CapX 2020 Transmission Expansion Plan Realizing the CAPX2020 Vision South Dakota Energy Infrastructure Authority June 9, 2006 Terry Wolf, Missouri River.

Slides:



Advertisements
Similar presentations
Transportation Funding Alternatives and Outreach
Advertisements

EDISON INTERNATIONAL® SM Water Energy Nexus Charley Wilson Urban Water Institute February 21, 2013.
State Policy Initiatives Financing Wind Power: The Future of Energy May 7-9, 2008 Richard Cogen.
The Midwest ISO from a Transmission Owner Perspective.
©2004 PJM 1 OASIS Phase II Approaching the Problem General Discussion on Strategy and Philosophy Andy Rodriquez - PJM Presented to the NAESB ESS and ITS.
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Overview Seams Coordination Process. 2 Introduction Midwest ISO Non-profit organization that manages the reliable flow of electricity across much of the.
California Transmission Planning Group Presentation to: WECC Transmission Expansion Planning Policy Committee June 16-17, 2010 TANC.
FPSC Ten Year Plan Workshop Nuclear Panel Steven Scroggs Senior Director, Project Development Florida Power & Light Company August 15, 2007.
1 Bradley Nickell Director of Transmission Planning 10-Year Regional Transmission Plan WECC Overview September 2011.
1 Overview. 2 Benefits of RATC Applications Real-time corrective Hour ahead corrective and preventive Day ahead corrective Day ahead market/economic based.
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
© New York Independent System Operator, Inc. All Rights Reserved. New Challenges Facing System Operators Stephen G. Whitley President & Chief.
1 INAC First Nation Education Policy Framework Regional Dialogues Coordinated by AFN and INAC Education Policy Framework - Joint Steering Committee (EPF-JSC)
California Roundup: Summary of DR Activity in California John Goodin Lead, Demand Response 2008 National Town Meeting on Demand Response June 3, 2008.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
Update on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Market Interface Committee March 25, 2014 Jim Price, Senior Advisor, Market Development.
Introduction to Program Budgeting Katherine Barraclough Consultant, World Bank Fiscal Management Reform Workshop, Istanbul, Turkey, June 6-8, 2005.
South Dakota Energy Infrastructure Authority (SDEIA) Inaugural Meeting of State Infrastructure Authorities Rapid City, SD June 13, 2007.
Excelsior Energy’s Mesaba Energy Project Update for the NM-SPG August 16, 2006.
Regional Energy Markets Assistance Program Kazakhstan November 8-11, 2010.
To Create and Sustain a Career Pathway. CTE Works! Summit November 13, 2014.
Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved Chapter The Future of Training and Development.
14 th Annual International Legislators Forum EPA Carbon Regulation June 26, 2014 Eric J. Olsen Vice President and General Counsel Great River Energy.
Wind Energy and Transmission South Dakota Legislative Briefing Pierre, South Dakota January 18, 2006 Beth Soholt Director Wind on the Wires.
Transmission Transporting Electricity by Wire Darcy Neigum Montana-Dakota Utilities Co.
U.S. Energy Information Administration Independent Statistics & Analysis Balancing Authority Related Proposals for EIA Surveys EIA Stakeholder.
Queue Reform at the Midwest ISO NARUC February, 2008.
Expanding and Modernizing the Electrical Grid: Essential Infrastructure for the Midwest’s Clean Energy Future Des Moines Public Library Des Moines, IowaOctober.
EirGrid Customer Conference 2009 October 13, 2009 Dublin, Ireland Session 2: Key Industry Challenges “If you love wind, you have to at least like transmission”
October 30, 2014 Terry Wolf, Manager of Transmission Services.
Buffalo Ridge Incremental Generation Outlet (BRIGO) Transmission Study Presentation to National Wind Coordinating Committee June 22, 2005 W Grivna, PE.
Transmission Transporting Energy by Wire Matthew Stoltz Basin Electric Power Cooperative 1 1.
THE POWER OF POSSIBILITY Electric Transmission System Development in Alberta Neil J. Brausen, P. Eng., Director System Planning APEGGA Calgary Branch Luncheon.
1 Dale Osborn Midwest ISO February 27, Wisconsin Renewable Energy Summit Transmission Expansion Opportunities with Wind Energy.
Highway-Byway Cost Allocation: What it Offers MISO January 2010 Presented to the Organization of MISO States CARP and the Midwest ISO RECB Task Force Meeting.
Potential Transmission Construction Scheduling In Southern Minnesota--- Fall Spring 2006 Xcel Energy has posted Significant Transmission construction.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
CapX 2020 Transmission Initiative Progress Through An Alliance Approach American Public Power Association E & O Technical Conference Atlanta, Georgia April.
NASUCA Meeting Integration of Intermittent Renewable Resources Panel Michael McMullen MISO June 10, 2013.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
0 CapX /1/2015 CapX 2020 Transmission Plan: Ensuring Reliable Electricity.
NSP System. NSP Supply Plans: Generation and Transmission Betsy Engelking Betsy Engelking Director, Resource Planning Director, Resource Planning Xcel.
OSC Meeting April 27, Transmission Cost Allocation Overview.
CWAG ENERGY CONFERENCE BIG SKY, MT Collaborative Efforts to Find Solutions: A Case Study – The Mountain States Transmission Intertie (MSTI) Presented by.
Page 1© 2009 Quanta Technology LLCPage 1 November 2007 BGE January 4, 2008 Strategic Midwest Area Renewable Transmission (SMART) Study October 06, 2009.
Iowa State University Ames, IA July 5, 2011 Wind on the Wires – Wind and Transmission Issues Beth Soholt Wind on the Wires
Integrating More Renewable Energy in the Grid Bert Garvin Vice President, Regulatory Affairs July 21, 2008 NARUC Summer Meeting July 22, 2008.
PUBLIC POWER UTILITIES IN IDAHO Presented to Legislative Generation Sub-Committee by Idaho Energy Authority (IDEA) and Idaho Consumer Owned Utilities Association.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
Updated 1/28/2011.
Transmission Issues & Renewables Perspectives of a Wind Developer.
Investing Our Energy In You Traverse City Light & Power Electric Generation TCL&P Study Session December 1, 2009.
Midwest ISO Discussion February 5, 2009 Greg Levesque Manager – Regional Relations & Policy.
MN Transmission for Renewable Energy Standard NM SPG Update 4/3/07.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
Big Stone II – Delivery Study Phase 6 and Supplemental #2 For Northern MAPP SPG Meeting 4/3/07 Elk River Richard Dahl Missouri River Energy Services.
Bob Cupit Manager, Energy Facility Permitting Minnesota Public Utilities Commission.
1.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
November 16, 2012 Terry Wolf, Manager of Transmission Services.
The Midwest ISO – Platform to Meet Tomorrow’s Challenges Wisconsin Industrial Energy Group August 7, 2008.
Beth Soholt Director Wisconsin Public Utility Institute Wind Energy – Prospects for Growth in Wisconsin Madison, WI February 27, 2008 Wind Power Expansion:
Wind Management at MISO
Northern States Power Companies (NSP-MN & NSP-WI)
Northern States Power Companies (NSP-MN & NSP-WI)
Beth Soholt Director Wind on the Wires
Presentation transcript:

CapX 2020 Transmission Expansion Plan Realizing the CAPX2020 Vision South Dakota Energy Infrastructure Authority June 9, 2006 Terry Wolf, Missouri River Energy Services Manager, Transmission Services

1 CapX Transmission Development Todays topics What does CapX 2020 propose to build? What does CapX 2020 propose to build? Background Project Group 1 Project participation What is the implementation approach? What is the implementation approach? Investment allocation and cost recovery Regulatory and communications Agreement development Key Drivers for Generation Development Key Drivers for Generation Development

2 CapX Transmission Development Key Drivers for Generation Development – Need a Market Coal Generation Coal Generation Transmission Facilities Tariff Taxes Rail Water Wind Generation Wind Generation Transmission Facilities Tariff Taxes Wind Resources Ancillary Service Costs

3 CapX Transmission Development Key Drivers for Gen. Development – Benefit of MISO Mkt Wind in MISO Market Wind in MISO Market Market Access / Market Price Locational Marginal Cost Lower Ancillary Service Costs Transmission Tariff Structure – NO PANCAKE Market Value for Wind in MISO Market Value for Wind in MISO High level analysis – 25-35% greater value for wind in MISO market than outside MISO market CapX doesnt solve the transmission or energy market tariff issues, it does helps with physical infrastructure CapX doesnt solve the transmission or energy market tariff issues, it does helps with physical infrastructure

