The Instrumentation Unit of The KM3NeT Calibration Unit

Slides:



Advertisements
Similar presentations
SeaCycler AST2 Surface Piercing Profiler Technology.
Advertisements

ULTRASONIC WATER AND FLOW METERS
Work Package 2 / 3 TECHNOLOGIAL & PROCEDURAL HARMONISATION FixO3 General Assembly 14 th to the 16 th October 2014, Heraklion-CRETE ANTARES, CNRS, D.Lefevre,
Acoustic Doppler Current Profiler Technology Trevor Lykens, Tim Sisk, Chris Tomichek December 20, 2005.
Open Channel Flow Panel Meters The materials included in this compilation are for the use of Dwyer Instruments, Inc. potential customers and.
Communications Technologies Bertinoro 2009
Status of the ANTARES Neutrino-Telescope Alexander Kappes Physics Institute University Erlangen-Nuremberg for the ANTARES Collaboration WIN´05, 6.–11.
RAPID-MOC Mooring Array Instrumentation l Instrument types and specifications l Telemetry.
ChannelMaster Horizontal ADCP
Introduction to future synergy options Uli Katz ECAP, Univ. Erlangen Deep Ocean Cabled Observatories Amsterdam, May 2012.
ADCP Acoustic Doppler Current Profiler
Martha's Vineyard Coastal Observatory Shore Lab Meterorological Mast Solent Model R3 Wind speed Wind direction VaiPTU Air Temperature Relative humidity.
D. Lefèvre et al. Meust Marseille Oxygen Dynamics in the Ocean Lefèvre, D., A. Robert, C.Tamburini, M. Boutrif, S. Martini K. Arnaud, S. Beurthey,
DOPPLER VOLUME SAMPLER (DVS) HARDWARE DESCRIPTION HIGH SPATIAL/TEMPORAL RESOLUTION SHORT RANGE PROFILING.
ARGO, Profiling Floats, and Iridium Stephen C. Riser Dana Swift School of Oceanography, University of Washington [acknowledgements to NOAA, ONR, NSF, NASA]
Measuring pressure. Conductivity, Temperature and Depth (CTD) Despite the name, all CTDs actually measure pressure, which is not quite the same thing.
A PILOT EXPERIMENT ON THE TEMPORAL VARIABILITY OF THE NEPHELOID AND DYNAMICAL STRUCTURES IN THE BESOS CANYON (NW MEDITERRANEAN SEA) [1] Instituto de Ciencias.
Salinometer Thermosalinograph (TSG) CTD
SINP MSU, July 7, 2012 I.Belolaptikov behalf BAIKAL collaboration.
AST2 Hypbrid Profiler Mooring PDR Ocean Observatories Initiative Coastal & Global Scale Nodes At Sea Test 2 Hybrid Profiler Mooring Preliminary Design.
INSTRUMENTATION NEEDS FOR THE CALIBRATION UNIT …AS A WORK DOCUMENT Pascale Keller KM3Net Meeting CPPM, january 2013 Inputs from : Miguel Ardid, Tassos.
OOI Annual Review Year 2 May 16 – 20, 2011 Ocean Observatories Initiative Surface and Subsurface Mooring Telemetry Inductive and acoustic technology and.
S. Viola VLVνT 2015, Rome – 14/09/2015 Characterization and testing of the KM3NeT acoustic positioning system F. Simeone VLVνT 2015 – Rome, 14/09/2015.
Data Buoy Cooperation Panel Scientific and Technical Workshop Scripps Institution of Oceanography La Jolla, CA Recent Buoy Developments at NOAA/NOS/CO-OPS.
OOI Annual Review Year 2 May 16 – 20, 2011 Ocean Observatories Initiative SIO Mechanical Design Samples 64” Float Designs: Global Hybrid Profiler Mooring,
MS Calibration for Protein Profiles We need calibration for –Accurate mass value Mass error: (Measured Mass – Theoretical Mass) X 10 6 ppm Theoretical.
Review of Positioning in ANTARES Dr. Lee F. Thompson Department of Physics and Astronomy University of Sheffield Special thanks to Vincent Bertin, CPPM.
Ship-based observations: CTD, Nansen and Niskin bottles, inverting thermometer and Acoustic Doppler Current Profiler Ben Lee December 2, 2005 EPS 131.
ALOHA-MARS Mooring Moorings called for in many OOI plans Features –Enables adaptive sampling –Distributes power, communications, time throughout the water.
Moorings and Current Meters Ellen Martinsek EPS 131 December 14, 2005.
Acoustic Doppler Technology for Streamflow Data Collection
Background Real-time environmental monitoring is a field garnering an ever-increasing amount of attention. The ability for sensors to make and publish.
On Reynolds Stresses over Wind Waves Tel-Aviv University School of Mechanical Engineering Supported by Israel Science Foundation Lev Shemer and Andrey.
Ocean-Tune: A Community Ocean Testbed for Underwater Wireless Networks Puget Sound Deployment Revision 0.1 July 19, 2012 Sumit Roy, Payman Arabshahi
G. Riccobene, INFN-LNS Nikhef, May 24-25, 2012 Giorgio Riccobene INFN-Laboratori Nazionali del Sud Abyssal undular vortices in the Eastern Mediterranean.
PPM DU Sea Qualification Tests 1.General constraints & requirements 2.Preliminary tests 3.Full mechanical test.
Status and Advances on the Acoustic Positioning System for KM3NeT Giuseppina Larosa, IGIC-UPV KM3NeT General Meeting, Nikhef 28-31/03/2011.
VLVNT’08 - ToulonM. Ardid – Positioning System of the ANTARES Neutrino Telescope Positioning system of the ANTARES Neutrino Telescope Miguel Ardid (IGIC.
Wet Demonstrator Objectives. 2 A Brief History Functional Requirements First DraftJuly 2014 Wet Demonstrator Scope First DraftJuly 2014 Singapore Workshop.
ATM-900 Series Acoustic Telemetry Modems Introduction and Overview Communication Group: Justin Manley – Senior Director of Business Development Debbie.
KM3NeT-Toulon Infrastructure 22/06/121 NB: focus on latest developments, see February presentation in Catania for details KM3NeT meeting Erlangen,
Argo Floats and Near-Surface Temperature Stephen Riser University of Washington, USA.
Earth-Sea Science Junction Boxes
Calibration and Instrumentation: Overview and General Issues Robert Lahmann WPFL meeting Amsterdam 6-July-2010.
Status of the NEMO tower validation Integration Tests Improvements Deployment program M.Anghinolfi- km3-day meeting )
KM3NET-IT Tower Power System Rosanna Cocimano for KM3NET-IT Power Group 26 november
Pre-Production Models for KM3NeT
Deep Observing Network
Positioning system Hardware
Deep-sea neutrino telescopes
Cold-Chain Expert, Total Solution Quality Precision Service Value
GammaTRACER Key features
The Instrumentation Unit (IU) of the Calibration Unit (CU)
The Instrumentation Unit (IU) of the Calibration Unit (CU)
Interdisciplinary Activity ANTARES
APC - Calibration Unit (Electronics implantation part)
Expandable Seafloor Observatory
Junction Boxes for KM3NeT
Calibration Unit (on behalf of Miles Lindsey Clark)
Simplified Study of Storey Configurations
Snow Buoy Snow Buoys (or snow height beacons) measure relative changes in snow height around the platform by means of 4 ultra-sonic snow depth sensors.
Module – Groundwater Level Measurement
Ocean Instrumentation
a Marine Environment Tests and Research Infrastructure
Pressure Level Sensor OTT PLS
Stephen Farrington, PE (Transcend)
Present Status of APEX Float Technology
Laboratory in Oceanography: Data and Methods
ARGO, Profiling Floats, and Iridium
in situ or Altimetry ? Arctic – Subarctic Ocean Fluxes focus topics:
Presentation transcript:

