Target chase, decay and absorber cooling for LBNE A. Marchionni, Fermilab 8th International Workshop on Neutrino Beams & Instrumentation CERN, November.

Slides:



Advertisements
Similar presentations
FEM FOR HEAT TRANSFER PROBLEMS
Advertisements

II ococ ? Optimisation of ABBs Wind Turbine Generator Performance by Installing A Heat Pipe Heat Exchanger Presented by : Haytham Abdulwahab The United.
1  1 =.
Matt Rooney RAL The T2K Beam Window Matt Rooney Rutherford Appleton Laboratory BENE November 2006.
HiRadMat Window Design report v2.0 1Michael MONTEIL- 16 March 2010.
EUROnu Beam Window Studies Stress and Cooling Analysis Matt Rooney, Tristan Davenne, Chris Densham Strasbourg June 2010.
1 New build-up technique with copper bump AGP Process.
Conduction Conceptests
An-Najah National University Faculty of Engineering
INTRODUCTION. Seminar on IMPROVEMENT OF THERMAL EFFICIENCY BY RECOVERY OF HEAT FROM IC ENGINE EXHAUST.
AGENCE NATIONALE POUR LA GESTION DES DÉCHETS RADIOACTIFS © Andra Oskarshamn – 13/05/2014 LUCOEX WP3 status.
Application of Steady-State Heat Transfer
Neutrinos from Stored Muons STORM Target Station Conceptual Design 15-April-2013 Kris Anderson Fermilab/Accelerator Division/Mechanical Support Department.
First Wall Heat Loads Mike Ulrickson November 15, 2014.
1 Activation problems S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2) (1) Politecnico di Milano; (2) CERN.
NuMI Radiation and Environmental Protection NBI th International workshop on Neutrino Beams and Instrumentation September 5-9, 2006 Mike Martens.
Mike Fitton Engineering Analysis Group Design and Computational Fluid Dynamic analysis of the T2K Target Neutrino Beams and Instrumentation 6th September.
Status of T2K Target 2 nd Oxford-Princeton High-Power Target Workshop 6-7 th November 2008 Mike Fitton RAL.
NUMI NuMI Hot Handling Jim Hylen (FNAL) NBI02 March 13, 2002 Page 1 NuMI Target Hall Radioactive Component Handling NuMI Target Hall Utilizes Three Basic.
The JPARC Neutrino Target
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
NBI March 2002 The MiniBooNE Horn Ioanis Kourbanis For The MiniBooNE Collaboration.
L 17 - Thermodynamics [2] Today’s topics
L 17 - Thermodynamics [2] Today’s topics –Practical thermal effects –Devices for temperature measurement –Mechanisms of heat transfer Science dealing.
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
Fermilab Neutrino Beamline to DUSEL Mike Martens Fermilab PAC November 3, 2009.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
LBNF Neutrino Beam Jim Strait, Fermilab For the LBNF/DUNE Team
Horn design for the CERN to Fréjus neutrino Super Beam Nikolas Vassilopoulos IPHC/CNRS.
KIT – University of the State of Baden-Württemberg and National Large-scale Research Center of the Helmholtz Association Institute for Nuclear and Energy.
NUMI NuMI Internal Review July 12, 2001 Infrastructure: Radiation Safety Page 1 Technical Components NuMI Beamline Radiation Safety Issues Radiation Safety.
NUMI Transmission Line (TL) Review: Design Details TL through Block & Beyond Design/Status Bill Boettinger FNAL April 23, 2003.
ATLAS Calorimeter Argon Gap Convection Test Bed Brian Cuerden 24 Apr
JPARC- Decay Volume M.Sakuda (KEK) 11 November Decay Volume Requirements Design 2. Construction Status 3. Summary and schedule In collaboration.
LHC Phase II Collimator Compact jaw simulations New FLUKA => ANSYS mapping scheme New 136mm x 950mm jaw –60cm primary collimator –Helical cooling channel.
NML High Energy Beam Absorbers and Dump 29-August-2011 Beams-doc-3928.
NuMI NuMI Target Hall Air System Review Introduction July 30, 2003 Jim Hylen / FNAL Page 1 NuMI Target Hall Air System Review Introduction Air system for.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
NUMI NuMI Internal Review July 27, 2001 Target Hall Shielding Review Page 1 Target Hall Shielding Review Radiation Safety Coordinator Nancy Grossman FNAL.
Overlap of Project X and Beamline to DUSEL June 2, 2008.
Convection: Internal Flow ( )
F NuMI Beamline Accelerator Advisory Committee Presentation May 10, 2006 Mike Martens Fermilab Beams Division.
Secondary beam production facility layout discussions SBLNF meeting 5 th Dec M. Calviani, A. Ferrari, R. Losito (EN/STI) H. Vincke (DGS/RP)
Activation around dump shielding, and design of beam line mask Mathieu Baudin, RP Genevieve Steele, EN-STI Helmut Vincke, RP.
GRAN SASSO’S HADRON STOP Temperature’s behaviour under specified beam conditions Barbara Calcagno.
NUMI Flexible Joint/Floating Clamp WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 10, 2001.
Simulation of heat load at JHF decay pipe and beam dump KEK Yoshinari Hayato.
Engineering studies for CN2PY secondary beam. LAGUNA-LBNO General Helsinki, 26/08/20141 F. Sanchez Galan (CERN) on behalf of the CERN Secondary.
Engineering studies for the Conceptual design of the LBNO Facility 1 F. Sanchez Galan (CERN) on behalf of the CERN Secondary Beam Working Group, With contributions.
Long-Baseline Neutrino Facility LBNF Beamline optimization schedule Vaia Papadimitriou LBNF Beamline Manager Accelerator and Beam Interface Group Meeting.
MARS15 Studies of Impact of LBNF Target/Horn Optimization on the Hadron Absorber 6 th High Power Targetry Workshop Merton College, Oxford April 12, 2016.
Design for a 2 MW graphite target for a neutrino beam Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007.
LBNE Target Pile & Decay Pipe Cooling Andy Stefanik and Ang Lee – Fermilab September 25, 2014.
Beamline for the LBNE Project Heidi Schellman for the LBNE collaboration.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
LBNE 2.4MW Absorber NBI 2014 Presented by Brian Hartsell Contributions by: Kris Anderson, Yury Eidelman, Jim Hylen, Nikolai Mokhov, Igor Rakhno, Salman.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
Lesson 7: Thermal and Mechanical Element Math Models in Control Systems ET 438a Automatic Control Systems Technology 1lesson7et438a.pptx.
Under floor heating Designing underfloor heating (UFH) system must always comply with the system suppliers instructions.
News and brief overview of Beamline plans for the next few months
CHEN, Fusan KANG, Wen November 5, 2017
Leonard Vasiliev, Alexander Zhuravlyov and Alexander Shapovalov
ET 438a Automatic Control Systems Technology
Heat Exchangers Heat Exchangers.
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
Beam dump for J-Parc neutrino facility
Presentation transcript:

