ILC DR instability simulations

Slides:



Advertisements
Similar presentations
March 22, 2011 Mauro Pivi SLAC ALCPG11 Eugene Oregon March 19-23, 2011 Working Group plans.
Advertisements

Latest ILC DR wiggler simulations M. Pivi, T. Raubenheimer, L. Wang (SLAC) July, 2005.
Helmholtz International Center for Oliver Boine-Frankenheim GSI mbH and TU Darmstadt/TEMF FAIR accelerator theory (FAIR-AT) division Helmholtz International.
Using Tune Shifts to Evaluate Electron Cloud Effects on Beam Dynamics at CesrTA Jennifer Chu Mentors: Dr. David Kreinick and Dr. Gerry Dugan 8/11/2011REU.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
First approach to the SuperB Rings M. Biagini, LNF-INFN April 26th, 2006 UK SuperB Meeting, Daresbury.
ECLOUD Calculations of Coherent Tune Shifts for the April 2007 and January 2009 Measurements - Preparation for PAC2009 FR5RF Paper and Poster - “Effects.
Damping Rings Baseline Lattice Choice ILC DR Technical Baseline Review Frascati, July 7, 2011 Mark Palmer Cornell University.
LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with CHESS to become the Cornell Laboratory for Accelerator-based Sciences.
ElectronsdFud Simulation Work at Cornell Jim Crittenden Cornell Laboratory for Accelerator-Based Sciences and Education.
2011 Damping Rings Lattice Evaluation Mark Palmer Cornell University March 8, 2011.
Sep 29 – Oct 3, 2009 LCWA 09 Linear Collider Workshop of the Americas Sept 29 – Oct 4, 2009 Damping Ring R&D updates SLAC Mauro Pivi SLAC Allison Fero.
Single-bunch Instability Simulation in CesrTA Mauro Pivi SLAC and Kiran Sonnad Cornell U. IWLC October 2010 CERN.
25-26 June, 2009 CesrTA Workshop CTA09 Electron Cloud Single-Bunch Instability Modeling using CMAD M. Pivi CesrTA CTA09 Workshop June 2009.
Report on the Damping Ring Meeting at CERN, Nov , 2005 J. Gao IHEP, Beijing, China Nov. 24, 2005, ILC-Asia Meeting.
Webex Electron Cloud Evaluations for ILC DR Mauro Pivi on behalf of the ILC Electron Cloud Working Group - by Webex - KILC12 – Daegu Korea April 25, 2012.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
March 23, 2010 CMAD a tracking and e-cloud beam instability parallel code (M.Pivi SLAC) Taking MAD(X) optics file at input, thus tracking the beam in a.
Electron cloud in the wigglers of ILC Damping Rings L. Wang SLAC ILC Damping Rings R&D Workshop - ILCDR06 September 26-28, 2006 Cornell University.
Global Design Effort DR Session Introduction S. Guiducci (LNF) ILC10, Beijing 27 March 2010.
1 Simulations of fast-ion instability in ILC damping ring 12 April ECLOUD 07 workshop Eun-San Kim (KNU) Kazuhito Ohmi (KEK)
Damping Ring S. Guiducci AAP Review Tsukuba 20 April 2009.
DR 3.2 km Lattice Requirements Webex meeting 10 January 2011.
Preliminary results on simulation of fast-ion instability at 3 km LBNL damping ring 21 April 2005 Pohang Accelerator Laboratory Eun-San Kim.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
E-cloud studies at LNF T. Demma INFN-LNF. Plan of talk Introduction New feedback system to suppress horizontal coupled-bunch instability. Preliminary.
ILC DR Workshop - KEK December, A new resonance in wiggler simulations: Christine Celata Use POSINST code.
June 16, 2009 Today: Updates on Mitigations KEK – Y. Suetsugu Updates on photoe- estimates by Synrad3D – K. Harkay CesrTA last run and updates on mitigations.
GDE, 26 Oct 2007, FNAL Global Design Effort 1 Damping Rings Area System Summary Andy Wolski.
Motivation and Overview David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
ILC Damping Rings Electron Cloud Working Group Meeting Introduction S. Guiducci (LNF) ECLOUD10, Cornell 13 October
C ESR TA Status Report July 22, 2010 Mark Palmer for the C ESR TA Collaboration.
Cesr-TA Simulations: Overview and Status G. Dugan, Cornell University LCWS-08.
DR to RTML ILC DR Technical Baseline Review Frascati, July 7, 2011 Mark Palmer Cornell University.
Nov 17, 2009 Webex Assessing the 3.2 km Ring feasibility: Simulation parameters for electron cloud Build-up and Instability estimation LC DR Electron Cloud.
Electron cloud measurements and simulations at CesrTA G. Dugan, Cornell University 4/19/09 TILC09 4/18/09.
Highlights from the ILCDR08 Workshop (Cornell, 8-11 July 2008) report by S. Calatroni and G. Rumolo, in CLIC Meeting Goals of the workshop:
Vacuum System S. Guiducci BTR, LNF 8 July RDR - electron damping ring:
Electron Cloud Issues for the 3.2km Positron Damping Ring Mark Palmer (Cornell University) GDE January 18, 2011 ILC Baseline Assessment Workshop 2 SLAC.
Summary David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
WebEx meeting November 17, 2009 ILC Damping Ring Working Group on Electron Cloud LC e- cloud Working Group November 17, 2009.
2011 Damping Rings Lattice Evaluation WebEx Meeting May 24, 2011 Mark Palmer Cornell University.
2011 Damping Rings Lattice Evaluation Mark Palmer Cornell University March 20, 2011.
Electron cloud study for ILC damping ring at KEKB and CESR K. Ohmi (KEK) ILC damping ring workshop KEK, Dec , 2007.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
Damping Ring Specifications S. Guiducci ALCPG11, 20 March 2011.
3 February 2010 ILC Damping Ring electron cloud WG effort Mauro Pivi SLAC on behalf of ILC DR working group on e- cloud ILC DR Webex Meeting Jan 3, 2010.
Feedback Simulations with Amplifier Saturation, Transient and Realistic Filtering Mauro Pivi, Claudio Rivetta, Kevin Li Webex CERN/SLAC/LBNL 13 September.
Electron Cloud in the International Linear Collider ILC Mauro Pivi work performed while at SLAC and the ILC Damping Ring Working Group High.
1 AS TAG Leaders Meeting Webex - Friday S. Guiducci, M. Palmer.
LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with CHESS to become the Cornell Laboratory for Accelerator-based Sciences.
International Linear Collider R&D on electron cloud (SLAC)
Update to ECLOUD Calculations for the
Electron Cloud R&D at Cornell ILCDR08--7/8/08
Ecloud in quadrupole & Sextupole
Intra-Beam Scattering modeling for SuperB and CLIC
Recent Electron Cloud Studies at CESR and Future Plans
Damping Ring Summary S. Guiducci, M. Palmer, M. Pivi, J. Urakawa
E-cloud instability at CESR TA
Single-bunch instability preliminary studies ongoing.
Andy Wolski University of Liverpool and the Cockcroft Institute
M. Pivi PAC09 Vancouver, Canada 4-8 May 2009
ILC DR instability simulations
ILC DR Working Group on Collective Effect: Electron Cloud
ILC Damping Ring electron cloud WG effort
Electron Cloud Build-up in ilcDR
Session Introduction & Damping Rings Baseline Lattice Decision
ILC DR instability simulations
DR Session Introduction
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008)
Presentation transcript:

