ABSTRACT A damped detuned structure (DDS) for the main linacs of CLIC is being studied as an alternative design to the present baseline heavily damped.
Advertisements

Breakdown Rate Dependence on Gradient and Pulse Heating in Single Cell Cavities and TD18 Faya Wang, Chris Nantista and Chris Adolphsen May 1, 2010.
Single-Cell Standing Wave Structures: Design
CLIC08 workshop Structure production: CERN activities and Master Schedule G. Riddone, W. Wuensch, R. Zennaro, Contributions from C. Achard, S. Atieh, V.
Choke-mode Damped X-band Structure for CLIC Main Linac Hao ZHA, Jiaru SHI CERN Sep 27, 2011 Jiaru Shi, LCWS11 Workshop, Granada1.
Choke-mode damped accelerating structures for CLIC main linac Hao Zha, Tsinghua University Jiaru Shi, CERN
CLIC drive beam accelerating (DBA) structure Rolf Wegner.
ABSTRACT A damped detuned structure (DDS) for the main linacs of CLIC is being studied as an alternative design to the present baseline heavily damped.
Accelerator Science and Technology Centre Prospects of Compact Crab Cavities for LHC Peter McIntosh LHC-CC Workshop, CERN 21 st August 2008.
Compact Linear Collider. Overview The aim of the CLIC study is to investigate the feasibility of a high luminosity linear e-/e+ collider with a centre.
S. N. “ Cavities for Super B-Factory” 1 of 38 Sasha Novokhatski SLAC, Stanford University Accelerator Session April 20, 2005 Low R/Q Cavities for Super.
Development of an X-band Dielectric PETS C. Jing, Euclid Techlabs / ANL HG Workshop, May
INVESITGATION OF AN ALTERNATE MEANS OF WAKEFIELD SUPPRESSION IN CLIC MAIN LINACS CLIC_DDS.
CARE07, 29 Oct Alexej Grudiev, New CLIC parameters. The new CLIC parameters Alexej Grudiev.
X-band Structures Test Results at NLCTA Faya Wang Chris Adolphsen, Christopher Nantista 9-Feb-11.
July Alexej Grudiev, Improvement of CLIC structure. Possible improvement of the CLIC accelerating structure. From CLIC_G to CLIC_K Alexej.
INVESITGATION OF AN ALTERNATE MEANS OF WAKEFIELD SUPPRESSION IN CLIC MAIN LINACS CLIC_DDS.
ABSTRACT A damped detuned structure (DDS) for the main linacs of CLIC is being studied as an alternative design to the present baseline heavily damped.
ABSTRACT The main accelerating structures for the CLIC are designed to operate at 100 MV/m accelerating gradient. The accelerating frequency has been optimised.
CLIC MAIN LINAC DDS DESIGN AND FORTCOMING Vasim Khan & Roger Jones V. Khan LC-ABD 09, Cockcroft Institute /14.
Wakefield suppression in the CLIC main accelerating structures Vasim Khan & Roger Jones.
Design of Standing-Wave Accelerator Structure
Vasim Khan X-Band RF Structures, Beam Dynamics and Sources Workshop, Cockcroft Institute /21 CLIC_DDS_HPA study
Vasim Khan X-Band RF Structures, Beam Dynamics and Sources Workshop, Cockcroft Institute /24 CLIC_DDS study
ABSTRACT The main accelerating structures for the CLIC are designed to operate at 100 MV/m accelerating gradient. The accelerating frequency has been optimised.
Different mechanisms and scenarios for the local RF
DDS limits and perspectives Alessandro D’Elia on behalf of UMAN Collaboration 1.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
Course B: rf technology Normal conducting rf Part 5: Higher-order-mode damping Walter Wuensch, CERN Sixth International Accelerator School for Linear Colliders.
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
Overview of CLIC main linac accelerating structure design 21/10/2010 A.Grudiev (CERN)
2nd CLIC Advisory Committee (CLIC-ACE), CERN January 2008 Introduction to the CLIC Power Extraction and Transfer Structure (PETS) Design. I. Syratchev.
Development of Dielectric PETS Chunguang Jing and Wei Gai ANL and Euclid CLIC workshop 2013.
New RF design of CLIC DB AS Alexej Grudiev, BE-RF.
Higher-Order Modes and Beam-Loading Compensation in CLIC Main Linac Oleksiy Kononenko BE/RF, CERN CLIC RF Structure Development Meeting, March 14, 2012.
LLRF for EUCARD Crab Cavities Graeme Burt (on behalf of Amos Dexter) Paris May 2011.
CLIC crab cavity design Praveen Ambattu 24/08/2011.
The CLIC accelerating structure development program Walter Wuensch CARE05 23 November 2005.
Hybrid designs - directions and potential 1 Alessandro D’Elia, R. M. Jones and V. Khan.
Optimization of CLIC-G structure & Design of CLIC open structure Hao Zha, Alexej Grudiev (CERN) Valery Dolgashev (SLAC) 27/01/2015.
TESLA DAMPING RING RF DEFLECTORS DESIGN F.Marcellini & D. Alesini.
1 Design and objectives of test accelerating structures Riccardo Zennaro.
Accelerating structure prototypes for 2011 (proposal) A.Grudiev 6/07/11.
ELI and other things A. D’Elia 1. C-BAND STRUCTURES FOR MULTI-BUNCH RF LINACS: ELI_NP PROPOSAL Bunch charge 250 pC Number of bunches 40 Bunch distance.
Feasibility and R&D Needed For A TeV Class HEP e+e- Collider Based on AWA Technology Chunguang Jing for Accelerator R&D Group, HEP Division, ANL Aug
Advancements on RF systems D. Alesini (LNF-INFN) Quinto Meeting Generale Collaborazione LI2FE, Frascati 15-16/03/2011.
Structure Wakefields and Tolerances R. Zennaro. Parameters of the CLIC structure “CLIC G” (from A. Grudiev) StructureCLIC_G Frequency: f [GHz]12 Average.
Test Accelerating Structures Designs, Objectives and Critical Issues
A 6 GeV Compact X-ray FEL (CXFEL) Driven by an X-Band Linac
New test structures for CLIC (RF design)
Abstract EuSPARC and EuPRAXIA projects
Development of X-band 50MW klystron in BVERI
Vasim Khan & Roger Jones
Dielectric accelerators in Microwave regime and a short pulse collider concept Chunguang jing AWA & Euclid Techlabs AWLC2017 June, 2017.
Status of the CLIC main beam injectors
RF Power Generation and PETS Design
CLIC_DDS study
Brief Review of Microwave Dielectric Accelerators
Review of rf structure test results
Developments on Proposed
CEPC injector high field S-band accelerating structure design and R&D
High Efficiency X-band Klystron Design Study
Update of CLIC accelerating structure design
Few Slides from RF Deflector Developments and Applications at SLAC
Review of the European XFEL Linac System
Overview Multi Bunch Beam Dynamics at XFEL
Status of the CLIC Injector studies
CEPC Main Ring Cavity Design with HOM Couplers
CLIC Power Extraction and Transfer structure (PETS)
Parameters Changed in New MEIC Design
Presentation transcript:

Progress in the design of a damped an tapered accelerating structure for CLIC Jean-Yves Raguin CERN AB/RF

The Tapered Damped Structure 2p/3 travelling-wave mode, 150 cells – Av. Acc. Grad. of 150 MV/m Strong damping Each cell coupled to four rectangular identical waveguides Cutoff frequency of the fundamental waveguide mode between the p-mode frequency of the fundamental passband and the lowest frequency of the first dipole band Trapped fundamental mode whereas the E-M energy of the higher modes propagates out of the cells and is absorbed by SiC loads terminating the waveguides Light detuning Linear variation of the irises radius from 2.25 mm at the head of the structure to 1.75 mm at the end, each cell being tuned to have the same fundamental frequencies Dipole frequency spread (5.4 %) which contributes to a further reduction of the transverse wakefields Demonstrated suppression of the transverse wakefields by two orders of magnitude within 0.67 ns (time between two consecutive bunches) on a 15 GHz-scaled version (ASSET experiment)

Accelerating mode: electric field magnitude (Log) SiC load Dipole mode: Poynting vector

Performance limits and peak surface electric fields L= 50 cm Pin/section = 248 MW h = 23.8 %

Temperature increase for the middle cell of the TDS with Pulsed surface heating Temperature increase for the middle cell of the TDS with = 150 MV/m and tp=130ns Due to the configuration of the cell-waveguide coupling iris (3.3 mm wide) the local magnetic field is too high, leading to excessive maximum temperature rise

Design of a new 2p /3 damped and tapered structure Criteria to design new CLIC damped accelerating structure Solutions To prevent electric breakdown, low peak surface electric field To prevent excessive pulse heating, low peak surface magnetic field Good damping of higher order modes and, in particular, of the first and second dipole modes Use of an elliptical profile for irises Appropriate profile of the cells wall Damping of higher order modes by coupling each cell to four T-cross waveguides

Topology of the cell and of the damping waveguides

Field pattern of the first two waveguide modes Fundamental mode Damping for the first dipole band Second mode Damping for the second dipole band Electric field Electric field Perfect Elec. wall Perfect Mag. wall Magnetic field Magnetic field

First cell Iris thickness: 0.55 mm Q=3744 with s = 5.80.107 Mhos/m (Cu) R’/Q= 24.5 kW /m vg/c = 8.1 % fcutoff,TE10-e = 32.1 GHz Epeak / Eacc = 2.55 Hpeak / Eacc = 4.50 mA/V 3.0 mm 5.25 mm

