Closing Plenary Meeting Report for SG 100G Group (1/3) September 2013 Closing Plenary Meeting Report for SG 100G Group (1/3) Meeting was called to order at 8.05 am on September 17 and finished at September 19 at 10.45 am. Number of meetings: 4 Total number of attendees :14 Total number of contributions: 4 Contributions on Tuesday AM1 Contribution #1 : Thomas Kürner, TU Braunschweig (Germany), SG Inauguration/Tasks of SG; (Document 15-13-0524-02-0thz) Contribution #2 : Cai Yunlong, Huawei (China) ,“Data Center Traffic Characteristics and 100Gb/s Demand”; (Document 15-13-0519-00-0thz) Contribution #3 : Rick Roberts, Intel (USA), A Terse Protocol Layer Tutorial; (Document 15-13-0545-0thz) Thomas Kürner, TU Braunschweig
doc.: IEEE 802.15-<doc#> <month year> doc.: IEEE 802.15-<doc#> September 2013 Closing Plenary Meeting Report for SG 100G Group (23) Contributions on Tuesday AM2 Contribution #4 : Rick Roberts, Intel (USA), “Suggested draft text for SG 100G PAR and 5C “; (Document 15-13-0504-0thz) Tasks completed during the meeting: SG Leadership has been completed: Chair: Thomas Kürner (TU Braunschweig) – already appointed at July Plenary Vice-Chair: Iwao Hosako (NICT) – Straw Poll 9 yes/0 no /1 abstain Secretary: Cai Yunlong (Huawei) – Straw Poll 10 yes / 0 no / 0 abstain Technical Editor: Rick Roberts (Intel) – Straw Poll 10 yes / 0 no / 0 abstain Press Release on the formation of the new study group has been discussed. Initial Working Draft for PAR and 5C have been created (Documents 15-13-0522-01-0thz and 15-13-0523-01-0thz, supporting Document 15-13-0561-01-0thz,) Work on the Technical Expectation Document (TED)“. The content of the TED has been discussed and updated (Document 15-11-0745-10-0thz) Thomas Kürner, TU Braunschweig <author>, <company>
doc.: IEEE 802.15-<doc#> <month year> doc.: IEEE 802.15-<doc#> September 2013 Closing Plenary Meeting Report for SG 100G Group (3/3) Tentative Timeline for the SG November 2013 Plenary: 1st joint meeting with 802.1 January 2014 Interim: 2nd joint meeting 802.1 Finishing complete draft PAR and 5C ready for WG approval and submission to EC March 2014 Plenary: Adressing comments and getting PAR and 5C done May 2014 Interim Potential Kick-off of a Task Group Thomas Kürner, TU Braunschweig <author>, <company>