ILC DR instability simulations CMAD a tracking and e-cloud beam instability parallel code (M.P. SLAC) Taking MAD(X) optics file at input, thus tracking the beam in a real lattice and applying the interaction beam-electron cloud over the whole ring refined simulations: finding density thresholds 1.7e11 e/m3 for DCO4 and 3.5e11 e/m3 for DSB3 DC04 lattice: 6.4 km ring DSB3 lattice: 3.2 km ring (M. Pivi, SLAC)

Tune shift DCO4 CMAD

Tune shift DCO4 No cloud

Tune shift DCO4 1.2e10 e/m3

Tune shift DCO4 1.2e11 e/m3

Tune shift DCO4 CMAD All combined

2006 Recommendation

Base for Recommendation By March we were asked to give a recommendation on the reduction of the ILC DR circumference to 3 km while maintaining the same 6ns bunch spacing and address the electron cloud instability We have used 3 simulation codes ECLOUD, POSINST (CLOUDLAND) to predict the build-up and 1 code CMAD to predict the beam instability threshold for the 6km and 3km Damping Rings, namely DCO4 and DSB3. The codes are currently used for CesrTA simulations. Simulations were performed by the international collaboration in particular at Frascati, Cornell, LBNL and SLAC, from September 2009 to March 2010. 8

Recommendation Summary: given the same current and bunch distance we expect similar or even higher instability threshold for the shorter ring With respect to RDR baseline, the risk level to adopt a reduced 3km Damping Ring while maintaining the same bunch spacing is low. 9

Wrap up simulation results by next Webex meeting In preparation for recommendation of ILC Damping Ring length, proposing a Webex meeting before LCWS10: Tuesday March 23