957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”.

Slides:



Advertisements
Similar presentations
350, 350XL 1¼ - 2. Modification Overview Production of the 1¼ began in 2004 and is current. Production of the 1¼ began in 2004 and is current.
Advertisements

RP-500 ½- 1. Modification Overview Production of the RP500 began in 2007 and is current. Production of the RP500 began in 2007 and is current.
RP4A 2½ – 6. Modification Overview Production of the RP4A series began in Production of the RP4A series began in A Lead free version (4ALF)
RP4AN 21/2 – 6. Modification Overview Production of the RP4AN series began in Production of the RP4AN series began in The 4AN indicates an.
RPDA 4A 2½” – 6”. Modification Overview  Production of the RPDA 4A series began in  The RPDA 4A can utilize either a Type I or Type II bypass.
860 (LF), 880 ½”- 2” 860 (LF), 880 ½”- 2”. Modification Overview  Production of the ½ - 2” 860 series began in 1997 and is current.  The 880 is an “N”
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
994 RPDA 21/2”- 6”. Modification Overview  Production of the 994RPDA began in 1999 and is current.  The 994 RPDA currently utilizes the ¾” 009M3 for.
350, 350A 2½”-12”. Modification Overview  Production of the 2½ - 10” sizes began in  Production of the “A” models began in This Indicates.
825, 825Y, 825YD 21/2”-10”. Modification Overview  825- ( ) Cast iron body- Threaded in seats- Internal check parts are epoxy coated iron. Old.
975DA 2½”-10”. Modification Overview  Production of the 975DA began in 1993 and was discontinued in  The 975DA uses a ¾” 975XL for the bypass.
994 2½ ”- 10”. Modification Overview  Production for the 994 began in 1999 and is current.
375AST 21/2”-10”. Modification Overview  The stainless steel (ST) series was introduced in  This version has a stainless steel body. ***(Parts.
375, 375XL ¾”-1”. Modification Overview  Production of the ¾”-1” 375 began in 2004 and is current.  The lead free version 375XL was introduced in 2010.
475, 475V 2½”-3”. Modification Overview  Production of the 2½ - 3” sizes began in  The lead free version (XL) was introduced in 2011.
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”. Modification Overview  Production began in 2002 and is current.  Early versions used a ¾” Flomatic RPZE for.
4D-200, 4D-700 2½”- 10”. Modification Overview  Production began in 2003 and was discontinued in  The 4D-700 (RPDA) uses a Type-II bypass (single.
½”-10”. Modification Overview  Production of the series began in 1989 and is current.
009 (M3) ½”-2” 009 (M3) ½”-2”. Modification Overview- 009  009 ¾-1” ( ) (1” ) ¾-1” ( ) (1” ) 1¼ -2” ( ) 1¼.
RPZ 2½”- 10” RPZ 2½”- 10”. Modification Overview  Production of the RPZ in sizes 2½ - 10” began in 1993 and is current.
5000CIV 21/2”-10” 5000CIV 21/2”-10”. Modification Overview  Production of the 5000CIV (Watts 909RPDA) began in 1998 and is current.  The 5000CIV utilizes.
375, 375XL 1¼” -2”. Modification Overview  Production of the 1¼” -2” 375 began in 2004 and is current.  The lead free version 375XL was introduced in.
RPZ, RPZE ½”-2”. Modification Overview  Production of the model RPZ began in  The lead free version ( RPZE ) was introduced in 2002 and is current.
450 4”-10”. Modification Overview  Production of the 4” - 10” sizes began in  The lead free version (XL) was introduced in 2011.
M300, M300N, M300Z (2½ ”–10”) M300A (2½ ”- 4”). Modification Overview  Production began in 2000 under the Hunter name. In 2002 it was produced as the.
”-10”.
½”-10”.
475, 475V, 475XL 4”-10”.
826YD 21/2”-10”.
009 2½”-3”.
RP4A (LF) ½”-2”.
PVB-4A ½”- 2”.
420, 420XL ¾”-1”.
007 2½”-3”.
RPDA 4AN 21/2” – 6”.
830, 831 4”- 6”.
DCV, DCVE ½”-2”.
¾”-2”.
007DCDA 2½”-3”.
007DCDA 2”.
450 2½”- 3”.
M500, M500N, M500Z 21/2”-10”.
RPZ-II, RPZE-II ½” , ¾” , 1½”.
909 3/4”-2”.
4000B (M3) ½”-2”.
5000SS 21/2”- 6”.
DC-500 ½”- 1”.
850 (LF) ½”- 2”.
C200, C200N, C200Z (2½ ” – 10”) C200A (2½ ”- 6”).
DC4A 21/2” – 6”.
880V 21/2”-10”.
975 2½”-10”.
3000B 2”.
M200, M200N, M200Z (2½”– 10”) M200A (2½”- 4”).
C400, C400N, C400Z 21/2”-10”.
C300, C300N, C300Z (21/2”–10”) C300A (21/2”- 6”).
007 2½”-3”.
375DA 2½”-10”.
919 ¾”-2”.
007DCDA 2½”-3”.
M400, M400N, M400Z 21/2”-10”.
757DCDA, 757N DCDA (21/2”–10”) 757A DCDA (21/2”- 6”)
007DCDA 2”.
3000B 2”.
2000B (M3) ½”-2”.
DC4AN 2½” – 6”.
450DA 4”-10”.
909 RPDA 21/2”-10”.
757, 757N, 757Z (2½ ” – 10”) 757A (2½ ”- 6”).
709 3/4”-2”.
Presentation transcript:

