Wire almost entirely through beam before BLM triggers dump

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
Goal of the week: Stable beams with trains of 200 & 248 bunches 1 OP summary of week 40 R. Bailey, J. Uythoven & J. Wenninger.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Wednesday September 14th
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Tuesday Nov 16th Fill 1492 into physics around 07.30
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Monday 14th March Second fill with pilot + 3 nominal bunches
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Monday 11/07: Recovery Plenty of accesses.
LHC Operation Week 41 Coordination G.Arduini, M. Lamont
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Tuesday 23/11/10 8:00 Physics fill #1511 dumped
LHC operation in week 39 Coordination: Mike Lamont, Jan Uythoven, Malika Meddahi Thanks to OP crews, HW and SW teams + patient customers Aims for the week.
Wednesday 31 October: Morning
Tuesday Fill 1494 dumped by operations at (~ 0.25 ub-1 in ~6.5 h): LSS6 BPM interlock test 13:00 Fill 1495 dumped by RF dump (cavity quench) 14:00-17:30.
Lost at 12:05 to power converter (RTQX2.R1) problem
LHC Morning Meeting - G. Arduini
Friday 31st August & night
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
LHC Morning Meeting - G. Arduini
Tuesday 20 March 2012.
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Tuesday 9th November 10:02 Fill beams dumped
Not the most productive 24 hours on record
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
Friday Morning 7:30 injection for fill 2908
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Summary Thursday h21: Stable beams fill #1303.
Aims for the week Recover from technical stop and precycle at 10A/s
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Thursday Fill 1364 (24 bunch) dumped at 07h
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Thursday 22 September 2011.
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
LHC Morning Meeting - G. Arduini
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Monday 27th August & night
Thursday Morning/Afternoon
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
Wednesday 6.10 Morning: Quench test at 450 GeV
Saturday 26 November 2011.
HI2011 Commissioning Status
Monday 152 bunch operation summary
Tuesday
Presentation transcript:

Wire almost entirely through beam before BLM triggers dump Thursday 7/10/10 - Morning Finish fill #1397 – 2 x 200 bunches 7:50: Start to move in the different Totem Roman Pots: OK 10:26: All pots in 10:59: Fly the wire; dumps beams by BLMs, no quenches Delivered Lumis nb-1 ALICE            1.52     ATLAS          1376.018 CMS             1090.945 LHCB            1279.718 Wire almost entirely through beam before BLM triggers dump 08/10/2010 LHC status

Thursday 7/10 AM/PM Prepared for injection studies 24 bunches Problem PS cavities: decided to go for access 13:30 Access: - BBQ (reason for access) - ALICE - ATLAS - AC dipole (fixed) - DC BCT - RF - CV in RR17 to check ventilation cooling circuit TI is signaling an alarm on the cooling of the dump resistor in UA83. Piquet sent, but they can’t access. Continue without repair. Needs follow-up? 16:30 End of Access 08/10/2010 LHC status

Test ramp 56 bunches Test ramp for new BBQ front-end electronics Don’t want to go for record beam intensities with ‘new’ system Check that it is at least as good as before the intervention 19:30 Ramp. OK with 56 bunches Tune feedback locked over the complete ramp Before ramp: ‘Expert check’ simulating larger signals (resistors off) = higher beam intensities: all fine With Median Filter 08/10/2010 LHC status

Tune Feedback Ramp 56 Bunches 08/10/2010 LHC status

Injection Studies 24 Bunches 21:00 Ready with LHC for Injection Studies but suffering from SPS MD SPS Coming out of access SPS RF problem 23:00 – 00:300 Pilots in – test 24 bunch injection B1: clean injections and good trajectories (no steering needed) B2: bad losses and trajectories in transfer line (also for 8 bunches injection), however we did not see big losses in the LHC. Trimmed in the first part of the line with 2 correctors Horizontal trajectory improved and losses reduced by a factor of 2-5. Losses from uncaptured beam as usual at the end - BPMS IP6 interlock test OK: beam dumped almost at the reading Globally injection with 24 bunches looks fine. W.Bartmann, C.Bracco 08/10/2010 LHC status

Fill 1400 with 2 x 248 bunches Injection 24 bunches ok again Tune Feedback stayed on through the ramp !! At 1.8 GeV we had strange activity on beam 1, V... 2:36 Stable beams Maximum lumi 8.8e+31 ATLAS high background (BKGD 2 larger than 2000). 08/10/2010 LHC status

Vacuum During Injection and Ramp 08/10/2010 LHC status

Bunch intensities for fill – 1.0e11/bunch 08/10/2010 LHC status

Planning for the coming days Physics 248 bunches Change LHCb polarity some time Possible studies Injection Studies 24 Bunches ? PLL Studies in Ramp, not that urgent anymore Other BI Checks, see next slide V/d Meer Scans next Tuesday 08/10/2010 LHC status

BI Checks Measure the sensitivity of Marek’s new beam presence detection system Check the linearity of the fast BCT’s in the new configuration for nominal bunches Tune the High BW/Low Gain fast BCT calibration for the coming ion run Measure the High BW/Low Gain fast BCT sensitivity limit and linearity for low intensity bunches (ion run) Re-check BPM sensitivity limit Calibrate the abort gap over the whole ramp Check the abort gap acquisition gate timing resolution and stability Commission BGI in preparation to ions Check BSRT/BGI/BWS cross-calibration including corresponding emittance logging Test and compare bunch/bunch profile measurement via BWS and/or BSRT For all this, we would need the 2 rings for a few hours at 450 GeV then a ramp and again a few hours at 3.5 TeV. This would be really difficult to fit in a 4 hour slot. 8 would be perfect but we could try with 6. 08/10/2010 LHC status

Scheduled lift maintenance Some preventive maintenance has been requested on the LHC lifts, and agreed according to the following planning: Tuesday 5 October:             PM15 from 8h to 12h00; PM25 from 13h30 to 17h30 Wednesday 6 October:       PX24 from 8h to 12h00; PZ33 from 13h30 to 17h30 Thursday 7 October: PM85 from 8h to 12h00; PZ85 from 13h30 to 17h30 Tuesday 12 October :          PM56 from 8h to 12h00; PM65 from 13h30 to 17h30 Wednesday 13 October:     PZ65 from 8h to 12h00; PM76 from 13h30 to 17h30 Thursday 14 October:          PM45 from 8h to 12h00; PZ45 from 13h30 to 17h30 PM56 PZ85 La maintenance du PM56 aura lieu le jeudi 7 de 13h30 à 17h30, celle du PZ 85 le mardi 12 de 8h à 12h. 08/10/2010 LHC status