Planning at 5 o’clock meeting Friday

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Ion Commissioning: Thursday & Friday
Wednesday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
Wednesday 8.9 External crossing angles:
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 24 March 2012.
Wednesday 21 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Summary of week 7 Hardware Commissioning:
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Status of LHC Operations
Tue :25 Beams dumped due to RF vacuum interlock
Thursday morning – optics correction
Machine availability reaching well over 80%
Tuesday TOTEM and transverse loss map (1) OK
Alice solenoid – orbit distortion
Summary week 30 Week 30 R. Bailey & J. Wenninger
Summary of Week 13 G. Arduini, B. Holzer
Summary of Week 16 G. Arduini, J. Wenninger
Lost at 12:05 to power converter (RTQX2.R1) problem
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Saturday 2/4/ :00-09:00 Problems with SPS:
Friday March 4th 08h32: Access for beam dump system.
Tuesday 20 March 2012.
Week 35 – Technical Stop and Restart
Monday February 28th 8h00: Injection
Week 36 Machine coordinators R.Assmann, R.Bailey
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Saturday 7th May Sat – Sun night
Friday 23rd March 08:00 Access
Summary Thursday h21: Stable beams fill #1303.
Planning for the week MO M P
Aims for the week Recover from technical stop and precycle at 10A/s
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Programme for Friday 9 July
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
07/08/2010 Fill #1264 dump at 02:14:38.
Sat morning Until 12:40: Loss maps at injection
MD Planning Fri – Sat (1. – 2.7.)
Summary for LPC (March 7th, Ralph Assmann)
LHC status - Week 35 G. Arduini, M. Lamont Main aims:
Wednesday 23/2 Thanks CRYO!!!.
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
RAMP FOR COLLIMATOR SETUP
LHC Morning Meeting - G. Arduini
Another Immortal Fill….
31/3/2010 Difficult day… but at the end stable beams.
15/12/2009 Vacuum interlock in sector 78 understood  out-gassing of a Penning gauge ignited as a result of ionization or dust arcing In conclusion: NO.
Tuesday
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Planning at 5 o’clock meeting Friday 8   Access A Recover N Kick-response campaign SA Initial commissioning of beam dumping system, beam 1 and 2 B1/B2 Key beam parameters revisited - beam 1 & 2, beam size etc. measure & correct tune, chromacity, coupling both beams B1/B2, pilot Optics measurements (beta beating meas and correct) SU Protection devices and collimator setting-up - b2/b1 4 MPS tests: FMCM, time delays Trial ramps B1, pilot MO Solenoids/coupling compensation pilot, b1 MPS: BLM thresholds - check plus thresholds and checks on beam dump BLMs B1/B2 pilots Aperture measurements pilot, B2 TU Two Beam Operation setting-up - 450 GeV - bumps 2x2, 5e9 MPS: aperture in insertion regions, Calibration/check of triplet BLMs, experiment dump tests with BCM pilot Solenoids & dipoles ON WE MPS: provoke magnet 'trip' and check adequate protection by collimators 450 GeV collision setting-up - experiments 2x2, 2e10 450 GeV collisions 1/3/2019

Friday Recovering from cryo PLC problem S34 (02.00) Limited access in the shadow for essential things TCDQ issue understood (IN<->OUT) Cryo S34 back at 18.00 Still problems to get all QPS OK S45 access needed Pre-cycling sectors when possible Finally all (needed) circuits OK at 23.00 Struggled with the injection interlock system Beam in around 01.30 Overnight Re-established conditions for beams 1 and 2 Kick response beam 2 (sectors 12 23 34 45 done) Beam dumps due to beam loss when starting sector 56 PS off from 04-07 1/3/2019

Saturday Beam dump studies started around 08.00 Synchronisation checked with beam by scanning RF bucket through sweeps for B1 and B2: beam 2 system looks spot on, beam 1 kick is too late by about 1ms - need to adjust to exact value with access to UA when opportune - in the meantime should use RF bucket 500 to make sure beam is extracted (bucket 1 ends up on TCDS and will provoke interlock). Protection devices and aperture scans Aperture scanned for B1 extraction channel Apertures look similar to those obtained for B2 on Monday Physical apertures seem OK on both planes Verification of the protection in case of asynchronous dump

Saturday Orbit Reference orbit B1 and B2 using common correctors Tune, coupling and chromaticity measurement and correction C_ down to ~0.005 (Beam 1)/0.0025 (Beam 2) after correction Chromaticity Measured values from +- 100, 50,0 trims off ref Beam 1  Q’H=+5 - Q’V=+7 Beam 2  Q’H=+9 - Q’H=+8 Undulator RU.L4 ON at 50 A: no effect on orbit/tune (Beam 2)  but not sufficient to see synch light  HW commissioning to be continued

Saturday BI commissioning summary phased in horizontal and vertical MKQA tune kicker for B1 and B2 measured and corrected PLL beam transfer function for B1 and B2 system (B2 requires some polarity/mapping checks) tested continuous radial modulation via the orbit feedback controller and verified switch on/off procedures, frequency and amplitudes behaviour performed initial PLL lock studies with B1, initial results look very promising, further assessment w.r.t. nominal PLL performance (bandwidth/sensitivity to resolve dp/p changes in the order of 1e-5) is needed performed semi-automatic chromaticity measurements and preliminary tune modulation/de-modulation studies in view of continuous Q' tracking -> some FESA/SW issues have been identified that need to be addressed Not yet ready for tune/chromaticity feedback

Saturday/Sunday Summary of beta-beating studies: The beta-beating in beam2 was very different to the beta-beating measured before the ramp (most likely due to the lack of precycling then). For Beam1 the initial beta beating agrees with the measured after the ramp (Friday 00:00 am), proving no changes in time with proper pre-cycling. The first local error was found and successfully corrected in IP2 (MQXB2.R2 + 7e-5 and MQXB2.L2 -5e-5). A reduction of the peak vertical beta-beating in beam 1 of 10% was observed. No change was observed in the peak b-beat in beam 2 and the horizontal of beam1. We removed all the trims and re-measured the initial conditions without observing any change (no hysteresis effects). Another study in IP7 was started but due to lack of time and frequent beam absence was not conclusive.

Sunday Summary collimation setup: BEAM1: => All IR3, IR7 to nominal settings (primary aperture about 5.7 sigma) ==> multi-stage collimation is set up ==> Dump protection IR6 set up ==> TCT's in IR1 cross-checked: rough setting confirmed ==> Other TCT's not touched: at +-15 mm around +-15-25 sigma BEAM2: ==> All IR3, IR7 to nominal settings (primary aperture about 5.7 sigma) ==> mutli-stage collimation is set up ==> Dump protection IR6 set up ==> TCT's not touched: at +-15 mm around +-15-25 sigma Additional tests: ==> Check on interlock threshold for tungsten collimators (see logbook entry) ==> Movement and beam loss response check for vertical Roman Pots, beam1 1/3/2019

Sunday MPS checks Ramp tests Problem with patrol box in ATLAS 2-4 FMCM reaction checks etc Ramp tests Second LHC ramp with beam 1 to 1.04 TeV Tunes feed forward for next time Machine did not come back (no pre-cycle) Tunes off for beam 1 Tunes trimmed (beam 1) and incorporated into ramp Third ramp with both beams to 1.18 TeV !! Problem with patrol box in ATLAS 2-4 Injected again around 6 Beam 2 OK Beam 1 tunes wrong 1/3/2019

Ramp 2 orbits 1/3/2019

Ramp 2 tunes 1/3/2019

Ramp 3 tunes B1 1/3/2019

Ramp 3 tunes B2 1/3/2019