4 CapX Transmission Development CapX participation Core members Core members Great River Energy Midwest Municipal Transmission Group Minnesota Power Missouri River Energy Services Otter Tail Power Southern Minnesota Municipal Power Agency Xcel Energy Participating utilities Participating utilities Basin Electric Power Cooperative Dairyland Power Cooperative Minnkota Power Cooperative Rochester Public Utilities Wisconsin Public Power Incorporated

5 CapX Transmission Development CapX 2020 – What is it? A vision for transmission infrastructure investments for Minnesota, currently only facilities being proposed are under MISO tariff. Intent is to meet growing loads of participating utilities with high reliability Geography defined by service territories, plus Regional transmission facilities for capacity and reliability that support load serving Generation and transmission to serve load Planning study with a 15-year horizon It will put risk issues in focus for utilities, regulators and other stakeholders

6 CapX Transmission Development Overview – Why is CapX needed? Load growth in Minnesota is continuing New baseload generation is needed Major transmission projects are needed Some plans exist, but lack commitment Regulatory and business challenges must be addressed

7 CapX Transmission Development CapX 2020 Technical Scope Will include new generation scenarios Will address transmission planning requirements for MN Renewable Energy Objective Will help address issues related to the achievement of market efficiency, congestion relief

8 CapX Transmission Development CapX 2020 Assumptions Load Levels MAPP 2009 models with loads adjusted to 2020 levels based on MAPP Load and Capability Report Generation Levels Known planned resource additions Buffalo Ridge Wind, BSP II, etc Resource Planners Identify locations where they are studying Generation interconnection queue MISO, IS Stakeholder input

9 CapX Transmission Development CapX 2020 Study Analysis Computer Modeling Steady state power flow Single contingency (ACCC) Voltage stability

10 CapX Transmission Development System Modeling Significant analysis has confirmed the timing and critical need for CapX transmission assets 15 year plan Multiple planning studies Three scenarios Project group sequence driven by need criticality Estimated capital cost in excess of $3 billion over time Project Group 1

11 CapX Transmission Development CapX 2020 Coordination Studies Upper Great Plains Transmission Coalition Northwest Exploratory Study Northern IA/Southern MN Exploratory Study Red River Valley Transmission Improvement Planning Study (TIPS) Dakota Wind Studies 2004 (WAPA) MISO Baseline Reliability Groups MISO Sub-Regional Planning Groups (SPG) in MAPP area MN State Transmission Plan

12 CapX Transmission Development CapX 2020 Specific Project MISO MTEP State Plan CapX 2020

13 CapX Transmission Development A message in todays briefing … a sense of urgency We have a transmission expansion plan We have a transmission expansion plan Regional 345kV system Design and project sequence driven by time critical needs These assets must be built in order to serve the regions customers reliably Collaborative efforts have achieved legislative and regulatory reform for cost recovery in Minnesota There are high expectations that we will deliver, and significant downside if we do not An execution model has been established There is participant consensus to move ahead

What does CapX 2020 propose to build? Background Project Group 1 Project participation

15 CapX Transmission Development Regional Transmission Constraints TX KS OK AZ NM MO IA NE WY SD ND MN WI MI CO Constrained Paths East / West Interconnection

16 CapX Transmission Development Vision Study Results Need for 345-kV Backbone System by ,000 MW of new generation, including 2,400 MW renewables, to serve 6,300 MW load, forecasted through 2020

17 CapX Transmission Development Continuing work refines the plan, but the first project group is ready for implementation

18 CapX Transmission Development Project Group 1 – $1.1 – 1.3 billion (planning estimate) * Project Group 1 – $1.1 – 1.3 billion (planning estimate) * Further revision of Groups II and III expected as detailed engineering proceeds Project GroupExpected In-Service Group I White, SD to SE Twin Cities (BSP II) / 345 kV SE Twin Cities to Rochester to LaCrosse / 345kV Fargo to NW Twin Cities / 345kV Bemidji to north central MN / 230 kV Group II – Around the Twin Cities * Benton County to Chisago / 345kV Benton County to Granite Falls / 345kV Benton County to St. Boni / 345kV Chisago to Prairie Island / 345kV 2014 to 2020 Group III – Remote Generation Outlet * Antelope Valley to Maple River / 345kV Arrowhead to Chisago / 345kV Columbia to North LaCrosse / 345kV Forbes to Arrowhead / 345kV 2014 to 2020