Hsurf/Eacc (mA/V) on the walls of the first cell

Last cell Iris thickness: 1.00 mm Q=3373 with s = 5.80.107 Mhos/m (Cu) R’/Q= 30.0 kW /m vg/c = 2.6 % fcutoff,TE10-e = 32.4 GHz Epeak / Eacc = 1.75 Hpeak / Eacc = 4.38 mA/V 3.0 mm 5.25 mm

For 84 cells (L= 28 cm) Epeak=400 MV/m Pin/section = 130 MW h = 26.1 % DT=154 K DT=120 K

Transverse wakefields analysis First cell Middle cell Last cell Real part of the transverse impedance vs. frequency computed with GdfidL for the first, middle and last cells Transverse wakefields |W t | = 90 V/pC/mm/m at the 2nd bunch Q dip,first= 52 Q dip,middle= 51 Q dip,last= 44 Dfdip /f dip,first = 3.3 %

THERE IS ROOM FOR IMPROVEMENT…

Design of a damped structure - b d = 110 deg. Working at a lower phase advance allows to decrease Epeak / Eacc Decrease iris thickness along the structure Increase the coupling cell- waveguide along the structure for better damping

First cell Iris thickness: 0.80 mm Q=3387 with s = 5.80.107 Mhos/m (Cu) R’/Q= 24.1 kW /m vg/c = 7.7 % fcutoff,TE10-e = 32.3 GHz Epeak / Eacc = 2.21 Hpeak / Eacc = 4.50 mA/V 3.0 mm 5.25 mm

Last cell Iris thickness: 0.55 mm Q=3365 with s = 5.80.107 Mhos/m (Cu) R’/Q= 33.2 kW /m vg/c = 3.8 % fcutoff,TE10-e = 32.3 GHz Epeak / Eacc = 2.00 Hpeak / Eacc = 4.17 mA/V 3.2 mm 5.32 mm

For 83 cells (L= 25.4 cm) Epeak=355 MV/m Pin/section = 128 MW h = 24.8 % DT=122 K DT=122 K

Transverse wakefields analysis First cell Middle cell Last cell Real part of the transverse impedance vs. frequency computed with GdfidL for the first, middle and last cells Transverse wakefields |W t | = 58 V/pC/mm/m at the 2nd bunch Q dip,first= 53 Q dip,middle= 31 Q dip,last= 24 Dfdip /f dip,first = 4.9 %

There is room for improvement (2)…

Design of a damped structure - b d = 110 deg. (2) First cell Iris thickness: 0.80 mm 2.0 mm 3.867 mm Q=3266 with s = 5.51.107 Mhos/m (Cu) R’/Q= 24.0 kW /m vg/c = 7.6 % fcutoff,TE10-e = 32.3 GHz Epeak / Eacc = 2.20 Hpeak / Eacc = 4.51 mA/V 3.0 mm 5.25 mm

Last cell Iris thickness: 0.55 mm Q=3252 with s = 5.51.107 Mhos/m (Cu) R’/Q= 32.5 kW /m vg/c = 3.8 % fcutoff,TE10-e = 32.3 GHz Epeak / Eacc = 1.95 Hpeak / Eacc = 4.10 mA/V 3.2 mm 5.32 mm

For 83 cells (L= 25.4 cm) Epeak=355 MV/m Pin/section = 130 MW h = 24.4 % DT=119 K DT=128 K

For 77 cells (L= 23.5 cm) Epeak=348 MV/m Pin/section = 125 MW h = 23.8 % DT=121 K DT=122 K

Transverse wakefields analysis 83-cell structure First cell Middle cell Last cell Real part of the transverse impedance vs. frequency computed with GdfidL for the first, middle and last cells Transverse wakefields |W t | = 45 V/pC/mm/m at the 2nd bunch Q dip,first= 43 Q dip,middle= 27 Q dip,last= 21 Df dip/f dip,first = 5.4 %

Shall we dare to lower the accelerating gradient?…

Average accelerating gradient of 125 MV/m For 75 cells (L= 22.9 cm) Epeak< 300 MV/m Pin/section = 89 MW h = 27.2 % DT=88 K DT=87 K with the same beam current…

Investigation of new materials Conclusions Design of copper structure with average accelerating gradient of 150 MV/m, peak surface electric field lower that 300 MV/m and maximum temperature rise lower than 100 K seems unrealistic – would lead to smaller iris radius Copper structure with average accelerating gradient of 125 MV/m, peak surface electric field lower that 300 MV/m and maximum temperature rise lower than 100 K seems feasible Investigation of new materials Design of the latest structure with molybdenum irises – calls for a reassessment of the fundamental mode characteristics Material for the cell outer walls which would solve the pulsed surface heating problem? Transverse wakefields suppression Need for tuning the dipole frequencies