Target chase, decay and absorber cooling for LBNE A. Marchionni, Fermilab 8th International Workshop on Neutrino Beams & Instrumentation CERN, November 2012 High beam-induced heat loads! LBNE cooling for target chase and decay pipe base design 700 kW: air cooling only 2.3 MW: add water cooling panels in target chase LBNE cooling for absorber Final considerations

Power Dissipation in Main Components NameTargetHornsTarget chase shield Decay pipe Decay channel shield Absorb. systems kW

Target pile and decay pipe cooling The base design is to have air cooled decay pipe, with air flowing at high velocity in the annular gap of two concentric decay pipes air cooled target pile at 700 kW and a combination of air cooling and water cooling at 2.3 MW common air supply for target pile and decay pipe at 15 °C. The reference design has an airflow rate of 50,000 scfm for the decay pipe The NuMI target pile has an airflow rate of 25,000 scfm at 700 kW Scaling from the 46 NuMI chase width to the 54 LBNE chase width, increases the LBNE target pile airflow rate to 35,000 scfm for 700 kW for 700 kW, the 35,000 scfm airflow removes the energy deposited by the beam in the bulk steel shielding for 2.3 MW, water cooling removes about 80% of the deposited energy and the balance is removed by the 35,000 scfm airflow

Target Chase and Decay Pipe airflow schematic

Decay Pipe Design Decay pipe air supply flows in the 20 cm annular gap Decay pipe air return Decay Pipe Waterproof barrier all around. Soil all around. Drainage layer all around. 5.5 m concrete Waterproof barrier all around. –Inner pipe: ½ thick, corrosion- protected mild carbon steel, supported on outer pipe with radial supports, 4 m inside diameter. –Outer pipe: ½ thick, corrosion- protected mild carbon steel, embedded in shielding concrete, m inside diameter. –Annular airflow gap between the concentric pipes is 20 cm.

