Update on Status of Tier-1 GSDC, KISTI Sang-Un Ahn, for the GSDC Tier-1 Team

Slides:



Advertisements
Similar presentations
Symantec 2010 Windows 7 Migration EMEA Results. Methodology Applied Research performed survey 1,360 enterprises worldwide SMBs and enterprises Cross-industry.
Advertisements

Números.
Symantec 2010 Windows 7 Migration Global Results.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
EuroCondens SGB E.
Worksheets.
The 5S numbers game..
Duration CONSTRUCTION Opening Date EQUIP INSTALL. & TEST Incheon International Airport Control Tower Outcome Progress DESIGN & AWARD : AOR 36 MONTHS.
The basics for simulations
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Progressive Aerobic Cardiovascular Endurance Run
Evelyn CP School Foundation Stage Results (Specific Learning Goals – Reading, Writing and Number) 2013 Reading (Expected) 77% Writing (Expected) 43% Number.
Bowls – A Sport for Life 69 Metropolitan Bowling Clubs read Jack Hi 140 Country Bowling Clubs read Jack Hi Hundreds of Community Members across the State.
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
Foundation Stage Results CLL (6 or above) 79% 73.5%79.4%86.5% M (6 or above) 91%99%97%99% PSE (6 or above) 96%84%100%91.2%97.3% CLL.
Static Equilibrium; Elasticity and Fracture
Resistência dos Materiais, 5ª ed.
Grid operations in 2014 ALICE Offline week 20 March 2015 Latchezar Betev.
Status GridKa & ALICE T2 in Germany Kilian Schwarz GSI Darmstadt.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Line Efficiency     Percentage Month Today’s Date
T1 at LBL/NERSC/OAK RIDGE General principles. RAW data flow T0 disk buffer DAQ & HLT CERN Tape AliEn FC Raw data Condition & Calibration & data DB disk.
Status Report on Tier-1 in Korea Gungwon Kang, Sang-Un Ahn and Hangjin Jang (KISTI GSDC) April 28, 2014 at 15th CERN-Korea Committee, Geneva Korea Institute.
Global Science experiment Data hub Center Oct. 13, 2014 Seo-Young Noh Status Report on Tier 1 in Korea.
11 ALICE Computing Activities in Korea Beob Kyun Kim e-Science Division, KISTI
Computing Infrastructure Status. LHCb Computing Status LHCb LHCC mini-review, February The LHCb Computing Model: a reminder m Simulation is using.
LCG Service Challenge Phase 4: Piano di attività e impatto sulla infrastruttura di rete 1 Service Challenge Phase 4: Piano di attività e impatto sulla.
Status Report of WLCG Tier-1 candidate for KISTI-GSDC Sang-Un Ahn, for the GSDC Tier-1 Team GSDC Tier-1 Team 12 th CERN-Korea.
KISTI-GSDC SITE REPORT Sang-Un Ahn, Jin Kim On the behalf of KISTI GSDC 24 March 2015 HEPiX Spring 2015 Workshop Oxford University, Oxford, UK.
Status Report of WLCG Tier-1 candidate for KISTI-GSDC Sang-Un Ahn, for the GSDC Tier-1 Team GSDC Tier-1 Team ATHIC2012, Busan,
Procedure to follow for proposed new Tier 1 sites Ian Bird CERN, 27 th March 2012.
Procedure for proposed new Tier 1 sites Ian Bird WLCG Overview Board CERN, 9 th March 2012.
Site Report: Prague Jiří Chudoba Institute of Physics, Prague WLCG GridKa+T2s Workshop.
STATUS OF KISTI TIER1 Sang-Un Ahn On behalf of the GSDC Tier1 Team WLCG Management Board 18 November 2014.
JINR WLCG Tier 1 for CMS CICC comprises 2582 Core Disk storage capacity 1800 TB Availability and Reliability = 99% 49% 44% JINR (Dubna)End of.
Development of a Tier-1 computing cluster at National Research Centre 'Kurchatov Institute' Igor Tkachenko on behalf of the NRC-KI Tier-1 team National.
Status of GSDC, KISTI Sang-Un Ahn, for the GSDC Tier-1 Team
Global Science experimental Data hub Center April 25, 2016 Seo-Young Noh Status Report on KISTI’s Computing Activities.
Jan 2016 Solar Lunar Data.
Ian Bird WLCG Workshop San Francisco, 8th October 2016
LCG Service Challenge: Planning and Milestones
October 28, 2013 at 14th CERN-Korea Committee, Geneva
Update on Plan for KISTI-GSDC
KISTI-GSDC Tier-1 SITE REPORT
ITI Portfolio Plan Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Current Date Visibility of ITI Projects ITI Projects.
Project Status Report Computing Resource Review Board Ian Bird
Average Monthly Temperature and Rainfall
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE

Step 3 Step 2 Step 1 Put your text here Put your text here
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Presentation transcript:

Update on Status of Tier-1 GSDC, KISTI Sang-Un Ahn, for the GSDC Tier-1 Team

Resource WLCG MB cores (63 WNs) with 3GB memory/core PB Disks old SE(100TB) will be removed; new storage will be delivered Migration to ALICE::KISTI_GSDC::SE2 is on-going Tape installation complete 8 tape drive (250 MB/s) with 260 media (4 TB per medium) 2 GB/s bandwidth, 1 PB capacity 200 TB xrootd pool disk and 275 TB GPFS pool disk for cache 2Gbps link upgrade will be made in coming April

Operation WLCG MB3 Shows stable status since few months after EMI-2 migration PBS more stable than before AvailabilityReliability Jan % Feb %96.42% Mar %100.00% Apr % May % Jun %84.71% Jul % Aug % Sep %93.85% Oct % Nov %94.94% Dec %97.78% Jan % Feb %97.29% Average 90.00%92.90% EMI-2 Migration Internal Network Maintenance Backbone Network Maintenance Job Exec Failure Due to Missing Libs

2013 p-Pb RAW replication WLCG MB4 p-Pb data transfer started on 7 th March Passed periodic functional test by ALICE on xrootd for tape Policy tuning for xrootd and GPFS during test phase Total data size: TB (740k files are in queue) Transfer speed (~20 MB/s in average) lower than expected (x5) with 1Gbps link Further investigation on internal network as well as backbone together with network expert at KISTI

Milestones WLCG MB/ Urgent issue Resolving network issue to achieve 1Gbps link as well as to have full performance when we have higher network infrastructure Done 1,300 jobs (>85% of job capacity) have been running on average since the last two months Since the end of last year, functional tests on SE (disk) by ops probe and xrootd status shows almost 100% availability To be done 24-hours-monitoring will be provided by a private service company: contract will be made within the first half year There will be a committee on the budget for 3Gbps network in August 2013 (targeting 3Gbps upgrade in April 2014) Objective Target date OriginalRevised Nominate KISTI/GSDC representatives in the WLCG Management Board and the GDBJun Establishment of a 1Gbps connectivity to CERNApr Installation of tape systemNov. 2012Dec High speed transfer of data from CERN to KISTI at the speed required to receive and archive 10% of the ALICE AA raw data foreseen for 2012 over a continuous period of 2 weeks Dec. 2012Jan Provide a precise plan for 3Gbps (or higher) connectivity to CERNJan. 2013May 2013 Present a plan for providing on-call services/support according to the T1 specifications as laid out in the WLCG MoUMay % of the job capacity running for at least 2 monthsJan. 2013Feb % Storage Element (DPM and/or XROOTD) availability (functional tests) for at least 2 monthsJan. 2013Jul Running of the reliability tests (both OPS and ALICE-specific) and publishing those to the new SAM infrastructureJan Integration with the APEL accounting system and publishing accounting dataJan % of the WLCG T1 service targets for at least 2 monthsFeb. 2013Sep Integration in the WLCG OPN (with 2Gbps)Jan. 2013Jul Functional tests of the OPN (with 2Gbps)Feb. 2013Aug Done Almost done To be done Urgent