Quality Assurance/Quality Control Plan Evaluation February 16, 2005.

Slides:



Advertisements
Similar presentations
Basic Principles of GMP
Advertisements

2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Project Quality Plans Gillian Sandilands Director of Quality
INTERNAL CONTROLS.
1 AUDIT AND AUDIT RESOLUTION Peg Rosenberry, Director of Grants Management Claire Moreno, Audit Liaison, Office of Grants Management 9/18/2009 AMERICORPS.
2 Session Objectives Increase participant understanding of effective financial monitoring based upon risk assessments of sub-grantees Increase participant.
RECORD KEEPING Cooperative Development of Operational
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
HIPAA Security Presentation to The American Hospital Association Dianne Faup Office of HIPAA Standards November 5, 2003.
ActionDescription 1Decisions about planning and managing the coast are governed by general legal instruments. 2Sectoral stakeholders meet on an ad hoc.
The Implementation Structure DG AGRI, October 2005
The Managing Authority –Keystone of the Control System
European Union Cohesion Policy
Module N° 7 – Introduction to SMS
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Some slides in this presentation were excerpted from US Eds February 2009 PowerPoint presentation titled: Help! Im a New Title I Director. What Do I Need.
1 Solicitations/Advertisements Solicitations/Advertisements
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Modern Systems Analyst and as a Project Manager
Making the System Operational
Project Appraisal Module 5 Session 6.
Site Safety Plans PFN ME 35B.
EMS Checklist (ISO model)
1 Dr. Ashraf El-Farghly SECC. 2 Level 3 focus on the organization - Best practices are gathered across the organization. - Processes are tailored depending.
Fundamentals of Controlling
Integrated Approach to Area Master Planning in Jubail Industrial City
Effective Contract Monitoring System
Contract CloseOut.
Effective Contract Management Planning
Quality Manual for Interoperability Testing
ABC Technology Project
Behind the Fence and Contract Change Stakeholder Update September 18, 2012.
Session 2: Introduction to the Quality Criteria. Session Overview Your facilitator, ___________________. [Add details of facilitators background, including.
AUDIT IN PUBLIC ADMINISTRATION Assoc. Prof. Dr. Recai AKYEL President of the TCA 04 JUNE 2013 TIRANA/ALBANIA.
Checking & Corrective Action
ODOT’s Public Involvement Process PI and the Project Development Process Minimum PI Requirements.
Environmental Management Systems Refresher
Digital Futures International Forum - Tuesday 18th September 1 Digital Futures International Forum The Digitisation Standard: Back & Forth Stephen Clarke.
Quality Manual for Interoperability Testing Morten Bruun-Rasmussen Presented by Milan Zoric, ETSI.
Air Transport Association of Canada A presentation by John McKenna ATAC President and CEO.
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
IAEA Training in Emergency Preparedness and Response Development of Simulation Exercise Work Session (Drill) Module WS-012.
Addition 1’s to 20.
25 seconds left…...
Monitoring and Controlling the Project
Week 1.
Internal Control and Control Risk
Quality Auditing Dr Alan G Rowley
Care and support planning Care Act Outline of content  Introduction Introduction  Production of the plan Production of the plan  Planning for.
We will resume in: 25 Minutes.
Ensure Vendor/Engineer of Choice Product Quality
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
Effective Project Management: Traditional, Agile, Extreme
Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Chapter 12 Integration Management Practising a common, coordinated.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
Soft Tech Development Inc. 1 Software Project Tracking A CMM Level 2 Key Process Area Soft Tech Development Inc.
Effective Project Management: Traditional, Agile, Extreme Presented by (facilitator name) Managing Complexity in the Face of Uncertainty Ch08: How to Close.
WSDOT Design Build Contracting – an innovative partnership Society of American Military Engineers September 16, 2014 Phil Fordyce, P.E. WSDOT.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
EIA approval process, Management plan and Monitoring
Presentation transcript:

Quality Assurance/Quality Control Plan Evaluation February 16, 2005

A time of change A/E Oversight Guidelines. This defining of roles and responsibilities paints a clearer picture of the responsibilities and relationships within CFL and consultants. With these guidelines in place it is now time to review the other components of the processes that contribute to the delivery of projects.

Why Do You Plan for Quality? If you dont know where youre going, any road will take you there Louis Carroll

Responsibility for Quality Recognition of A/E industry capabilities Acceptance that quality is the A/Es responsibility Both parties CFLHDs roles is QA

Follow Through on Quality The best written quality plan is no better than the worst, if it is not followed through. Take the time to provide the appropriate level of quality control. Reduced levels of QC may be justified, but they must be communicated and agreed to.

