Сase #1 Well Pump Review Almaty 2018.

Slides:



Advertisements
Similar presentations
Total Well Management Lynn Rowlan Beam Pumping Workshop Houston, Texas
Advertisements

Natural Convection in Enclosed Spaces
IPR Calculation Methods
FORM 1027 – BOTTOM HOLE PRESSURE TEST. This presentation will assist you in the completion of the Form The bottom hole pressure test. Date of Last.
WELL PERFORMANCE ANALYSIS
Lesson 14 Jet Bit Nozzle Size Selection
Fluid Mechanics 07.
Presented by: Alex Hageman ( Accelerated Production Services, Inc.) May 15 th, 2013 Multiple Stage Hydraulic Jet Pump Presented to ALRDC.
Centrifugal Pump Basics Terms commonly used in the pumping industry.
Butch G. Bataller Lecture on ChE 192
Lesson 26 CENTRIFUGAL PUMPS
Experts in Chem-Feed and Water Treatment General Hydraulics Fluid Mechanics.
Core Ag Engineering Principles – Session 1
Week 1 Unit Conversions Mass and Volume Flow Ideal Gas Newtonian Fluids, Reynolds No. Week 2 Pressure Loss in Pipe Flow Pressure Loss Examples Flow Measurement.
OIL TRANSPORTATION IN PIPELINE Group leader : Meshary Al-Sebhan.
Copyright: Prof S.A. Kinnas
Assignment No. 1 [Grup 8] Figure below shows a portion of a hydraulic circuit. The pressure point B must be 200 psig when the volume flow rate is 60 gal/min.
Specifying and Sizing Control Valves A design equation used for sizing control valves relates valve lift to the actual flow rate q by means of the valve.
Week 1 Unit Conversions Conservation of Mass Ideal Gas Newtonian Fluids, Reynolds No. Pressure Loss in Pipe Flow Week 2 Pressure Loss Examples Flow Measurement.
By: Gatut Widianoko Weatherford Artificial Lift Systems
College of Engineering & Petroleum Depatment of Chemical Engineering
Pump Selection Centrifugal - low P (
Example 1 Velocity measurement by a Pitot tube
Pumps and Lift Stations. Background Fluid Moving Equipment Fluids are moved through flow systems using pumps, fans, blowers, and compressors. Such devices.
Things to grab for this session (in priority order)  Pencil  Henderson, Perry, and Young text (Principles of Process Engineering)  Calculator  Eraser.
© ChevronTexaco 2001 Use of Transient Simulators to Assess Gas Lift Viability for Offshore Angola 2002 North American Gas Lift Workshop SHAUNA NOONAN /
1 Update on ELift™ SAGD artificial lift Presentation to Artificial Lift & Low-Pressure SAGD Subcommittees Nov 2004 Ken Kisman Ph.D., P.Eng.
Gas Condensate Reservoirs: Sampling, Characterization and Optimization SPE Distinguished Lecture Series F. Brent Thomas.
Formative Assessment. 1a. Convert Torr absolute to gauge pressure psi. (11.2 psi gauge ) 1.00 atm = 1.013x10 5 Pa = kPa = 760. Torr = 14.7.
Gas Well De-Liquification Workshop Denver, Colorado February 27 - March 1, 2006 Problem Identification, Candidate Selection, & Selection of Artificial.
Week 1 Unit Conversions Conservation of Mass Ideal Gas Newtonian Fluids, Reynolds No. Pressure Loss in Pipe Flow Week 2 Pressure Loss Examples Flow Measurement.
ARTIFICIAL LIFT METHODS
ERT 322 SAFETY & LOSS PREVENTION. (A) Spring operated reliefs in liquid and gas service. (B)Rupture disc reliefs in liquid and gas service. (C)Vents for.
ERT 312 SAFETY & LOSS PREVENTION IN BIOPROCESS RELIEF SIZING Prepared by: Pn. Hairul Nazirah Abdul Halim.
By Jayant Sadare Gas-Lift Optimization and Diagnosis by using
Application of the Continuity Equation Dr. Eyad Abushandi.
SUGGESTED MINIMUM KNOWLEDGE OF FLUID MECHANICS AND FOR FE EXAM
Oil and Gas Technology Program Oil and Gas Technology Program PTRT 2432 Artificial Lift Green Book Chapter 1 Planning an Artificial Lift Program.
Chapter 1 PTRT 2432 – 01 Vern Wilson ARTIFICIAL LIFT.
6.5 Recommended Velocity Of Flow In Pipe And Tubing.
Power – Energy Relationships
System One Pumps S1-200 Centrifugal Hydraulics
Week 1 Unit Conversions Conservation of Mass Ideal Gas
Continental AG Manufacturing Facility
Schlumberger Artificial Lift Engineering
RESERVOIR ENGINEERING
HYDRAULICS & PNEUMATICS
Components Pumps.
Fluid Statics/Dynamics
EXERCISES Two water reservoirs are connected by a pipe 610m of 0.3m diameter, f’=0.038 and the flow produced by the difference in water surface elevations.
Hydraulic lift with the aid of energy storage (accumulators)
A PROPOSAL TO TRANSPORT FLUIDS FROM WELLHEAD TO FLOW STATION USING A GAS DISPLACEMENT PUMP. Juan Carlos Brown, 6th July 2017.
RECIPROCATING COMPRESSORS BY DEEPA M S VARUNA TANDON
SUBSEA GAS BOOSTING Jon Steinar Gudmundsson October 8, 2008
QC checks on composition
Casing Design Workshop
Fantail Well Services, LLC
Pumps and Lift Stations
Copyright: Prof S.A. Kinnas
Gas Condensate Rate Equation ”Pseudopressure Integral”
Gas Condensate Rate Equation ”Pseudopressure Integral”
Pressure & Depth.
CHAIR - JIM BENNETT EXXONMOBIL
Heat-transfer Equipment
Line Sizing By Shardul Kulkarni.
Pseudopressure Function
Chapter 6 Cyclones.
QC checks on composition
Fluid samples from gas condensate wells are needed for two main reasons: To provide PVT data for developing a fluid model such as an EOS and/or black-oil.
QC checks on composition
Presentation transcript:

