Aggregate Planning. Dealing with the Problem Complexity through Decomposition Aggregate Planning Master Production Scheduling Materials Requirement Planning.

Slides:



Advertisements
Similar presentations
Strategic Decisions (Part II)
Advertisements

Topics to be Covered 1. Capacity Planning
© 2004 Prentice-Hall, Inc. 8-1 Chapter 8 Aggregate Planning in the Supply Chain Supply Chain Management (3rd Edition)
Aggregate Planning in a Supply Chain
Operations Management Dr. Ron Tibben-Lembke
Aggregate Planning: Example (Adapted from Chase and Aquilano, “Fundamentals of Operations Management”, Irwin Pub., 1991)
Operations Management Aggregate Planning Chapter 13
Aggregate / Production Planning
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operational Planning Operations Management Chapter.
3. Aggregate Planning. Aggregate Planning  Provides the quantity and timing of production for intermediate future Usually 3 to 18 months into future.
PRODUCTION AND OPERATIONS MANAGEMENT
Operations Management Dr. Ron Lembke
Aggregate Planning in a Supply Chain
19–1. 19–2 Chapter Nineteen Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Aggregate Planning.
WEEK 11A – [S&OP] AGGREGATE PLANNING (CHAPTER 13) Planning levels (long, intermediate and short ranges and real time control); Planning & Control Model;
1 By: Prof. Y. Peter Chiu By: Prof. Y. Peter Chiu 9 / 1 / / 1 / 2010 Advanced P.O.M. Chap. 3 Aggregate Planning.
Chapter 8 Aggregate Planning in a Supply Chain
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Aggregate Planning Operations Management - 5 th Edition Chapter.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning Delivered by: Eng.Mosab I. Tabash Eng.Mosab I. Tabash.
Chapter 9 Capacity Planning 2000 by Prentice-Hall, Inc.
Production Planning & Scheduling in Large Corporations.
Production Planning & Scheduling in Large Corporations: Dealing with the Complexities of Product Variety and Structure.
Production Planning & Scheduling in Large Corporations.
1 DSCI 3123 Forecasting & Aggregate Production Planning Strategic Role Of Forecasting Forecasting Methods Capacity Planning Aggregate Production Planning.
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Aggregate Production Planning (APP) Slide Set #8.
1 Slides used in class may be different from slides in student pack Chapter 16 Aggregate Sales and Operations Planning  Operations Planning Overview 
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operations Planning Operations Management - 6 th Edition.
OPIM 204 – Aggregate Planning 1 Aggregate Planning OPIM 3104 Instructor: Jose Cruz.
Operations Management Aggregate Planning
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
Production Planning and Control.  Allocate the company’s ressources  Taking into account :  Strategic and operational objectives (quantity, quality,
Operations Management
Inventory Stock of items held to meet future demand
Aggregate Planning.
AGGREGATE PLANNING Rachmat A. Anggara 9th of April 2010.
1 OMGT 4743/6743 Aggregate Production Planning (APP) Matches market demand to company resources Plans production 6 months to 12 months in advance Expresses.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning PowerPoint presentation to accompany Heizer/Render Principles of.
Contents Introduction Aggregate planning problem
Operations Management Aggregate Planning
Production Planning & Scheduling in Large Corporations
Operations Fall 2015 Bruce Duggan Providence University College.
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 16 Sales and Operations Planning.
© 2007 Pearson Education Sales and Operations Planning.
Aggregate Planning and Master Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
Chapter 12 With Woodruff Modification Sales and Operations Planning – Aggregate Planning Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights.
AGGREGATE PLANNING BY GRAPHICAL APPROACH Particularly for high volume, standardized product system & closed job shop systems, the concepts & methods of.
Sales and Operations Planning
SALES AND OPERATIONS PLANNING AGGREGATE PLANNING PRODUCTION PLANNING OPERATIONS PLANNING How to meet effectively and efficiently forecasted requirements.
Inventory Stock of items held to meet future demand
Production Planning & Scheduling in Large Corporations
Production Planning & Scheduling in Large Corporations
Chapter 14 Aggregate Planning.
Operations Management
Facilities and Aggregate Planning
Chapter 8 Aggregate Planning in the Supply Chain
13 Aggregate Planning.
Chapter 8 Aggregate Planning in the Supply Chain
Beni Asllani University of Tennessee at Chattanooga
Chapter 8 Aggregate Planning in the Supply Chain
Introduction to Production Planning
Dr Sh Salleh bin Sh Ahmad
MRP Introduction EXAMPLES
Production and Operations Management
Aggregate Production Planning (APP)
Inventory Stock of items held to meet future demand
Presentation transcript:

Aggregate Planning

Dealing with the Problem Complexity through Decomposition Aggregate Planning Master Production Scheduling Materials Requirement Planning Aggregate Unit Demand End Item (SKU) Demand Corporate Strategy Capacity and Aggregate Production Plans SKU-level Production Plans Manufacturing and Procurement lead times Component Production lots and due dates Part process plans (Plan. Hor.: 1 year, Time Unit: 1 month) (Plan. Hor.: a few months, Time Unit: 1 week) Shop floor-level Production Control (Plan. Hor.: a day or a shift, Time Unit: real-time)

