Gustaaf van Moorsel September 9, 2003

Slides:



Advertisements
Similar presentations
National Radio Astronomy Observatory June 13/14, 2005 EVLA Phase II Proposal Review EVLA Phase II Computing Development Bryan Butler (EVLA System Engineer.
Advertisements

Software for Science Support Systems EVLA Advisory Committee Meeting, March 19-20, 2009 David M. Harland & Bryan Butler.
EVLA Computing Schedule, Staffing, Testing, Tracking.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June
ALMA Software B.E. Glendenning (NRAO). 2 ALMA “High Frequency VLA” in Chile Presently a European/North American Project –Japan is almost certainly joining.
Doug Tody E2E Perspective EVLA Advisory Committee Meeting December 14-15, 2004 EVLA Software E2E Perspective.
Overall Data Processing Architecture Review EVLA Monitor and Control Interfaces July , 2002EVLA Data Processing PDR Bill Sahr.
Bill SahrEVLA Advisory Committee Meeting May 8-9, EVLA Monitor & Control.
Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, EVLA Monitor & Control.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, 2006 EVLA Computing Software Overview.
Peter NapierEVLA Correlator CoDR Nov 2, EVLA Correlator CoDR P. Napier Overall EVLA Project Plan.
EVLA Software Bryan Butler. 2007May22EVLA SAGE Meeting2 Requirements and Goals of EVLA Software Maximize scientific throughput of the instrument At a.
R MoeserCorrelator f2f Meeting1 MCAF (Metadata Capture and Formatting) Rich Moeser.
2007Sep06 EAC Butler - Software Overview 1 Software Overview Bryan Butler.
1 KFPA Critical Design Review – Fri., Jan. 30, 2009 KFPA Data Pipeline Bob Garwood- NRAO-CV.
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
14 June, 2004 EVLA Overall Design Subsystems II Tom Morgan 1 EVLA Overall Software Design Final Internal Review Subsystems II by Tom Morgan.
RupenEVLA Advisory Committee Meeting May 8-9, Scientific Oversight and Testing of Software Michael P. Rupen EVLA Project Scientist for Software.
Introduction to EVLA Software Bryan Butler. 2006Dec05/06EVLA M&C Transition Software CDR2 EVLA Computing (Terse) History The original EVLA Phase I proposal.
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing Organization/Development.
EVLA Computing Software Overview. Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, Contents History Organization and staffing Staffing.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
Bryan ButlerEAC meeting 2003-Sep-091 Computing Issues: Scientific Requirements Bryan Butler EVLA Project Scientist for Software (starting 2003-Oct-01)
RupenEVLA Advisory Committee Meeting May 8-9, Software Requirements Michael P. Rupen EVLA Project Scientist for Software rev. 3may06.
N. RadziwillEVLA Advisory Committee Meeting May 8-9, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
EVLA Data Processing PDR E2E Data Archive System John Benson, NRAO July 18, 2002.
M.P. RupenEVLA Advisory Committee Meeting September 6-7, Correlator Test Plan Michael P. Rupen.
EVLA Monitor & Control Software PDR Status. May 15, 2002EVLA Monitor & Control Software PDR Bill Sahr 2 Requirements, Schedule Requirements (High Level,
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing End-to-end (E2e) software.
Software Requirements for the Testing of Prototype Correlator Sonja Vrcic Socorro, December 11, 2007.
Bill SahrNSF Review May , EVLA Monitor & Control.
Computing Introduction Gareth Hunt EVLA System PDR 2001 December 04.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Overall Data Processing Architecture EVLA timeline and priorities.
Software Overview Sonja Vrcic
Bryan Butler EVLA Computing Division Head
Archive, Data Products, & Operations for the Murchison Widefield Array
EVLA Archive The EVLA Archive is the E2E Archive
EAC Butler - SSS Software
Monitor and Control Software
EVLA Overall Software Design
EVLA Computing Software Overview.
Budget, Schedule, Contingency
Software Requirements
EVLA M/C Software PDR, 14 May 2002
Observational Astronomy
Observational Astronomy
Scientific Oversight and Testing of Software
Scheduling Toolkit Observation Scheduling Boyd Waters, NRAO
VLA to EVLA Transition Plan
Bryan Butler (for Bill Sahr)
EVLA Computing Reorganization
EVLA Advisory Committee Meeting
Software Requirements
Software Requirements
Mark McKinnon EVLA Project Manager
Background Information P.Napier
NRAO End to End Integrated Operations
EVLA Advisory Committee Meeting, March 19-20, 2009
Observatory Science Operations
EVLA M&C Components Observation Executor, Interim & Final Obs2script
Observatory Science Operations
EVLA Monitor & Control Bill Sahr NSF Review May , 2006
EVLA Construction Status
Requirements Bryan Butler.
Presentation transcript:

Gustaaf van Moorsel September 9, 2003 EVLA end-to-end (e2e) Gustaaf van Moorsel September 9, 2003

Principal EVLA Subsystems Proposal Preparation and Submission Observation Preparation Observation Scheduling Data Archive Image Pipeline Data Post-Processing Monitor and Control System CBE Correlator Antenna Feed Receiver IF System Fiber Optics Transmission System Local Oscillator NRAO Data Management Group (e2e project) EVLA Project Canadian Partner Primary data flow Principal EVLA Subsystems Control and monitor flow