Сase #1 Well Pump Review Almaty 2018

Methodology Calculate bottomhole flowing pressure on existing wells Generate inflow performance relationship Predict flowrate with higher drawdown and reduced bottomhole pressure Evaluate practicality of artificial lift methods for three wells Recommend a lift method

Water Specific Gravity PVT PVT WELL NAME & NUMBER   Well #205 Well #206 Well #201 Solution GOR sm3/sm3 51.1 26 30 Oil Gravity kg/m3 792.2 790.9 790.5 Gas Gravity SG(air) 1.034 0.991 0.925 Water Specific Gravity SG(water) 1.11 Temperature ºC 87.3 83.3 80 Bubble Point Pressure bara 66.8 38.2 44.3 Oil FVF m3/m3 1.224 1.15 1.149 Oil Viscosity Cp 0.42 0.46 0.49

Completion Completion WELL NAME & NUMBER Well #205 Well #206 Well #201   Well #205 Well #206 Well #201 MD pump depth m 1200 900 n/a TVD pump depth 2165 MD Tubing Depth 2148.1 Tubing Inside Diameter Inches 2.441 2.992 Tubing Outside Diameter inches 2.8675 3.5 2.875 Liner Top 1246 Liner Inside Diameter 6.184 Casing Inside Diameter 7" to surface 8.535 Formation Measured Depth 2353 2172.6 Formation Temperature ºC 87.3 83.3 80

Tubing Head Temperature Well #205 Well Test Date 2018 Assumed intake pressure of 664 psi (600m fluid above pump) Pwf = 2146 psig Test Date   2018 Tubing Head Pressure psig 58 Tubing Head Temperature ºC 60 Water Cut % 50 Liquid Rate sm3/d 106.7 RPM m 208 Displacement m3/day/RPM 0.513 GOR sm3/sm3 22.2

Well #205 Very little drawdown Provided no concerns about channeling / coning water, can increase offtake. Suggest target pwf of 70 bar (1015psi) -maintains above bubble point Target rate of 210 m3 /day (1323 blpd) Approximately 70HP motor required Target

Well #205 Lift Requirements 210 m3/day (1323 BPD) Pump at 2000 m (6561 ft) Requires pump differential pressure rating of 1601 m (5252ft) Approximately 70HP motor required Well Head Pressure 100 (psig) Flowing Bottomhole Pressure 1051.17 Water Cut 90 (percent) Pump Intake Pressure 804.41 Pump Intake Rate 13181.3 (RB/day) Pump Discharge Pressure 3181.37 Head Required 1601.32 (m)

Tubing Head Temperature Well #206 Well Test Date 2018 Assumed intake pressure of 1000 psi Pwf = 2679 psig Test Date   2018 Tubing Head Pressure psig 80 Tubing Head Temperature ºC 60  Water Cut % 55 Liquid Rate sm3/d 377.9 RPM m 400 Calculated m3/dayRPM m3/day/RPM 0.945

Well #206 Very little drawdown Provided no concerns about channeling / coning water, can increase offtake. Suggest target pwf of 70 bar (1015psi) -maintains above bubble point Target rate of 2015 m3 /day (12700 blpd) Target

Well #206 Lift Requirements 2015 m3/day (12700 BPD) Pump at 2000 m (6561 ft) Requires pump differential pressure rating of 907 m (2975ft) Approximately 350HP motor required Well Head Pressure 100 (psig) Flowing Bottomhole Pressure 1440.39 Water Cut 50 (percent) Pump Intake Pressure 1235.38 Pump Intake Rate 11450.9 (RB/day) Pump Discharge Pressure 2352.75 Head Required 907.531 (m)

Tubing Head Temperature Well #201 Well Test Date 2018 Calculated Pwf Pwf = 2797.9 psig Test Date   2018 Tubing Head Pressure psig 353 Tubing Head Temperature ºC Water Cut % 16 Liquid Rate sm3/d 276 RPM m n/a Calculated m3/dayRPM m3/day/RPM

Well #201 Very little drawdown Provided no concerns about channelling / coning water, can increase offtake. Suggest target pwf of 70 bar (1015psi) -maintains above bubble point Target rate of 2015 m3 /day (12700 blpd) ESP going to be similar to Well #206 design Target

Lift Requirements Two wells produce 2015 m3/day One well produce 210 m3/day Prefer use same lift method for all three wells

Pump Selection TASK: The rates on all three wells can be significantly increased. Please, based on provided tech data, recommend viable and highest rates options. Lift Method Where Applicable Why not! Rod Pump ? Jet Pump Progressing Cavity Pump Gaslift ESP