19 CapX Transmission Development Project Group 1 White, SD to SE Twin Cities This project, BSP II & 115 kV projects together provide outlet for 1000 incremental MW of wind and south metro reliability Scope – 180 miles (est), 345 kV Expected In-Service 2012 SE Twin Cities to Rochester to LaCrosse Reliability for south metro, Rochester, LaCrosse Scope – 140 miles (est), 345 kV Expected In-Service 2011

20 CapX Transmission Development Project Group 1 Bemidji to North Central MN Grand Forks and surrounding region reliability Scope – 70 miles (est), 230 kV Expected In-Service – 2011 Fargo to St Cloud area Fargo, Central MN regional reliability and some outlet for ND generation Scope – 170 miles (est), 345 kV Expected In-Service – 2012

21 CapX Transmission Development Minnesota Governments Response to CapX 2005: Significant legislation Improved investment recovery Streamlined license process by moving siting to the PUC Enabled the TransCo business model February 2006, DOC meeting: Were growing impatient – Why arent you moving ahead to build? [Deputy Commissioner Garvey, MN DOC] June 2, 2006, Minneapolis Star and Tribune: "Am I impatient that we don't have more transmission? Yes." [Deputy Commissioner Garvey, MN DOC]

What is the implementation approach? Investment allocation and cost recovery Regulatory and communications Agreement development Virtual organization

23 CapX Transmission Development CapX has an approach to two key financial questions 1. Investment Allocation: How much does each organization invest? 2. Cost Recovery: How much cost is recovered from each organizations customers? MISO has developed a regional approach (RECB) for recovering transmission costs … key elements approved by FERC (02/2006) CapX seeks alignment between costs recovered, and the allocated opportunity to each participant to invest in the assets CapX members believe MISOs proposal is an acceptable model to allocate the investment opportunity among members/participants Non-MISO, CapX members recover costs on a basis defined by project agreements, not the RECB tariff RECB compatible with MN Tracker for IOU cost recovery

24 CapX Transmission Development Group 1 Project Investment … Will the $$ be there? Key unknown – Will CapX utilities provide the capital to build? Approach in ranked order 1.Investment Allocation – project participants have 1 st right to invest 2.Shortfall Opportunity – if project participants choose not to fully fund, the other CapX members have the next opportunity 3.Access capital markets – if capital is unsubscribed, we will be forced to access the capital markets, including the possible formation of a TransCo, or special project entity

25 CapX Transmission Development Building Support for Group 1 Projects Political, regulatory and communication strategy must match the scale and difficulty of the undertaking Pre-regulatory filing activities Develop intelligence through opinion leader surveys, political consultants Develop target audiences, messages, communication materials Make intial contact with legislators, local units of government, important stakeholders, media Post-regulatory filing activities Public information meetings, work with local government to co-sponsor introductory meetings Pro-active media contacts Begin route development process in parallel with CON proceeding, involve the public up front

26 CapX Transmission Development Regulatory Plan Q2 2006Q3 2006Q4 2006Q1 2007Q2 2007Q3 2007Q Regulatory Filings – Project Group 1 File Notice Plans Implement NPs Prepare Group 1 CON File Group 1 CON Hearings Resolution / CON Issued Route Development (separate but coordinated efforts)

27 CapX Transmission Development Resource commitments require agreements Project Agreement for each project Defines investment commitment Defines investment recovery for non-MISO members Defines project development roles Details which components each member owns Specific operations and maintenance arrangements Establishes interconnection agreements CapX governance and operations cost sharing agreement Defines the CapX virtual organization and its activities Defines governance Commits members to sharing the operating costs

28 CapX Transmission Development Regional Grid Growth Required MN is an net energy importer New plants to address the MN generation capacity shortfall require generation outlet Push for renewable power … not enough lines where the best wind blows SD is a net energy exporter now and will likely be into future As of June 2, 2006 – 1860 MW of generation interconnect in MISO and IS queues

29 CapX Transmission Development Realizing the CapX Vision … with a sense of urgency We have a transmission expansion plan We have a transmission expansion plan Regional 345kV system Design and project sequence driven by time critical needs These assets must be built in order to serve the regions customers reliably There are high expectations that we will deliver, and significant downside if we do not There is participant consensus to move ahead Municipals, Cooperatives, and IOUs