Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
LHC Status Fri Morning 3-June
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Wednesday September 14th
Friday 18/03 07:15 Test ramp with pilot after the test of dynamic FIDEL correction. Ramp was OK, but fill was stopped due to the trip of several RQTFs.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Tuesday Nov 16th Fill 1492 into physics around 07.30
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Monday 14th March Second fill with pilot + 3 nominal bunches
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
LHC Operation Week 41 Coordination G.Arduini, M. Lamont
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Summary of Week 11: 14 – 21 March
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
LHC Operation Week 38 Coordination G.Arduini, R.Bailey
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
LHC operation in week 39 Coordination: Mike Lamont, Jan Uythoven, Malika Meddahi Thanks to OP crews, HW and SW teams + patient customers Aims for the week.
Wednesday 31 October: Morning
Lost at 12:05 to power converter (RTQX2.R1) problem
LHC Morning Meeting - G. Arduini
Wednesday 8th August & night
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Wire almost entirely through beam before BLM triggers dump
Yesterday’s morning’s controls issues
Not the most productive 24 hours on record
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
Friday Morning 7:30 injection for fill 2908
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Summary Thursday h21: Stable beams fill #1303.
Aims for the week Recover from technical stop and precycle at 10A/s
Monday 14:00 beam dump Access:
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Thursday Fill 1364 (24 bunch) dumped at 07h
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Thursday 22 September 2011.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
Sat 18/3 - Ramp to 4 TeV Again glitch on the safe beam flag for beam 2. Cause identified: noise on BCT2B giving values above the safe beam limit (2.4×1010.
Tuesday 20 September 2011.
Wednesday 23/2 Thanks CRYO!!!.
Thursday 30th September De-bunching test
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday 15th February - morning
Another Immortal Fill….
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
Wednesday 6.10 Morning: Quench test at 450 GeV
Saturday 26 November 2011.
Tuesday
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Monday 152 bunch operation summary
Presentation transcript:

Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots ‘Safe ones’ first Vertical one, which in the past caused UFO, move in 15 minutes before end of fill No problem! 11:25 End of Fill 1375 (104 bunches) Lumi: 952, 1.59, 932, 889 nb-1 PM: Planned for injection studies. Instead we had: RQD.A81 trip PS MPS problem (DCCT and controls) No beam most of the afternoon 17:30 Inject for the first time 152 – 8 =144 bunches ! 8 bunches did not go in because of Abort Gap Keeper Successful test of Software and Hardware Interlocks 29/9/2010 LHC status

Tune FB Preliminary look at Tune-FB outage during the last ramp: Swapped the 'development' with 'old operational' BBQ system, now containing a 400 MHz low-pass filter prior to the BBQ detector. This fillter effectively reduces the intensity seen by the BBQ by more than a factor of two. Still, the time the B1/2 switched 'off' during the ramp seems to coincide with the longitudinal activity which may indicate that this switch-off is primarily related to the BBQ sensitivity to longitudinal effects (bunch shape/filling pattern) than the bunch intensity itself. While noisy, tunes seemed to be tracked -- in contrast to previous ramps where the tune lines were swamped by an increasing noise-level in the BBQ spectra. Attached measured tunes during ramp, flat-top, squeeze and physics. Suspect additional interference lines in the spectra. Tune-FB switched 'off' for B1 during the squeeze due to (possibly spurious) betatron coupling dominating the effective tune-split. B2 signals and measured seemed to be fine though... Further analysis is required... Ralph S. 29/9/2010 LHC status

Roman Pots – all going fine… After all pots were in TOTEM took data for ~20 min (20 nb^-1) before the beam was dumped with a programmed dump. No "UFO" type losses were seen 29/9/2010 LHC status

12:00 RQD.A81 trip Trip due to QPS at the end of the cycle. On the rampdown the RQD.A81 tripped near the end of the cycle. There was clearly some noise on the U_RES around RQD./RQF at 11R8 but the trip ( with heaters firing) appears to be triggered 0.1mv below the 0.5mV threshold. 29/9/2010 LHC status

Tuesday continued 20:00 Shift last injection by 250 ns to avoid AGK stopping injection and successfully inject 152 bunches Dump for interlocked BPM test: OK Fill for physics (the plan) 21:45 Beams dumped at end of 1st squeeze step. BLMs left of 2 triggered, fast localized loss. Possibly another UFO event. Orbit was fine, tunes under control, lifetime above 25 hours. 29/9/2010 LHC status

Tuesday Night / Wednesday Morning 00:00 Fill again with152 bunches IQC fine again 01:02 Beams dumped in ramp around 1 TeV Trip of undulator RU.L4, Ures above thresholds Trip of RQ9.R1 during the ramp down, can be reset At the end of precycle of S12, RQT13.L2B2 tripped at zero current 04:00 Pilots in again Lost QPS-OK on RB.67 because of a heater discharging on MBA8.L7-> Access: Standard change of switch 08:15 QPS ok Prepare for injection studies 8 & 16 bunches 29/9/2010 LHC status

TOTEM – 1 to 2 hours before EOF Plans TOTEM – 1 to 2 hours before EOF Wednesday 29th M/A Injection Studies 16 bunches A/N Physics 152 b Thursday 30th M Abort Gap Cleaning Feedback Controller update and tests at 450 GeV N Friday 1st VdM Atlas & CMS (LHCb next week) 29/9/2010 LHC status

On the list Transverse damper – 2 hours without beam – no access MKQA – possible access Voltage rampdown@injection Lift maintenance Intensity effects Vacuum – point 5 – sharp increase during ramp, dropping back off after end Quench test with circulating beam – access required first to install RADMONs Test of new beam presence flag system – M. Gasior CO security intervention to be scheduled - A.Bland 29/9/2010 LHC status

BI MD - c/o JJG – One Shift Measure the sensitivity of Marek’s new beam presence detection system Check the linearity of the fast BCT’s in the new configuration for nominal bunches Tune the High BW/Low Gain fast BCT calibration for the coming ion run Measure the High BW/Low Gain fast BCT sensitivity limit and linearity for low intensity bunches (ion run) Re-check BPM sensitivity limit Calibrate the abort gap over the whole ramp Check the abort gap acquisition gate timing resolution and stability Commission BGI in preparation to ions Check BSRT/BGI/BWS cross-calibration including corresponding emittance logging Test and compare bunch/bunch profile measurement via BWS and/or BSRT For all this, we would need the 2 rings for a few hours at 450 GeV then a ramp and again a few hours at 3.5 TeV. This would be really difficult to fit in a 4 hour slot. 8 would be perfect but we could try with 6. 29/9/2010 LHC status