Decay Pipe Cooling –The inner ½ thick steel pipe absorbs 56% of the energy before it can reach the concrete, and the annular air gap prevents that heat from being conducted out to the concrete –Peak heating is 35 m from upstream end of decay pipe –Closed air loop, 50,000 scfm flow rate, high velocity heat transfer coefficient 21 W/m 2 K –Air supply temperature = 15 °C (59 °F) –Air exit temperature from decay pipe = 33 °C (91.4 °F) –All operating temperatures are a concern but geomembrane temperature is a major concern –Geomembrane service life is a function of temperature. –Detailed information only available for HDPE Geomembrane strength half-life from Rowe (2005) o C o C o C

Decay Pipe Cooling Analysis Concrete peak temperature 40.5 °C Geomembrane temperature 35 °C Temperatures at point of peak heating

6 marble layer 6 borated polyethylene cover 18 shielding steel Carriage lateral beam (typ) Target hall floor Steel Concrete Chase T-blocks * Fixed chase shielding * * * * * Horn 1Horn 2 Target/baffle carrier Concrete Cooling panels

Target Hall Shield Pile Design Steel Concrete Chase cooling panels Horn 1 Carriage lateral beam Chase Marble layer Carriage longitudinal beam Chase Cooling panel 4 thick 2 thick

Target Hall cooling panels Gun-drilled cooling channel Radiation labyrinth step In the base design cooling panels are made of carbon steel

Target Hall Shield Pile Air Block NuMI target pile air block sheet. It is placed between bulk shielding layers. LBNE target pile air block sheet:

FEM 3-D Thermal Analysis of 700 kW A 3D thermal finite element model has been developed for NuMI target hall shielding blocks. For the 700 kW ME configuration, the maximum static temperature is 153C on the chase side wall (blue-block), and it is towards the downstream end of Horn 1. The radiation heat to horn and water tank is 4,290 watts. After all active cooling and heat are shut off, the horn temperature will not exceed 100 C. 25,000 scfm air flow

Estimated operating temperature for 700 kW beam is 170 °C with air cooling and no chase panel water cooling. Panel heat load is 2.4 W/kg. For comparison: Estimated operating temperature for 2.3 MW beam is 75 °C with air cooling plus chase panel water cooling. Panel heat load is 8 W/kg. LBNE Target Hall Shield Pile Cooling Chase height = 63" scfm

Absorber design Al core blocks (60x60x12) Iron core blocks (60x60x12) Al pre-mask Iron shielding blocks Concrete Absorber-core blocks will be instrumented with at least eight thermocouples, distributed radially every 45 at a radius of approximately 400 mm

Absorber cooling Iron Aluminum At least three continuous Al water-cooling lines are welded to the four sides of the core blocks Water temperature 25 °C

Absorber temperature analysis Longitudinal energy deposition in the Al core, normal operation Steady state temperature for the 3 rd Al core block, normal operation Accident condition, 15 direct beam pulses superimposed to steady conditions

Final considerations Base design for cooling of target chase, decay pipe and absorber has been presented, still at the conceptual phase radiological issues have been taken into account Experience with NuMI shows that tritium release and NOx induced corrosion can be minimized by dehumidification of air Still, need to consider the alternative of a He filled decay pipe (water cooled?) increase in ν flux by 5-10% presence of air limited to target chase, no transport of target chase air in decay pipe region Utilization of carbon steel for water cooling needs careful consideration many thanks for sharing T2K experience

Backup

Target Hall Shield Pile Air Flow Cross section through horn 1 at beam sheet point MC-ZERO. Steel shielding is cross-hatched. Top supply airflow. Flows downstream to upstream. Flows through T-blocks and other shielding blocks into the chase. Air block sheet metal separates the supply and return airflows. Side and bottom supply airflows. Flows downstream to upstream. Some air flows through the gaps in the bulk shielding. Chase return airflow. 7 wide side passage 5 high bottom passage

Neutrino Beam Decay Pipe CONCENTRIC ½ THICK STEEL PIPES. DECAY PIPE / INNER PIPE: 4M DIAMETER. OUTER PIPE: 4.4 M DIAMETER. 8 [203 mm] ANNULAR GAP FOR AIRFLOW BETWEEN THE INNER AND OUTER PIPES [0.6M] (MINIMUM COVER) VARIES WITH DEPTH OF DECAY PIPE [15.7 M] 50-6 [15.4 M] 54-3 [16.5 M] 18 [5.5 M] MINIMUM CONCRETE SHIELDING RADIAL SPACING FOR ½ THICK STEEL PLATE DISCONTINUOUS LONGITUDINAL WEBS. EACH WEB IS 5 LONG. WEB LONGITUDINAL SPACING IS 6. 30°

Neutrino Beam Absorber

Absorber Complex – Longitudinal Section Decay Pipe 94 Below Grade ~ 16 into rock Beamline Decay Pipe The Absorber is conceptually designed for 2.3 MW A specially designed pile of aluminum, steel and concrete blocks, some of them water cooled which must contain the energy of the particles that exit the Decay Pipe.