TSC Modifications Panel Meeting

Slides:



Advertisements
Similar presentations
Background T&SC V9.0: The Market Operator shall not grant the status of Under Test for the purposes of this Code to Autonomous Generator Units, Pumped.
Advertisements

The Single Electricity Market in Ireland
Ramping and CMSC (Congestion Management Settlement Credit) payments.
Copyright 2013 by Baringa Partners LLP. All rights reserved. Confidential and proprietary. PPA Route to Market Imbalance Risk Analysis An Update Oliver.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
MCWG Update to WMS Loretta Martin LCRA, Chair Josephine Wan AE, Vice Chair 03/05/
Short Term Testing Mod 65_08 Modification Committee 25 th November 2010.
1 Draft NYISO 2003 Budget Report BS&P Report to Management Committee October 16, 2002.
20 September 2015 GAZ DE FRANCE ESS Introduction of Gas Reserve Arrangements Mark Bailey Gaz de France ESS.
Recommendation for Board approval of updated nodal fee filing Steve Byone Overview –Historical summary –Highlights from approved interim Nodal Surcharge.
BGS-CIEP Rate - Energy Components (Continued)
ERS Procurement Methodology 09/04/2013 ERS Workshop Presented By: ERCOT Staff.
Long Term Entry Capacity & User Commitment Review Group th September 2008.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Impact of Increasing Meter Errors on the SEM Modifications Committee Meeting 65 3 rd December 2015.
1 IG Meeting Milan, 18 th July 2008 Cost of Firmness of Capacity.
Fundamental review of entry charging principles UNC Transmission Workstream - 6 th August 2009.
ERCOT Market Credit Working Group Presentation to the Finance and Audit Committee Payment Short Pay/Default and Uplift for Congestion Revenue rights (CRRs)
WSPP Webinar Proposed Service Schedules Operating Reserve Service (D) Intra-Hour Supplemental Power (E) February 4, 2010.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Prepared by California Department of Water Resources May 31, 2001
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
Details of demand management options
2017 Seasonal Adjustment Factors
7 December 2006 Ritchard Hewitt
Storage users in entry/exit regimes suffer from double charges for transmission
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
ERS Procurement Methodology
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
MANAGING BUDGET FUNDS IN THE REPUIBLIC OF KAZAKHSTAN
City of Sisters, OR 2017 Water & Sewer Rate Study
Cash Flow Stephen Daze Dom Herrick Entrepreneur in Residence
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
PRIDe in Gas Model workshop
Recovery of Costs due to Invalid Ex-Ante Contracted Quantities in Imbalance Settlement 12th December 2017.
Incentives 26 September 2018.
Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt Version 2
ARCH 435 PROJECT MANAGEMENT
Correction of Minor Material Drafting Errors
Contract Refusal Contract Refusal is a process associated with participant’s ex-ante trading behaviour; It relates to how the Traded Not Delivered element.
Danishtah Parker 0621 Workgroup 26 April 2018
TSC Modifications Panel Meeting
MOD_19_18 Part B Housekeeping 1 21st June 2018.
Review of the requirements regarding Unsecured Bad Debt within I-SEM
PARCA Security and Termination Amounts
Mod_25_18 Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
DSC Default Process January 2019
Mod_38_18 Limitation of Capacity Market Difference Payments to Loss Adjusted Metered Quantity. 12th December 2018.
CMC_04_19 Finalisation of Exchange Rate in Auction Information Pack
Mike Mumper & Brian Kick Good afternoon
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – User Pays Options Review Group August th November.
Credit Cover Signage and Subscript Correction
Determining Marginal Energy Action Prices Modification Proposal
Summary Issue Modification Aim Effect of the mod Impacts
Use of Technical Offer Data in Instruction Profiling / QBOA Version 2
Use of Technical Offer Data in Instruction Profiling / QBOA Version 2
Review Group 221: Review of Questions from Session 2
Determining Marginal Energy Action Prices Modification Proposal
Recovery of Costs due to Invalid Ex-Ante Contracted Quantities in Imbalance Settlement 25th January 2018.
Review Group Action November 2008.
Correction to No Load Cost - “and” vs “or”
Mod 09_19 - Removal of locational constraints from Imbalance Pricing
Interconnector trading in SEM 7th June 2007
Capacity Market Code Modifications
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Presentation transcript:

TSC Modifications Panel Meeting Contingent Capital TSC Modifications Panel Meeting Jan 2017 Confidential For discussion only

Key Objectives Review of questions from December meeting Proposed changes Vote Option 1 Option 2 Option 3 Confidential For discussion only

Why is contingent capital needed? Accumulated Charges-Payment Contingent Capital Market Payments Market Charges

Purpose of modification Recognise that contingent capital will be required for smooth running of the market Place obligation on Market Operator to seek credit facility Clarify sources of funding for such an arrangement (level of funding to be determined as part of normal revenue control process) RA approval required to change amount of contingent capital Publication of any changes to all participants Funds Available Surplus of Charges over Payments for the billing period Surplus of Charges over Payments as accrued from previous billing periods Contingent Capital remaining Define the Charges and Payments to which the Contingent Capital can apply Remedial measures if Contingent Capital is likely to be exhausted Right to suspend and accrue payments if Contingent Capital is exhausted Confidential For discussion only

Socialisation fund? F.21.1.3 The Market Operator shall determine the Socialisation Balance (CBSOCd) for a Settlement Day, d, through applying any adjustments necessary to the Initial Socialisation Balance calculated in accordance with paragraph F.21.1.1, including: (a) adding the amount of any Termination Charge recovered under section J.7.1 of the Capacity Market Code (and, in the event of a failure by a Participant to pay a Termination Charge invoiced under that section, any amount recovered by the System Operators as a result of a call or demand on the Participant’s Performance Security under that section) and paid to the Market Operator; and (b) to the extent the Market Operator considers appropriate, adding any accumulated over-recovery by the Market Operator in respect of another charge under this Code that is calculated by reference to a parameter or price set by the Regulatory Authorities on the basis of expected costs.

Factors to be considered Extent to which contingent capital is already drawn e.g. if DBC running above or below budget Ability to fill the hole in the hedge Scarcity event – price exposure is 2,500€/MWh 500€/MWhr strike price 3,000 €/MWhr scarcity price 400 MW unit un-available for 8 hours = 8m€

Running Order – prescriptive? Imperfections charge Contingent Capital Requirement Reduce payments Market rules, bidding code of practice Suspend and accrue only after Contingent Capital is exhausted

Transparency DBC is the main driver of contingent capital draw down TSO’s monitor DBC continuously Standing agenda item for fortnightly meeting with RA’s Can include trend alert Decision required to send out Market Message High frequency public reports Illustrate impact of individual participant's bidding behaviour Short term fluctuations may be misleading Early warning to the RA’s may trigger notification to industry

Forecasting Accuracy Difficult to forecast – wide error bars Tariff setting on the worst case scenario? Tariff’s are subject to regulatory approval Contingent capital ~ insurance Insurance has a cap Tariff Contingent Capital TSC Tariff Contingent Capital TSC

End

Change in key assumptions – SEM v I-SEM Category Change in I-SEM Impact Capacity Capacity auction process in I-SEM compared to a “pot” set at the beginning of a year in SEM Capacity is self funded (pass through) on a monthly basis in SEM compared to a Tariff mechanism in I-SEM Monthly payments ≠ receipts in I-SEM Seasonal impact in Year 1 as Go Live is May-18 which is coming into the trough summer months. Payments made on a straight line basis but receipts recovered on a demand profile basis. Likely to result in a cumulative deficit build up during the summer months which should unwind during the winter months. This is a Year 1 funding risk only as the tariff year normally starts in Oct which is coming into peak winter months. Constraints & Residual Error (REVLF) Change in market rules Not required to bid on SRMC basis Participant will be paid the higher of bid price or market price for Constraints REVLF moving from pass through to tariff mechanism in I-SEM Market Interconnector Ramp rate ≠ Physical Expected increase in volatility in imbalance price due to change in bidding rules Market risk Intrinsic risk associated with the introduction of a new market Extremely difficult to quantify. Risks include: Market behaviour Design risk Remedy period Confidential For discussion only

Estimate of how much is needed