EVLA Advisory Committee Meeting Introduction e2e effort so far has been either Instrument specific (e.g. VLA scheduling) Multi-instrument (e.g. proposal handling) EVLA related effort needed EVLA specific requirements Written in 2002 and 2003 4 ready/advanced draft 1 still in progress (real-time) 1/2/2019 Gustaaf van Moorsel EVLA Advisory Committee Meeting September 8-9, 2003

EVLA Advisory Committee Meeting EVLA Requirements Available or in progress: Operations Engineering Scientific Real-time In preparation Old (2001) version exists Post-processing 1/2/2019 Gustaaf van Moorsel EVLA Advisory Committee Meeting September 8-9, 2003

EVLA Advisory Committee Meeting EVLA Requirements (2) A sixth document, the Systems Requirements Specification (SRS) for the EVLA Software System is in preparation The SRS for the EVLA Software will: Summarize the principal requirements contained in the other 5 requirements documents Serve as a basis for an overall functional specification and design Be placed under revision control. All changes will require the approval of the EVLA Change Control Board 1/2/2019 Gustaaf van Moorsel EVLA Advisory Committee Meeting September 8-9, 2003

EVLA Advisory Committee Meeting Project management Reconcile requirement documents - done E.g. M&C needs archive fast Estimate workload, assign resources – in progress OK for next 12 months Decide about possible de-scoping, using priorities in requirement documents Define intermediate targets Keep abreast of parallel efforts in ALMA 1/2/2019 Gustaaf van Moorsel EVLA Advisory Committee Meeting September 8-9, 2003

Proposal Submission/ Management Scientific Requirements: Q2 2007 Prototype ready for testing (VLA, GBT?) EVLA Requirements not taken into account; some EVLA already there Extra work for EVLA moderate Currently: lower priority 1/2/2019 Gustaaf van Moorsel EVLA Advisory Committee Meeting September 8-9, 2003

Observation Preparation Scientific Requirements: Q2 2007 First needed: observing scripts – Q4 2003 Needed for test antenna Written in Jython GUI tool: lower priority 1/2/2019 Gustaaf van Moorsel EVLA Advisory Committee Meeting September 8-9, 2003

Observation Scheduling Scientific Requirements: 2005 Q4 Current status: GUI has been developed for VLA expandable to EVLA with some modifications Simple VLA Dynamic Scheduling Expandable to meet EVLA requirements Look at ALMA dynamic scheduling 1/2/2019 Gustaaf van Moorsel EVLA Advisory Committee Meeting September 8-9, 2003

EVLA Advisory Committee Meeting Data Archive Requirements time scales: M&C 2003 Q2 completed Engineering 2004 Q2 Science 2007 Q2 Current status VLA, VLBA, GBT on disk Catalog search and data retrieval tool 1/2/2019 Gustaaf van Moorsel EVLA Advisory Committee Meeting September 8-9, 2003

Archive – EVLA specific additions Support multiple data streams Support TBD data format User interface – mostly there M&C data – done Logging Other items – proposal, observe file, etc 1/2/2019 Gustaaf van Moorsel EVLA Advisory Committee Meeting September 8-9, 2003

EVLA Advisory Committee Meeting Image Pipeline Scientific Requirements time scales: Real-time Calibrator Analysis: 2007 Q2 Quick Look Pipeline: 2010 Q2 Initially: emphasis on ALMA 1/2/2019 Gustaaf van Moorsel EVLA Advisory Committee Meeting September 8-9, 2003

EVLA Advisory Committee Meeting Data Post-processing AIPS++, next 10 months Development focused on ALMA acceptance Acceptance criteria parallel with EVLA Thereafter: EVLA specific software, e.g. Wide Field Imaging Wide Band Imaging RFI Excision 1/2/2019 Gustaaf van Moorsel EVLA Advisory Committee Meeting September 8-9, 2003

EVLA Advisory Committee Meeting Other Issues Wrapper for CALC program – Q4 2003 Provides interferometer model to correlator Needed for pointing test antenna Real-time Calibrator Analysis Tool (RTCAT) Q3/4 2004 Required for certain observing modes Reference pointing VLBI auto-phasing Determination of focus parameters Data quality displays 1/2/2019 Gustaaf van Moorsel EVLA Advisory Committee Meeting September 8-9, 2003

EVLA Advisory Committee Meeting Other Issues (2) Visibility Data may be needed prior to 2007 Capture output prototype correlator Q1 2005 Output first functional fraction Q4 2006 Quick-look Pipeline Tool Direct or through archive (too slow)? Astronomer’s what’s up Display – Q2 2007 1/2/2019 Gustaaf van Moorsel EVLA Advisory Committee Meeting September 8-9, 2003

Questions to Advisory Committee How should we proceed if our resources should turn out to be insufficient? What are criteria to adopt software components developed for e.g. ALMA? 1/2/2019 Gustaaf van Moorsel EVLA Advisory Committee Meeting September 8-9, 2003