The Instrumentation Unit of The KM3NeT Calibration Unit KickOff Feder, 21/06/2017

The Calibration Unit Independant line dedicated to the calibration of the detector Particularity of the line: inductive line in order to save money Needed for the Calibration in time and in position : Calibration in time : inter DU time calibration with the use of laser light emission Calibration in position : acoustics emitter/receiver for the relative acoustic positioning system Calibration in position : measurements of oceanographic parameters to know the sound velocity + sea current measurement

The Calibration Unit Global sketch of the Calibration Unit : CU CPPM APC - Laser : time calibration - Acoustics : relative positioning

The Instrumentation Unit (IU) for the Calibration Unit Inductive Instrumentation Unit directly inspired of the Albatross line The IU is composed by one inductive Instrumentation Line (IL) and one titanium Instrumentation Base container (IB) The IL hosts all the oceanographic instruments linked to the line via an inductive interface that communicate with inductive modem (SeaBird, rate 1200 bauds) The instruments are autonomous in terms of energy using internal batteries The IU is recoverable in order to change the batteries and to calibrate some of the instruments that need recalibration periodically (about once every 2 years) The IU will be connected to the electric interlink cable with a ROV via the IB wet matable connector

The instruments for the CU The IU is linked to the Calibration Base of the CU via one 50 m electric serial cable using RS422 serial communication for the data transfert : 4 electrical points for the RS422 link 2 electrical points for the 12V power (supplied by CB) The configuration of the IL in order to intrument the full water column of the KM3Net detector for the ORCA version (vertical height 200m) is the following :   3 CTD probe (Conductivity, Temperature, Depth) theses parameters are used to calculated the sound water speed with the Chen&Millo empiric formula 3 currentmeter : measures the sea current 3 SV : Sound velocimeter : direct measurement of the sound velocity  One measurement of each instrument every 20 minutes, transmitted in «real time» to the CB

The instruments of the IU - CTD from SeaBird : (SBE 37IMP-ODO-1b) Inductive instrument   Initial Accuracy Conductivity ± 0.0003 S/m  Temperature °C ± 0.002 (-5 to 35 °C); Oxygen ± 2% of saturation Pressure ± 0.1% of full scale range - Sound Velocimeter from Valeport MiniSVS : Range:1375-1900m/s Resolution: 0.001m/s Accuracy: theoretical max error from ±0.017m/s to ±0.02 m/s depending on sensor size. Non Inductive instrument and non powered : need an extra serial/inductive interface - Currentmeter : Aquadopp6000 from Nortek : Local measurement of the sea current Range: ± 3m/s Accuracy: 1% of measured value ± 0.5 cm/s Non Inductive instrument : need an extra serial/inductive interface Could be replaced by ADCP : Acoustic Doppler Current Profiler (current profile on the water column)

Status of the IU Test bench operationnal in CPPM : Simul. Inductive cable Simul. IU Manager (CB) IMM : inductive modem Simul. Inductive cable coupler UIMM serial/inductive adapter : to interface Aquadopp currentmeter all instruments (CTD, currentmeter, celerimeter) are now correctly interfaced and configured via inductive modem. Launch of measurement and retrieve of the data are operational

Status of the IU Mechanics : Global mechanics design almost completed Global deployment steps defined  Full detailed deployment procedure under redaction