGET…. The Importance of Your Budget Preparation of the budget is an important part of the proposal preparation process. Pre-Award and.
Culture Programme - Selection procedure Katharina Riediger Infoday Praha 10/06/2010.
DAPHNE II Programme An investigation into forms of peer-peer bullying at school in pre-adolescent and adolescent groups: new instruments and preventing.
1 Framework Programme 7 Guide for Applicants
LINKED Administrative & Finance overview18/03/2010 LINKED Leveraging Innovation for a Network of Knowledge on Education LIFE LONG LEARNING PROGRAMME LLP.
Part-financed by the European Union Eligibility of expenditure Joint Technical Secretariat Information Seminar for Latvian Project Partners Riga, 29 April.
Project Closure Guidelines Riga, Legal framework 2 EC Regulation 1828/2006 § 8, 9: Explanatory plaque, billboard, emblem of the EU, reference to.
INFSO-RI Enabling Grids for E-sciencE-II Anna Cook Dita Mocova Reporting procedures & Financial Guidelines.
25-26/11/2010 ESSnet training Budapest ESSnet Training Part 3 – Financial Issues P. Jacques.
“RACCE” Raising earthquake Awareness and Copping Children’s Emotions: Management and Financial Issues NATURAL HISTORY MUSEUM – UNIV. OF CRETE (NHMC) Project.
EuropeAid 1 Delegation Agreements: 2011 templates “Regards Croisés” on Aid Effectiveness Practitioners’ Network for European Development Cooperation -
SBIR Budgeting Leanne Robey Chief, Special Reviews Branch, NIH.
TAIEX Technical Assistance and Information Exchange Instrument of the European Commission Institution Building Unit DG Enlargement.
EU instruments for technical assistance in statistics Point 4.4 of the Agenda Management Group on Statistical Cooperation March March 2011.
School Leadership Toolkit for Accelerating Achievement London 17 th November 2014.
1 An introduction to Project Cycle Management PCM DAY 3 Gori, 31/3 – 3/4/2015.
Budget Breakdown General Programme Solidarity & Management of Migration Flows European Return Fund (RF), the European Fund for the Integration of Third.
DG DEVCO, Unit B.6 Brussels, November Outline 1.Useful links 2.General conditions 3.General issues 2.
Name, Surname, Position Event, Date, Place Financial issues.
DG DEVCO, Unit B.6 Brussels, April Outline 1.Useful links 2.General conditions 3.General issues 2.
W w w. b a l t i c m a s t e r. o r g. BUDGET  Project Period  25th of October 2008 – 24th of January 2012  Budget and Funding  Total project budget,
ADMINISTRATIVE & FINANCIAL ISSUES DG ECHO HUMANITARIAN AID AND CIVIL PROTECTION Finance, Legal Affairs and Partner Support unit-C3.
Financial reporting Linda Wormö, MA Per Dahlström, MA 1st October,2015 Kuopio, Finland.
REPORTING, BUDGET, ELIGIBLE COSTS. Main steps of the financial management of the project.
Science, research and development European Commission IDARI Project Meeting Tartu, June 2005 Martin Greimel Scientific Officer Directorate-E ‘Biotechnology,
1 Eurostat’s grant policy for 2010 Luxembourg, 23/03/2010 Unit A4 – Financial Management Section 3 – Grant procedures and agreements.
Grant contract and annexes Training for Auditors Estonia/Latvia/Russia ENPI CBC Programme Riga, Tartu, April 2012.
Status and role of International Department (Slovak experience) MGSC Meeting Luxembourg 23 – 24 March 2012 SOSR.
Technical Assistance Office 1 SOCRATES - MINERVA GRANT AGREEMENT 2004 Contractual and Financial Management Administrative and Financial Handbook.
Technical Assistance Office 1 Contract, Reports and errors to avoid! GRANT AGREEMENT 2005 Comenius coordinators’ meeting, 17/10/2005 Maryline Fiaschi,
Technical Assistance Office TCP Projects 2005 Contractual and Financial Management Administrative and Financial Handbook Prepared by IA, 14/12/2001 SOCRATES.
Zagreb, 17th of June 2010 The TAIEX Instrument of the European Commission Cristina Paducea Institution Building, TAIEX, Twinning DG Enlargement.
- Special Education Needs (SEN) Network Administrative and Financial Aspects.
EU - China 11 Guidelines for Applicants rules for applications European Union Delegation to China & Mongolia Beijing Information Session 14 th November.
Management of the Grant Agreement By Philippe Ruffio & Nathalie Hoste-Luxen Tempus project representatives’ meeting Brussels December 2011.
Interreg Atlantic Area Programme Eligibility Rules.
TEMPUS INFORMATION DAY NEDAL JAYOUSI/Ph.d. NTO PALESITNE TEMPUS IV- FIFTH CALL FOR PROPOSALS.
15 March 2016, Kiev, Ukraine TWINNING PROJECT
Interreg Atlantic Area Programme Partner Budget & Eligibility Rules
European Commission “Intelligent Energy for Europe”
Contractual obligations
Financial management of DBBT project
Project Proposal Template
INTERREG IPA CBC “GREECE ALBANIA ”
EU instruments of funding and technical assistance
Charlotte Juul Hansen, Item 5: NSI participation in international technical assistance activities Practical aspects as an implementing Twinning.
Eligibility Rules Stefan Nyström, Managing Authority
United Nations Voluntary Fund on Disability (UNVFD)
Mr. Alper GÜCÜMENGİL Head of Projects Group, TURKSTAT
Financial and Administrative presentation on PARTICULATES project
Presentation transcript:

Special Conditions (up-front document); Annex A1: Work plan (Descricption of the action); Annex A2: General Conditions applicable to EC- financed grant contracts for external Actions; Annex A3: Budget for the Action (including co-financing part by the Final Recipient of the Action

Annex A4: Contract-award procedures; Annex A5: Standard request for payment and financial identification form; Annex A6: Expenditure Verification Report; Annex A7: Special Financial Annex; Annex A8: Mandates (if MS have formed a consortium)

The Twinning contract has to be signed in 6 months after selection ( cover contract preparation costs) The work plan has to be prepared in 3 months

BC policy developments in the sector Beneficiary institutions and other parties involved Parallel or related projects in the field

How the project field answers to one of the areas of cooperation with the EU List of projects already implemented/under implementation

Intervention logic Benchmarks Sources of information Assumptions (external to project) Overall Objective Project Purpose Mandatory Results (Components ) Activities

Make sure that the benchmarks always define the following: Quantity Quality Target Group Time Place

How will the partners and the administrative office know that the benchmarks have been met? For every level, list sources of information (e.g.reports, surveys, Official Journal, Commission Regular Report) The sources should be specified for each mandatory result and activity

External conditions at each level related to the project that mus be fulfilled in order to guarantee its success If these assumptions are fulfilled and the activities are carried out, then the relevant mandatory results will be achieved

Component Activity Each Component corresponds to mandatory result Each Activity constitutes a separate unit in the project design and corresponds to one budget section

COMPONENT 1: Gap analysis of legal acts in force related to counterfeit money - conception of implementation of requirements of the International Convention of 20th April 1929 for the Suppression of Counterfeiting Currency and Protocol, as well as norms of EU provisions prepared Activity 1.1 – 6 : functional audit: analyse conditions of synergies between paying actors Method: Short term experts will proceed to examination of the structure in charge of the fight against other counterfeited payment instruments, notably which it concerns the credit cards, in particular the current actors in the area of the fight against counterfeited payment instruments and the possible synergies between the existing structures and the new central office that must be set up. Resources: 1 expert. Number of days: 5 (One week by one expert) Targeted public: the Criminal police and chief of relevant police units. One interpreter will be provided for this activity. Expert: Mr Tribolet (French Police Counterfeit Money Fighting Central Office – OCRFM))