Reasons for Evaluation CFLHD accepted the existing QA/QC plans on the merits of each firm. Now that the existing QA/QC plans have been in practice for a while, CFLHD will be evaluating them to develop a basis for providing QA/QC program improvement recommendations; modification of scopes of work to address deficiencies; and to identify weakness areas for monitoring.

How Evaluation was Developed Key elements of a comprehensive highway QA/QC plan were identified The evaluation criteria was selected by researching quality practices of State DOTs and consultants.

Goals of Evaluation Provide CFLHD with a clear understanding of the QA/QC processes and procedures that are in place to control the quality of the work. Identify improvement opportunities. And;

Goals of Evaluation Verify that the mechanisms that control quality are in place so the product meets the expectations of the team. Client Agencies; CFLHD; and A/E

Evaluation Criteria The current organizational QA/QC plans will be evaluated, using 25 evaluation criteria, for the inclusion of the elements necessary to promote the thorough review and checking of all documents. Implementation of QA/QC is not intended to lead to unnecessarily complex and expensive systems but only to formalize and record the good management practices that have usually been practiced in the past.

SUMMARY OF EVALUATION CRITERIA RESULTS WEAKNESS AREAS THE CONSULTANTS QA/QC PLAN: 1 Provides for quality checking and reviewing processes through all phases of product development. 2 Provides for involvement of the project manager in the control of quality. 3 Provides for adequate continuous QC during design and production. 4 Provides for the development of a Project Quality Plan. 5 Provides for the various review types used to control the work. 6 Provides for internal Quality Assurance monitoring. 7 Provides addressing, incorporation and verification of review comments and the use of a comment and response tracking form. 8 Provides for proper subconsultant quality control (including verification of document quality).

SUMMARY OF EVALUATION CRITERIA RESULTS WEAKNESS AREAS 9 Provides for the retention and filing of QA/QC check copies and records. 10 Requires the use of a tracking and responsibility stamp or sign-off. 11 Requires the use of an adequate checking and back-checking system, including how to utilize the checking system. 12 Provides for the QC checking of manual calculations. 13 Provides for the QC checking of computer-generated calculations. 14 Provides for the QC checking of drawings. 15 Provides for the QC checking of specifications. 16 Provides for the QC checking of quantities and cost estimate. 17 Provides for the QC checking of environmental commitments and permitting requirements (including incorporation of commitments and requirements).

SUMMARY OF EVALUATION CRITERIA RESULTS WEAKNESS AREAS 18 Provides for the QC checking of studies and reports. 19 Provides for the QC checking of construction stakeout reports. 20 Provides for a document and report format review. 21 Bridge quality assurance/quality control minimum requirements 22 Provides for the use and submittal of development and review checklists and QC control documents 23 Provides a certification that QC checking has been performed in accordance with QA/QC plan. 24 Provides for sealing and signing of documents (i.e. plans, specifications, reports, studies, etc.). 25 Provides for a final closeout and evaluation.

Involvement of Project Management in QA/QC Project managers have to be active participants in the quality of deliverables. Verification that scope and design are in agreement.

Development of a Project Quality Plan Scope of each review. Allocation of resources and areas of responsibility. Analysis of risks and design decisions. First step in assuring that best practices and sound engineering judgment is used. Quality assurance of subconsultants. Reference quality procedures to be used. Modification of PQP.

Subconsultant Quality Assurance and Quality Control Subconsultants have acceptable QA/QC plans. QA activity to ensure that work is balanced between project constraints, good engineering judgment, and it reflects the appropriate level of risk. Subconsultant are tasked to provide activities for back checking the technical recommendations against the project deliverables to assure that the technical recommendations reflect the evolution of the project.

Quality Assurance Certificate of Compliance A certificate of compliance is to be submitted for ALL deliverables.

Use of Checklists and QA/QC Control Documents Use documents at the appropriate stages of development. Submit the completed checklists with each of the deliverables.

Sealing and Signing of Documents Engineering drawing Cross-Sections Specifications Engineering reports and formal technical memorandums Construction staking reports All other technical recommendations or deliverables

Final Closeout and Evaluation Document problems encountered Areas for improvement Mistakes and lessons learned Outstanding features Corrective action plan

Next Step in the Process An audit report for each of the current QA/QC plans will be developed. The reports will be distributed. Meeting to discuss the results will be scheduled, as necessary, to address findings.

Questions