Helicity Magnets for PQB Feedback Helicity Magnets for PZT Booster

Slides:



Advertisements
Similar presentations
5 MeV Mott Measurement for CEBAF Operations group Joe Grames, Marcy Stutzman February 14 th, 2007 Sir Nevill F. Mott at the ceremony with his Nobel Prize.
Advertisements

CEBAF Photoinjector: What’s new, what’s the same since HAPPEx 2004? What needs to be done? M. Poelker, HAPPEx collaboration meeting, Feb. 18, 2005.
Parity Quality Beam (PQB) April 07, Notes: 1.For each BPM, the wires are: +X+, +X-, +Y+, +Y- 2.There are only two injector BPMs we are not reading:
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
1. Describe helicity magnet (HM) system 2. Con’s of PZT’s & Pro’s of HM–type system for BT measurements 3. Other Possibilities, Comments from BT & Planning.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
PN12 Workshop JLab, Nov 2004 R. Michaels Jefferson Lab Parity Violating Neutron Densities Z of Weak Interaction : Clean Probe Couples Mainly to Neutrons.
Electronic Cross-talk & Ground Loop Elimination in Injector Riad Suleiman Center for Injectors and Sources.
PQB Photocathode Analyzing Power Study May 19, 2009.
JLab Polarized Source Happex Collaboration Meeting May 18, 2007 P. Adderley, J. Brittian, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Polarized Source Development Run Results Riad Suleiman Injector Group November 18, 2008.
Polarimetry of Proton Beams at RHIC A.Bazilevsky Summer Students Lectures June 17, 2010.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
Hall A Parity Workshop (May 10, 2002), 1 Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson.
Nuruzzaman ( Hampton University Group Meeting 1 st November 2011 Beamline Optics Using Beam Modulation for the Q-weak Experiment.
Short Tutorial on Causes of Position Differences… …and what we can do about them (most slides stolen from Cates PAVI ’04 talk)
G 0 Coordinator Update & “To-Do List” Joe Grames William & Mary, June 5-6, 2006  Hall C Beam Line Tasks  Accelerator Preparation Tasks  Beam Halo 
#3191, 14 Oct 2012 Cabling installed to allow fast BPM electronics on injector BPMs System is flexible enough to allow different INJ-BPMs to be used (not.
ExperimentEnergy (GeV) Pol (%) I (µA) TargetA pv (ppb) Maximum Charge Asym (ppb) Maximum Position Diff (nm) Maximum Angle Diff (nrad) Maximum Size Diff.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
HAPPEX DAQ / ADC Tests Luis Mercado UMASS 4/17/09.
Helicity Magnets Commissioning February 7, 2007 Hari Areti, Chao, Brad Cumbia, Jeff Dale, Richard Dickson, Joe Grames, Roger Flood, Scott Higgins, Matt.
RHIC CNI Polarimeter status RHIC CNI Group February 26, 2008.
… Work in progress at CTF3 … Davide Gamba 01 July 2013 Study and Implementation of L INEAR F EEDBACK T OOLS for machine study and operation.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
G 0 PC Installation and Beam Studies Stephanie Bailey Riad Suleiman.
Beam Optics for Parity Experiments Mark Pitt Virginia Tech (DHB) Electron beam optics in the injector, accelerator, and transport lines to the experimental.
Injector Status & Commissioning QWeak Collaboration Meeting May 24, 2010 P. Adderley, J. Clark, S. Covert, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
12/16/03Tev BPM requirements1 Tevatron BPM requirements Mike Martens.
BooNE Meeting, January 15, Prebys 1 How are we doing? Best running Power loss (W) Protons (p/min) Energy Lost (W-min/p) Best running again ? Mysterious.
Parity Experiments and JLab Injector Riad Suleiman February 5, 2016.
CEBAF Source and Injector Status PREx-II Collaboration Mtg Feb. 26, 2016 Matt Poelker and Joe Grames Center for Injectors and Sources.
G 0 Project Coordinator Report Joe Grames “Big Picture” Schedule Preparations Polarized Source Injector Accelerator Hall C Accelerator Plans for 687 MeV.
1CEA/ Saclay/ SACM CARE/SRF/WP11 Development of a new Beam Position Monitor for FLASH, XFEL and ILC Cryomodules Claire Simon, Michel Luong, Stéphane Chel,
Parity Quality Beam (PQB) B-Team Meeting September 10, 2008.
Polarized Injector & Upgrade Schedule QWeak Collaboration Meeting November 06, 2009 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Polarized Injector Update
Spin Precession At CEBAF
Auxiliary Positron Source
Proposals for 2015 impedance-related MD requests for PSB and SPS
Tango status at Elettra
A Mini-Primer for Parity Quality Beam (as seen from the Accelerator)
Accelerator Physics and Engineering Update Jan 6, 2010
The G0 experiment at JLAB
G0 Backward Angle Accelerator Preparations
G0 Accelerator Planning Meeting (11/1/05)
Parity Violation Experiments at JLEIC
Parity Quality Beam (PQB)
Accelerator Issues Raised in Hall A Parity Collaboration Meeting, April B-Team Meeting April 29, 2009.
Thoughts on why G0 needed position feedback and HAPPEX didn't
Thoughts on why G0 needed position feedback and HAPPEX didn't
QWeak Collaboration Meeting
Qweak Coordination Meeting
Beam-Based Alignment Results
Accelerator Physics and Engineering Update Jan 6, 2010
Adiabatic Damping and Parity Quality of Low Energy
Towards a ground motion orbit feed-forward at ATF2
Feedback Systems Joe Grames Hall A Parity Meeting Jefferson Lab
Injector Studies Using Superlattice Photocathode
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Helicity Magnets’ Control Upgrade
Linac/BC1 Commissioning P
Polarized Source: Recent Activities
PQB Meeting March 05, 2009.
B-Team Meeting October 28, 2009
ThomX – Commissioning Meeting – 25/01/2018
Injector Commissioning & Optimization
HALLA APEL REPORT Yves Roblin Hall A colllaboration Meeting
CLEAR’s Inductive Beam Position Monitors
Presentation transcript:

Helicity Magnets for PQB Feedback Helicity Magnets for PZT Booster Helicity Magnet Update Grames, Yves, Chao, Michele, Dickson, Flood, Cumbia BTeam Meeting, 10 January 2006 Helicity Magnets for PQB Feedback Helicity Magnets for PZT Booster 1. The injector group got their first experience with the new strained layer superlattice GaAs crystals during a real experiment (Happex He and a little bit of hydrogen). 2. To check whether or not helicity-correlated properties will be significantly different at 800 MeV, we plan to submit a test plan to run at 1 pass beam energy. 3. HAPPEx managed to get pretty good position differences with no position feedback. 4. Results on microwave cavity monitor electronics were obtained in Hall A; the electronics still needs more work; continued work on this is planned in Hall A during the fall.

Helicity Magnets Commissioning ATLIS 4271 w/ new PC104 magnet card on 12/22, 2005 All 4 helicity magnets appear to be linear, independent (not coupled), and electrically isolated Each magnet manifest some saturation when DAC value around -1500 (full range is -2000 to +2000) Resolution is about 100 nm/DAC step, new DAC to be installed in January will give 10 nm/DAC step Position feedback seems viable. Can do both position and angle corrections (x,x’) and (y,y’) Correction in both helicity states (not done yet)

Helicity Magnet 1 (vertical)

Helicity Magnet 2 (horizontal)

Helicity Magnet 3 (vertical)

Helicity Magnet 4 (horizontal)

Position Feedback Induced Charge Asymmetry As measured in the 5 MeV region around OLO5: PZT x-scan on January 21, 2005: Position induced charge asym ~ 50 ppm/um Helicity Magnet 2 scan on Dec 22, 2006: Position induced charge asym ~ 0.5 ppm/um

HM for PZT Booster ATLIS 4249 - Install 30hz Drive Capacity for HM ATLIS 4183 – Testing Helicity Magnets (w/ 30 Hz functionality) all 4 HM work in new 30 Hz BPM synchronization mode amplitudes appear sufficient (2-5 mm), although MHE0L03V is somewhat smaller 30 Hz orbit stable PZTBooster concept seems viable

PZT Booster Development Chao/Yves/Michele/Joe – working together to define goals, requirements, software, testing and plans. Basic goal => mimic small amplitude 30Hz PZT mirror orbit through entire machine, for matching. Anticipate being able to test/debug software during Jan. restoration and G0 setup period, but not scheduled yet because too soon to do so. Anticipate full scale testing at latest during BS in February to be requested as preparation tests.