Indication for WUR Duty Cycle

Slides:



Advertisements
Similar presentations
2200 Mission College Blvd., Santa Clara, CA 95054, USA
Advertisements

WUR Negotiation and Acknowledgement Procedure Follow up
2200 Mission College Blvd., Santa Clara, CA 95054, USA
Vendor Specific WUR Frame
WUR Negotiation and Acknowledgement Procedure Follow up
High Level MAC Concept for WUR
2200 Mission College Blvd., Santa Clara, CA 95054, USA
Mature Topics for Draft 0.1
2200 Mission College Blvd., Santa Clara, CA 95054, USA
BSSID Information in FCS
TBD clarification for TGba D0.1 (WUR Duty cycle)
Overview of ba Power Management in D0.4
Computation of TSF Update
Examples of Integrating WUR with Existing Power Save Protocol
Suggested Practice for SFD and Draft Spec Text Proposal
Vendor Specific WUR Frame Follow Up
Vendor Specific WUR Frame Follow Up
2200 Mission College Blvd., Santa Clara, CA 95054, USA
Operation after Wake-up Frame Transmission and Reception
Overview of ba Power Management in D0.4
Overview of ba Power Management in D0.4
2200 Mission College Blvd., Santa Clara, CA 95054, USA
WUR Action Frame Format Follow up
Operation after Wake-up Frame Transmission and Reception
Vendor Specific WUR Frame Follow Up
Indication for WUR Duty Cycle
Starting Time Indication of WUR Beacon and Duty Cycle Operation
Wake Up Response mode to WUR frame
WUR Action Frame Format Follow up
Overview of ba Power Management in D0.4
Power saving operation for WUR STAs in duty cycle mode
Consideration of EDCA for WUR Signal
2200 Mission College Blvd., Santa Clara, CA 95054, USA
WUR frame format follow-up
Communicating Wake-up Operating Parameters
Vendor Specific WUR Frame Follow Up
2200 Mission College Blvd., Santa Clara, CA 95054, USA
2200 Mission College Blvd., Santa Clara, CA 95054, USA
Power saving operation for WUR STAs in duty cycle mode
Comment Classification for Draft 1.0
Comment Classification for Draft 1.0
Comment Classification for Draft 1.0
2200 Mission College Blvd., Santa Clara, CA 95054, USA
WUR frame format follow-up
19, Yangjae-daero 11gil, Seocho-gu, Seoul , Korea
Comment Classification for Draft 2.0
Operation after Wake-up Frame Transmission and Reception
Operation after Wake-up Frame Transmission and Reception
19, Yangjae-daero 11gil, Seocho-gu, Seoul , Korea
BSSID Information in FCS
Comment Classification for Draft 2.0
19, Yangjae-daero 11gil, Seocho-gu, Seoul , Korea
2200 Mission College Blvd., Santa Clara, CA 95054, USA
Communicating Wake-up Operating Parameters
Comment Classification for Draft 2.0
TD Control field with Response indication in WUR frame
WUR Negotiation and Acknowledgement Procedure Follow up
2200 Mission College Blvd., Santa Clara, CA 95054, USA
Overview of ba Power Management in D0.4
Power saving operation for WUR STAs in duty cycle mode
Consideration of EDCA for WUR Signal
Indication for WUR Duty Cycle
Starting Time Indication of WUR Beacon
2200 Mission College Blvd., Santa Clara, CA 95054, USA
Comment Classification for Draft 3.0
WUR Negotiation and Acknowledgement Procedure Follow up
Comment Classification for Draft 3.0
Comment Classification for Draft 3.0
Comment Classification for Draft 3.0
Comment Classification for Draft 3.0
Presentation transcript:

Indication for WUR Duty Cycle July 2008 doc.: IEEE 802.11-08/1021r0 Indication for WUR Duty Cycle Date: 2017-05-08 Name Affiliation Address Phone Email Po-Kai Huang Intel 2200 Mission College Blvd., Santa Clara, CA 95054, USA   +1-408-765-8080   po-kai.huang@intel.com Minyoung Park minyoung.park@intel.com Robert Stacey robert.stacey@intel.com Po-Kai Huang et al. (Intel) Peter Loc

Abstract In [1], it is agreed to have duty cycle mode for WUR STA In [2], the view of duty cycle schedule from the STA is shared In this presentation, we share our view of duty cycle service period/schedule negotiation, which aligns with the concept introduced in [2] with further flexibility Intel

Essential Parameters for duty cycle schedule negotiation There are three essential parameters for duty cycle schedule negotiation On Duration Period Starting point of one schedule (through direct indication or reference point plus offset) Period Starting point On Duration Period Reference point Offset On Duration Intel

Negotiation for Essential Parameters for duty cycle schedule negotiation Our considerations for the design are to Simplify the negotiation procedure Have flexibility on the STA side based on different power/latency constraints Have flexibility on the AP side for optimizing schedules of different STA Specifically, on the STA side, STA negotiates the on duration and period based on different power/latency constraints On duration and period follows certain rule indicated by AP (discuss below) On the AP side, AP decides the starting point to optimize schedule AP indicates a basic unit of period such that the period negotiated by the STA is a multiple of the indicated basic unit from AP AP announces a minimum wake-up duration so that STA does not negotiate an on duration that is too short Intel

An example to illustrate the proposal AP indicates unit T for the period AP Indicates minimum wake-up duration ¼ T AP decides starting point STA negotiates on duration and period STA1, STA2, STA3 starts from t0 STA4 starts from t1 2T TON_1 = ½ T STA1 DC=1/4 4T TON_2 = ¼ T STA2 DC=1/16 3T TON_3 = ¼ T STA3 DC=1/12 3T STA4 DC=1/3 T (e.g. 10ms) t0 t1 t2 t3 t4 t5 t6 t7 Intel

Conclusion We discuss WUR duty cycle schedule indication We propose the following AP indicates the basic unit for the period of WUR duty cycle AP Indicates minimum wake-up duration for each WUR duty cycle schedule AP decides starting point STA negotiates on duration and period Intel

Straw Poll 1 Do you support the following? The period of the WUR duty cycle as shown below is a multiple of a basic unit The basic unit is indicated by the AP 32 Y 0 N 17 A Period On Duration Intel

Straw Poll 2 Do you support the following? The on duration in each period for WUR duty cycle as shown below is larger than or equal to a minimum wake-up duration The minimum wake-up duration is indicated by the AP 16 Y 2 N 22 A Period On Duration Intel

Straw Poll 3 Do you support the following? AP decides the starting point for one WUR duty cycle schedule How to indicate the starting point is TBD 20 Y 0 N 20 A Intel

Motion 1 Move to add the following to 11ba SFD: The period of the WUR duty cycle as shown below is a multiple of a basic unit The basic unit is indicated by the AP Move: Po-Kai Huang Second: Bin Tian Y: 27 N: 3 A: 7 Period On Duration Intel

Motion 2 Move to add the following to 11ba SFD: The on duration in each period for WUR duty cycle as shown below is larger than or equal to a minimum wake-up duration The minimum wake-up duration is indicated by the AP Move: Po-Kai Huang Second: Suhwook Kim Y: 28 N: 1 A: 9 Period On Duration Intel

Motion 3 Move to add the following to 11ba SFD: AP decides the starting point for one WUR duty cycle schedule How to indicate the starting point is TBD Move: Po-Kai Huang Second: Suhwook Kim Y: 26 N: 0 A: 9 Intel

Reference [1] 11-17-0342-04-00ba WUR Negotiation and Acknowledgement Procedure Follow up [2] 11-17-0364-00-00ba Low Latency and Medium Utilization Intel