The internal conditions related to the project that must be fulfilled in order to guarantee its success

Human Resources Material Resources Indicative Budget

NamePresent position EmployerYears of experience NationalityEducationSpecialist knowledge BC experience Languages

MS Project Leader Junior MS Project Leader Resident Twinning Adviser (RTA) Component Leaders (Key Experts) Short Term Experts

BC Project Leader RTA Counterpart Key Contacts

Attach the EU format CVs of the following persons: MS Project Leader, BC Project Leader, RTA, RTA Counterpart in the BC, Key STEs from the MS (Component Leaders).

Adequately equiped office space for RTA and RTA assistant Adequate conditions for the STEs to perform their work while on mission to the BC Training and conference venues, costs of catering (if any), as well as presentation and interpretation epuipment

Language Project Steering Committee Reporting

Assessment of the sustainability of the Project Lessons learned from the project Dissemination of good practice

Financed via TAIEX instrument Between 6 and 12 months after closure of the project Twinning Review Expert ( Both PL and RTA and his counterpart also will be involved)

For ENPI, work plan to be initialled by the Member State Project Leader and the Beneficiary Country Project Leader.

Actions to be undertaken under the Twinning projectResponsibilityCost (tick as appropriate) BCMSNo of units Unit costTotal MS cost 1. Resident Twinning Advisor Remuneration Mr. Spyridon LANTSAS (12 months) Basic salary and non-wage labour costs X121450, ,60 Social costs X121404, ,80 6% of salary and non-wage labour costs X12171,292055,48 Total RTA remuneration36314,88

Expenses incurred to prepare Twinning Contract Resident Twinning Advisers costs Project Leader and Short Term Experts Supplies and services Travel expenses Training

Preparatory and follow-up work outside the BC, management and accounting Translation and interpretation Costs of the Expenditure Verification Report Provision to cover changes in prices

The Twinning Budget Lists the following expenditure as basic blocks: - RTA Expernditure: 1.Salary of the RTA 2.Non wage labour costs 3.Other allowances - Activity based bilding blocks

Civil servant Mandated body employee Temporary public employee Recently retired expert (less then two years before the start of the project)

Maximum 2,5% of the total budget To cover fluctuations in unit rates for reimbursable costs Drawing on the provision does not require prior approval by the Contracting Authority

Training documentation Interpretation Transport for on-site visits Infrastructure facilities in exceptional circumstances

Cost effectiveness and sound financial management Direct link between objectives in PF and study visit Direct relevance for the participating BC officials Adequate and intensive follow up of the study visit

Flight costs for BC experts ( only for ENPI) Per diem Incidentals (10 EUR per trainee per day) Travel inside the MS country Interpreter costs (flight ticket, per diem, fees) MS training institution fees

RTA should have a full time assistant The assistant should not have any contractual relation with the Beneficiary for 6 months The assistant to be contracted under the service contract The BC might want the assistant from they own administration.

Has to be budgeted for each activity The ceiling per budget item is Eur BC rates to be applied For the events in MS may be more advantageous to hire BC staff

BC Twinning partner is entirely responsible for providing all office equipment In exceptional cases small items of essential supplies (e.g. small laboratory testing consumables) for total costs < Eur

Where MS is unable to carry out necessary activities Services should be detailed in the Budget Private sector experts are not included in the contract The MS Project Leader is responsible for this procedure

All Twinning projects will be co-financed by the BC Costs for large scale equipment cannot be covered by Twinning Contract

Adequately equiped office space Telephone services Fax Photocopiers Computer Internet access Secretarial support Access to information

Costs for inderect taxes (VAT) unless the MS Partner cannot reclaim it Expert Fees for MS input performed outside the BC EU funds will not be used to fund BC running costs