ORM ASSESSMENT WORKSHEET

Slides:



Advertisements
Similar presentations
#1 KILLER OF MARINE CORPS PERSONNEL Water Sports Swimming, boating, scuba diving, fishing = 13 FY99-03.
Advertisements

Module N° 3 – ICAO SARPs related to safety management
1 Terms of Reference for the GEO Executive Committee Note: These Terms of References were approved at GEO-6 Helen Wood, GEO Secretariat Director.
MN CIMP 2012 COMPLIANCE FOR PARTS OF THE IEP. Compliance Self-Check.
Change Control Change is inevitable - how to manage it?
Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000 Chapter 5 Managing Risk.
OPERATIONAL RISK MANAGEMENT
Operational Risk Management for Airport Emergency Planning
Operational Risk Management
Project plan for ITIL implementation
Project plan for ISO implementation Subtitle or presenter.
Personal Integrity Excellence Service Before Self RelationshipsJoy Safety Always Foundation: Our Core Values.
PHYSICAL FITNESS TESTING PAEC EXAMPLE Effective 01 May 2003.
Community Assessment Training 3- Click to edit Master title style Community Assessment Training 4-1.
Slide 1Lesson 14: Fundamentals of the CAP Flying Safety Program Fundamentals of the CAP Flying Safety Program.
APLA ORGULLO DE PERTENECER.
The Military Decision Making Process
OPERATIONAL RISK MANAGEMENT Indoctrination Training.
OPERATIONAL RISK MANAGEMENT. The Benefits of Risk Management Reduction in Material and Property Damage. Effective Mission Accomplishment. Reduction in.
Project Appraisal: Overview March 28, Country Level Rapid Assessments: Key Areas A. Status of Plans and Activities Current status of AI in the country.
Student Indoctrination Safety Brief
Community Resources Assessment Training 3-1. Community Resources Assessment Training 3-2.
UNCLASSIFIED As of W Feb 08 1 Problem Solving and the Planning Process 13 Feb 08 Multinational Planning Augmentation Team (MPAT)
OPERATIONAL RISK MANAGEMENT
UNMIL ORM IMPLEMENTATION In compliance with United Nations Department of Peacekeeping Operations and Department of Field Support, DPKO and DFS Policy Directive.
Management of Change ► The health, safety, security, environmental, technical and other impacts of temporary and permanent changes are formally assessed,
CNES security development process. 2 Basic rules High level principles for ISS activities on projects are: ■Decisions dealing with security risks must.
Community Resources Assessment Training 4-1. Community Resources Assessment Training 4-2.
Minnesota Wing Safety Meeting July 2010 Lt Col Larry Brockshus MN Wg/SE.
How to Supervise Evaluate
SEVEN STEPS IN PLANNING TO PLAN Prepared by Nancy Bolt Nancy Bolt & Associates For Educational Technology/Information Literacy Planning.
Implementation of the SEVESO II Directive in the Czech Republic Karel Bláha, Pavel Forint Ministry of the Environment.
Hitting the Leadership Target Through Leadership and Accountability.
Project Management Process
{ Risk Management. Step 1. Identify the hazards Identify all hazards associated with the systems of work Risk Management Four Step Process.
Introduction to Project Management
ENVIRONMENTAL PROCESSES. NATIONAL ENVIRONMENTAL MANAGEMENT ACT, 1998 PROCESS FOR SCOPING AND ENVIRONMENTAL IMPACT ASSESSMENT Applicant Activities Public.
Implementation of Insurance Core Principles and FSAP Evaluations The Portuguese FSAP experience Gabriel Bernardino Instituto de Seguros de Portugal.
© Pearson Education Ltd, 2010 Sport Unit 16 Leading Outdoor and adventurous activities.
The Action Planning Process & Template Developing Your International Risk Management Action Plan.
ADVANCED/COMMUNITY/12.2. Carry out risk assessments with support. ADVANCED/COMMUNITY/12.2.
Developing Your International Risk Management Action Plan The Action Planning Process & Template.
ORM ASSESSMENT WORKSHEET MISSION: SNOWMOBILE
The move from a rule based system to a risk based system Challenges for the competent authorities October 2017.
Lesson 10 Operations and Support (O&S) Exercise Team #
ORM ASSESSMENT WORKSHEET MISSION: BUNGEE JUMPING
Service Review and Improvement: Update to RGG
Identify hazards to the force
מערכות ניהול בטיחות ובריאות בתעסוקה - דרישות
ORM ASSESSMENT WORKSHEET MISSION:
Annual Briefing Discussion
ORM ASSESSMENT WORKSHEET MISSION: HOT AIR BALLOON
Single Subject Protocol Modification
Presentation on Value of having process driven organization & Its Challenges and prospects Review History: Ver# Prepared By Date Reviewed By.
Mitigation Strategy “The long-term blueprint for reducing the potential losses identified in the risk assessment. The mitigation strategy includes the.
Learning and teaching – lessons 3 School culture 4
ORM ASSESSMENT WORKSHEET MISSION: RODEO
Risk Assessment Matrix
Flow Process of Work Plan for approval
Safety Risk Management (SRM) Process Overview
Operational Risk Management (ORM) and the Driving Task
Introduction to Risk Management.
Assessment Report Insert Year
Overview: ICS Evaluation Procedures
Thing / Person:____________________ Dates:_________________
Course of Action Development
IRRS Mission 2011 to Switzerland: Resulting Improvements to Regulatory Processes P. Flury.
Introduction You will be shown 8 scenarios involving children.
Risk Management NDS Forum June 23rd 2010.
Presentation transcript:

ORM ASSESSMENT WORKSHEET MISSION: DATE WORKSHEET PREPARED: _________________ APPROVAL / AUTHORITY: _______________________ PARTICIPANT(S): APPROVED / DISAPPROVED STEP 2: ASSESS HAZARDS STEP 1. IDENTIFY HAZARDS STEP 3: MAKE RISK DECISIONS STEP 4: IMPLEMENT CONTROLS STEP 5: SUPERVISE OPERATION HAZARD CAUSES INIT RAC DEVELOP CONTROLS RESID RAC HOW TO IMPLEMENT HOW TO SUPERVISE LESSONS LEARNED: ACCEPT RISK: YES NO COMM WITH HIGHER: YES NO ALL WORKSHEETS ARE IN COMPLIANCE WITH OR MEET THE INTENT OF CNATRA 3058/1 (5-05)