957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”

Modification Overview Production began in 2002 and is current. Early versions used a ¾” Flomatic RPZE for the bypass assembly. Current version uses a ¾” 919 for the bypass assembly.

Check Cover Removal 21/2”-6” Cover slides back and is o-ring sealed. Remove test cock # 3 from the body. Insert a screwdriver through the hole on top of the cover sleeve. Using both hands, rotate the cover ¼ turn clockwise and counter-clockwise to break o-ring seal.

Check Cover Removal 21/2”-6” Slowly slide the cover sleeve to the downstream side of the housing. Once fully pulled back, turn the sleeve 90 degrees.

Check Valve Removal 21/2”-6” Check valve modules are o-ring sealed. Remove the check retainer. Remove check 1 first, then check 2. Using a flat blade screwdriver, gently pry the module out of the body.

Check Cover Removal 8”-10” For the 8-10” sizes, remove both Victaulic couplers. Remove test cock # 3 from the body. Slide the cover downstream.

Check Valve Removal 8”-10” Modules are o-ring sealed. Remove the 3 check retainers. Remove check 1 first, then check 2. Using a flat blade screwdriver, gently pry the module out of the body.

Check Seat Removal The check seat is part of the module. If seat is damaged, the entire module will have to be replaced.

Check Disc Replacement 21/2”-4” The check modules are spring loaded. Insert a screwdriver through the hole in the linkage and let it rest in the arbors on the module. Remove the “E”-clip and pin connecting the linkage. The clapper will open with no tension.

Check Disc Replacement 21/2”-4” Remove the screws on the disc retainer. Once disc is replaced, reassemble in reverse order. Do not remove the spring assembly.

Check Disc Replacement 6”-10” Locate the service hole on the side of the check module. Use a ½”-13 x 5 fully threaded bolt. Thread the bolt until the hole in the linkage is aligned with the notches in the spring arbors. Insert a long phillips screwdriver through the hole and arbors.

Check Disc Replacement 6”-10” Back the bolt out until the spring tension is transferred to the screwdriver. Remove retaining clip and pin from linkage. Spring assembly can be removed from the module. Remove screws from disc retainer.

Check Valve Reassembly Notes Reassemble check valves in reverse order. Apply lubricant to o-rings. Replace check 2 first, then check 1.

Relief Valve Removal Relief valve is threaded onto body and o-ring sealed. Disconnect sensing line hose. RV should be removed by hand.

RV Disassembly Remove the cover plate by removing the 4 allen screws. Remove the diaphragm.

RV Disassembly With the threaded end facing up, push up on the piston until the piston shaft with the attached E-clip is exposed. Remove the E-clip.

RV Disc Replacement The RV disc is molded onto the disc holder and must be replaced as one piece.

RV Diaphragm Replacement Reassemble relief valve in reverse order. Form the diaphragm to fit over the disc holder. Reinstall the diaphragm into the body.

RV Reassembly Notes Lubricate the RV body o-ring. Reattach the complete RV to the assembly body.