Business Department 1 Project Management C53PM Session 7 Project Budgeting Russell Taylor Business Department Staff Workroom

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

Flexible Budgets and Standard Costs
Cash flow THE TIMES 100. What is cash? Cash is notes, coins and bank deposits that provide firms with the spending power to pay their bills and expenses.
Set Up Instructions Place a question in each spot indicated Place an answer in each spot indicated Remove this slide Save as a powerpoint slide show.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2002 Pearson Education, Inc. Slide 1.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
1 The Academic Profession and the Managerial University: An International Comparative Study from Japan Akira Arimoto Research Institute for Higher Education.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
WARM UP What is the value of 4 5 x 4? Explain. WARM UP What is the value of 4 5 x 4 3 ? Explain.
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
ZMQS ZMQS
12 Financial Management 12-1 Financial Planning
ANALYZING AND ADJUSTING COMPARABLE SALES Chapter 9.
Database Design Using the REA Data Model
Key Concepts and Skills
Time Management F OR A S MALL B USINESS. TIMEMANAGEMENT 2 Welcome 1. Agenda 2. Ground Rules 3. Introductions.
Chapter 7: Project Cost Management
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
Spring 2008, King Saud University Cash Flow Analysis Dr. Khalid Al-Gahtani 1 Payment schedule Materials Mobilization Monthly payments Final Payment Contract.
What Is Cost Control? 1 Controlling Foodservice Costs OH 1-1.
ABC Technology Project
Mental Math Math Team Skills Test 20-Question Sample.
Strategic Capacity Planning
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter Eleven Cost Behavior, Operating Leverage, and CVP Analysis.
VOORBLAD.
A Key to Economic Analysis
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
1..
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Planning for Profit and Cost Control
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Equal or Not. Equal or Not
Slippery Slope
Week 1.
Flexible Budgets and Performance Analysis
Guide to Estimating.
We will resume in: 25 Minutes.
12 Financial Management 12-1 Financial Planning
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Fundamentals of Cost Analysis for Decision Making
Intracellular Compartments and Transport
A SMALL TRUTH TO MAKE LIFE 100%
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Essential Cell Biology
How Cells Obtain Energy from Food
The Student Handbook to T HE A PPRAISAL OF R EAL E STATE 1 Chapter 23 Yield Capitalization — Theory and Basic Applications.
1 Project Management C13PM Session 5 Introducing Breakdown Structures Russell Taylor Business Department Staff Workroom
1 Project Management C53PM Session 6 Project Resource Scheduling Russell Taylor Business Department Staff Workroom
Presentation transcript:

Business Department 1 Project Management C53PM Session 7 Project Budgeting Russell Taylor Business Department Staff Workroom

Business Department 2 Session 7 Projects Budgeting –Chapter 7 "It's clearly a budget……… it's got a lot of numbers in it."

Business Department 3 Project Objectives Time CostQuality Meet quality and scope requirements Deliver project on time Deliver project within budget

Business Department 4 Cost Planning Scottish Parliament –Initial Budget £40mFinal £415m Sydney Opera House –Initial Budget $A6mFinal £A100m Londons Jubilee Line extension –Initial Budget £2.1bnFinal £3.5bn Millennium Dome –Construction costs £50mFinal grant £628m Channel Tunnel –Initial Budget £4.8bnFinal £10bn

Business Department 5 Budget & Cash flow Budget –A sum of money allocated for a particular purpose –Sum of money for all planned expenses Profit –The net excess of revenue after expenses in a given period Cash flow –An analysis over a period of time revealing the availability, or lack, of cash. –The difference between cash in (income) vs. cash out (expenses).

Business Department 6 Cost Planning Income – Expenditure = 0 Income – Expenditure = +1 Income – Expenditure = -1 X

Business Department 7 The Project S-curve Formation Phase out Development Implementation Cost

Business Department 8 Project budgeting Level of detail –Outline budget –Long-range plan –Short-range plan Budget Structure –Compatible with existing systems –Excel system Information gathering –Experience –Estimates –Calculations

Business Department 9 Approaches to Budgeting Top-down budgeting –Experience of top and middle managers –Strategic long range plan Bottom-up budgeting –Project Manager – detailed budget proposals –Functional Manager – Midrange budget Iterative budgeting –Top management – set budget for each year –Selection of new projects –Guideline for budgeting

Business Department 10 Major Budgeting Processes 1.Resource Planning –People, Equipment, Materials, Overheads 2.Cost Estimating –Developing approximate cost for each resource 3.Cost Budgeting –Relating cost estimates to schedule –Producing time-phased cost & cash-flow predictions 4.Cost Control –Controlling cost in relation to project schedule

Business Department Resource Planning Activity Owner –Who will do the work Knowledge workers –Other organisational units Consultants Equipment Materials

Business Department Cost Estimating Analogous Estimating –Top-down approach –Limited information –Historical data Parametric Estimating –Selected quantifiable characteristics –Area, volume, location –Historical data Definitive Estimating –Bottom-up approach –Cost individual work items (WBS) –Bills of Quantities Sample

Business Department Cost Estimating New wire Re wire Water Gas Carpets Laminate Paper Paint House Refurbishment 2.0 Services1.0 Management3.0 Decorating 1.1 Planning 1.2 Costing 1.3 Specify 2.1 Electrical 2.2 Plumbing 3.1 Floors 3.2 Walls Quito D&B Design team Tradesmen Electrician Plumber Control Account

Business Department Cost Estimating New wire Re wire Water Gas House Refurbishment 2.0 Services 1.0 Management 3.0 Decorating 1.1 Planning 1.2 Costing 1.3 Specify 2.1 Electrical 2.2 Plumbing 3.1 Floors 3.2 Walls Quito D&B Design team Tradesmen Electrician Plumber Control Account Cost Breakdown Structure (CBS)

Business Department 15 WBSActivity NameUnitUnit CostSub-totalTotal 1.0Venue Venue Hire Furniture 1.2.1Table Hire Table Cloths Candles Chair Hire Entertainment Band Hire DJ Refreshments Food 3.1.2Sandwiches Canapé Drinks 3.2.1Wine Soft Drinks Generating Budget

Business Department 16 Cost Estimate WBS CodeCostSub-totalTotalResource 2.0SERVICES 2.1ElectricalElectrician 2.1.2New Wire Lounge£ Garage£ £ Re-wire Kitchen£ Bedroom£ £ £ Donna

Business Department Cost Budgeting Estimate overall Project cost Estimate weekly/monthly cash-flow –Pay suppliers –Pay Employees Ensure Cash is available Ensure Spending control

Business Department Cost Budgeting ActivityDependencyDurationCost (£1000) A-51.5 B-33.0 CA, B83.3 DA74.2 E-75.7 FC, D, E46.1 GF

Business Department Cost Budgeting Network A B E D C F G

Business Department 20 EST Gantt Chart Activity weeks ABCDEFGABCDEFG 1.5k 3.0k 3.3k 4.2k 5.7k 6.1k 7.2 k

Business Department 21 LST Gantt Chart Activity weeks ABCDEFGABCDEFG 1.5k 3.0k 3.3k 4.2k 5.7k 6.1k 7.2 k

Business Department 22 S-Curve Late start Early start Cumulative cash flow - S-curve £ week

Business Department 23 Summary The importance of project budgeting Identified activities associated with project budgeting Discussed the main techniques used in cost estimating Top-down, bottom-up & iterative budgeting Construction of a Cost Breakdown Structure (CBS) Constructed a time-phased project budget Constructed an S-Curve

Business Department 24 Take-a-break