PDO Second Alert What happened? Your learning from this incident..

Slides:



Advertisements
Similar presentations
PDO Second Alert What happened? Your learning from this incident..
Advertisements

Always use mechanical handling aids when carrying out a heavy lift
Always ensure travelling block is stationary during DM changeover
Always use mechanical handling aids when carrying out a heavy lift
Always stay alert while driving, and observe other drivers behaviour
Always use 3 points of contact when using ladders
PDO Second Alert Date: Incident : LTI What happened?
Comply with Safe Operating Procedures
PDO Second Alert What happened? Ensure you are out of the danger zone
Always stay out of the line of fire
Never place yourself in line of fire
Ensure all safety covers and guards are secured and in place
PDO Second Alert Date: Incident title: Fall from Height
Always ensure the correct grade and length bolts are used
PDO Second Alert Stay out of the line of fire What happened:
Identify Pinch Points and keep your Hands & Fingers away
Do not work at height without fall protection
Ensure a working platform is adjusted and used
Follow Management of Change for an activity which is not in permit
Always Drive to road conditions
PDO Second Alert What happened?
PDO Second Alert What happened? Your learning from this incident..
Keep away form ‘line of fire’
Ensure 3 point contact maintained whilst using ladder
Ensure OHL Clearance required for your lifting activity
No hands on elevator while delivering pipe
Never put your Hands in line of fire
PDO Second Alert What happened? Your learning from this incident..
Ensure cat line are under tension before removing elevator bolts
PDO Second Alert Date: Incident title: LTI What happened?
Adequate tethered tools
PDO Second Alert Always follow the PTW procedures
Photo explaining what was done wrong
Safety Critical Devices can Save the Lives & Protect Asset
Unsecured pup joint falling
Identify, Verify & Monitor Barriers
Crane operating with boom lowered and under Supervision
PDO Second Alert Use Hands Free Lifting Aids What happened?
Always report Near Misses
PDO Second Alert Date: Incident title: HiPo Asset Damage
Always use secondary retention
Always keep your hands away from crush points (Line of Fire)
Always use your hands to set the slips
Ensure that all Rig moves are carried out by competent personnel
Always stay away from line of fire
PDO Second Alert What happened? Your learning from this incident..
When operating the Tongs under tension, make sure all crew keep clear
PDO Second Alert Date: Incident title: HiPo What happened?
Always ensure “no go” zone are in place
PDO Second Alert Date: Incident title: MVI Rollover
Check equipment prior to start the job
PDO Second Alert What happened? Your learning from this incident..
PDO Second Alert Photo explaining what was done wrong
Always ensure your journey is authorised
Confidential - Not to be shared outside of PDO/PDO contractors
Seek assistance of Banksman while reversing the vehicle
Use only certified lifting equipment in good condition
Safe distance from the edge Maintain a safe distance while driving
PLAN AND DOCUMENT CHANGES TO THE OPERATION
Always keep your hands and fingers away from the Line of Fire
Always keep your equipment maintained
Effective communication prevents incidents
Check Level Setup prior Lifting & Lowering Operation
Always use fit for purpose lifting accessories
Always adhere to Red/No Go zones
Vehicles to Keep Safe Distance at all times
Always position the crane boom correctly before slinging the casing
Keep away from the line of fire
Keep hands out of the line of fire
Use hands-off where possible
Presentation transcript:

PDO Second Alert What happened? Your learning from this incident.. Date: 23-02-2018 Incident title: Asset Damage What happened? While laying down 4½” liner running tool (16 Meters length) using crane from V door side and elevator from the rig floor, the R/T got broken at 1.5m height, from the rotary table. One side of the broken tool (weight 300Kg), swung towards the draw works and remained suspended on the Elevator. The other broken part (Weight 55Kg), that came in contact with the rig floor, remained suspended on the crane. Your learning from this incident.. Always ensure 3rd party supervision is on the drill/work floor while running or laying down any 3rd party tools Ensure effective two-way communication at all times Ensure you are authorised to carry out the task Drillers should not perform any task involving 3rd party tools without clear instructions/confirmation of the Tool Pusher & DSV Ensure adequate work instructions/TRIC card /Lift plan, to control the work between all parties involved Tool lifted without adequate supervision 3rd party supervisor Always ensure 3rd party supervision while handling their 3rd party tools Ensure adequate third party supervision

Management self audit Date: 23rd February 2018 Incident: Asset Damage As a learning from this incident and to ensure continual improvement all contract managers must review their HSE HEMP against the questions asked below Confirm the following: Do you ensure work instructions for the tasks involved with 3rd parties? Do you ensure adequate communication between the third parties ? Do you ensure instruction are conveyed only through the site in charge/TP? Do you ensure specific written procedures for handling tools/equipment of 3rd party’s/subcontractors incorporated into the written work instructions and / or available at site? Make a list of closed questions (only ‘yes’ or ‘no’ as an answer) to ask other contractors if they have the same issues based on the management or HSE-MS failings or shortfalls identified in the investigation. Pretend you have to audit other companies to see if they could have the same issues.