Aggregate Planning Problem Aggregate Planning Aggregate Unit Demand Aggregate Unit Availability (Current Inventory Position) Aggregate Production Plan Required Production Capacity Aggr. Unit Production Reqs Corporate Strategy Aggregate Production Plan: Aggregate Production levels Aggregate Inventory levels Aggregate Backorder levels Production Capacity Plan: Workforce level(s) Overtime level(s) Subcontracted Quantities

Product Aggregation Schemes Items (or Stock Keeping Units - SKUs): The final products delivered to the (downstream) customers Families: Group of items that share a common manufacturing setup cost; i.e., they have similar production requirements. Aggregate Unit: A fictitious item representing an entire product family. Aggregate Unit Production Requirements: The amount of (labor) time required for the production of one aggregate unit. This is computed by appropriately averaging the (labor) time requirements over the entire set of items represented by the aggregate unit. Aggregate Unit Demand: The cumulative demand for the entire set of items represented by the aggregate unit. Remark: Being the cumulate of a number of independent demand series, the demand for the aggregate unit is a more robust estimate than its constituent components.

Computing the Aggregate Unit Production Requirements Aggregate unit labor time = (.32)(4.2)+(.21)(4.9)+(.17)(5.1)+(.14)(5.2)+ (.10)(5.4)+(.06)(5.8) = hrs

Pure Aggregate Planning Strategies 1. Demand Chasing: Vary the Workforce Level D(t)P(t) = D(t) W(t) PCWCHCFC D(t): Aggregate demand series P(t): Aggregate production levels W(t): Required Workforce levels Costs Involved: PC: Production Costs fixed (setup, overhead) variable (materials, consumables, etc.) WC: Regular labor costs HC: Hiring costs: e.g., advertising, interviewing, training FC: Firing costs: e.g., compensation, social cost

Pure Aggregate Planning Strategies 2. Varying Production Capacity with Constant Workforce: D(t)P(t) O(t) PCWCOCUC U(t) S(t) SC W = constant S(t): Subcontracted quantities O(t): Overtime levels U(t): Undertime levels Costs involved: PC, WC: as before SC: subcontracting costs: e.g., purchasing, transport, quality, etc. OC: overtime costs: incremental cost of producing one unit in overtime (UC: undertime costs: this is hidden in WC)

Pure Aggregate Planning Strategies 3. Accumulating (Seasonal) Inventories: D(t)P(t) I(t)PCWCIC W(t), O(t), U(t), S(t) = constant I(t): Accumulated Inventory levels Costs involved: PC, WC: as before IC: inventory holding costs: e.g., interest lost, storage space, pilferage, obsolescence, etc.

Pure Aggregate Planning Strategies 4. Backlogging: D(t)P(t) B(t) PCWCBC W(t), O(t), U(t), S(t) = constant B(t): Accumulated Backlog levels Costs involved: PC, WC: as before BC: backlog (handling) costs: e.g., expediting costs, penalties, lost sales (eventually), customer dissatisfaction

Typical Aggregate Planning Strategy A mixture of the previously discussed pure options: D PCWCHCFCOCUCSCICBC P W H F O U S I B + Additional constraints arising from the company strategy; e.g., maximal allowed subcontracting maximal allowed workforce variation in two consecutive periods maximal allowed overtime safety stocks etc. Io Wo

Solution Approaches Graphical Approaches: Spreadsheet-based simulation Analytical Approaches: Mathematical (mainly linear programming) Programming formulations

Analytical Approach: A Linear Programming Formulation min TC = t ( PC t *P t +WC t *W t +OC t *O t +HC t *H t +FC t *F t + SC t *S t +IC t *I t +BC t *B t ) s.t. t, P t +I t-1 +S t = (D t -B t )+B t-1 +I t t, W t = W t-1 +H t -F t t, (u_l_r)*P t s_d) w_d) t *W t +O t t, P t, W t, O t, H t, F t, S t, I t, B t 0 ( )Any additional policy constraints Prod. Capacity: Material Balance: Workforce Balance: Var. sign restrictions: Time unit: month / unit_labor_req. /shift_duration (in hours) / (working_days) for month t

Demand (vs. Capacity) Options or Proactive Approaches to Aggregate Planning Influencing demand variation so that it aligns to available production capacity: –advertising –promotional plans –pricing (e.g., airline and hotel weekend discounts, telecommunication companies weekend rates) Counter-seasonal product (and service) mixing: Develop a product mix with antithetic (seasonal) trends that level the cumulative required production capacity. –(e.g., lawn mowers and snow blowers) => The outcome of this type of planning is communicated to the overall aggregate planning procedure as (expected) changes in the demand forecast.