Sport Obermeyer.

Slides:



Advertisements
Similar presentations
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200.
Advertisements

$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
WHO WANTS TO BE A MILLIONAIRE? CAPACITY STYLE.
Inventory Control Models
Sport Obermeyer Case Prof Mellie Pullman.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
“Students” t-test.
The Normal Distribution
Chapter 6 Continuous Probability Distributions
CHAPTER 21 Inferential Statistical Analysis. Understanding probability The idea of probability is central to inferential statistics. It means the chance.
1 1 Slide MA4704Gerry Golding Normal Probability Distribution n The normal probability distribution is the most important distribution for describing a.
Measures of Effectiveness 1 Ardavan Asef-Vaziri 6/4/2009 Forecasting - 4 Chapter 7 Demand Forecasting in a Supply Chain Forecasting - 3 Demand Pooling.
Practice Problem Chapter 5 (Decision Trees)
In this handout Stochastic Dynamic Programming
Assuming normally distributed data! Naïve Bayes Classifier.
Measures of Effectiveness 1 Ardavan Asef-Vaziri 6/4/2009 Forecasting - 4 Chapter 7 Demand Forecasting in a Supply Chain Forecasting - 3 Demand Pooling.
Supply Chain Management
1 1 Slide © 2006 Thomson/South-Western Chapter 6 Continuous Probability Distributions n Uniform Probability Distribution n Normal Probability Distribution.
Phase Difference = Phase Difference = 0.05.
(a) : If average demand per day is 20 units and lead time is 10 days. Assuming zero safety stock. ss=0, compute ROP? (b): If average demand per day is.
Customer Demand Customer demand varies in both timing and quantity:
Functional Versus Innovative Products
A) If average demand per day is 20 units and lead time is 10 days. Assuming zero safety stock. ss=0, compute ROP. b) If average demand per day is 20 units.
Matching Supply with Demand: An Introduction to Operations Management Gérard Cachon ChristianTerwiesch All slides in this file are copyrighted by Gerard.
ISC/SCLC SPRING 2006 MEETING
Newsvendor Models & the Sport Obermeyer Case
The Probability of a Type II Error and the Power of the Test
1 Inventory Control with Stochastic Demand. 2  Week 1Introduction to Production Planning and Inventory Control  Week 2Inventory Control – Deterministic.
Business Statistics (BUSA 3101). Dr.Lari H. Arjomand Probability is area under curve! Normal Probability Distribution.
Accurate Response Technique that allows companies to match supply and supply in a uncertain environment.
Normal Distribution. Normal Distribution: Symmetric: Mean = Median = Mode.
OMG Operations Management Spring 1997 CLASS 13: Introduction to Logistics Harry Groenevelt.
Northern Illinois University Department of Technology Shun Takai
Aim: How do we test the difference between two means? HW#14: complete slide.
1 1 Slide Continuous Probability Distributions n The Uniform Distribution  a b   n The Normal Distribution n The Exponential Distribution.
Time Inventory Demand During Lead Time. LT ROP when demand during lead time is fixed.
13-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Course Code MGT 561 Supply Chain Management Book: Supply Chain Management Strategy,
Uop CJA 453 Week 4 DQ 3 What is the difference between forecasting and budgeting? Check this A+ tutorial guideline at
CJA 454 Week 4 DQ 3 NEW Check this A+ tutorial guideline at 454-NEW/CJA-454-Week-4-DQ-3-NEW What is the difference.
DBM 380 Week 5 DQ 2 Based on the Yew (2009) article, how does the information presented to decision makers affect the quality of their decisions? Check.
ECO 365 Week 1 DQ 1 What is the definition of price elasticity of demand? What is the relationship between price elasticity of demand and total revenue?
ECO 365 Week 1 DQ 4 What is the difference between a movement along and shift of the demand curve? What would cause the demand curve to shift and provide.
ECO 365 Week 1 DQ 5 a.) Identify a recent purchase in which the price of the product was an important consideration in the decision making process related.
ECO 365 Week 5 DQ 3 a.) What factors influence a firm's competitive strategies? b.) How does global competition affect the price elasticity of demand in.
EDL 535 Week 2 DQ 1 Discuss the powers of the local school board and how the decisions made affect education in your school. Check this A+ tutorial guideline.
BSHS 342 Week 1 DQ 2 Considering the three phases of prenatal development, describe the major milestones of each phase. Discuss one example of an environmental.
BIO 315 Week 2 DQ 1 What is intraspecific competition? What are some examples of how the limited quantity of resources affect intraspecific completion?
BSA 385 Week 5 DQ 1 How important is it to choose the right tools given the paradigm shift to user-facing, web-based application solutions? How has this.
continued on next slide
Chapter Six Normal Curves and Sampling Probability Distributions
AMBA 600 Innovative Education--snaptutorial.com
Sport Obermeyer.
                                                                                                                                                                                                                                                
Optimal Level of Product Availability Chapter 13 of Chopra
continued on next slide
continued on next slide
عمل الطالبة : هايدى محمد عبد المنعم حسين
Statistics and Science
NORMAL PROBABILITY DISTRIBUTIONS
How to Find Data Values (X) Given Specific Probabilities
The Normal Probability Distribution Summary
Using the Normal Distribution
Managing Flow Variability: Safety Inventory
Criteria for tests concerning standard deviations.
Homework: pg. 500 #41, 42, 47, )a. Mean is 31 seconds.
continued on next slide
Probability Question About an “individual” About a “statistic”
continued on next slide
Presentation transcript:

Sport Obermeyer

Sport Obermeyer’s Time Line and “Speculative” versus “Reactive” Production “Speculative” Production “Reactive” Production

Speculative Production: Overstock versus Stockout? Assume that Sport Obermeyer: is in the Speculative Production phase, forecasts that demand (D) for the Andy parka has a Normal Probability Distribution with a mean of 1000 and a standard deviation of 250, and has decided that the Andy parka’s Speculative Production should be Q=750. Pr{Stockout}=Pr{D>Q} =0.841 Pr{Overstock}=Pr{D<Q} =0.159 750 Q During the Speculative Production, Sport Obermeyer should be more concerned about

Speculative Production: Guidelines for Choosing a Parka to Produce In this slide and the next 4 slides, we will assume that Sport Obermeyer is in the Speculative Production phase and must decide whether to produce the Andy parka or the Peter parka. We will also assume that a parka’s demand has a Normal Probability Distribution. We will investigate how this decision is affected by: the parka’s standard deviation of demand, the parka’s mean demand, and the parka’s unit cost of production.

The Effect of a Parka’s Standard Deviation of Demand Assume that Andy and Peter have the same unit cost of production and the same mean demand of 1000, but that Andy’s demand has a standard deviation of 100 while Peter’s demand has a standard deviation of 200. Pr{Overstock}=Pr{D<Q} = Area to Left of Q Q During Speculative Production,

The Effect of a Parka’s Mean Demand Assume that Andy and Peter have the same unit cost of production and the same standard deviation for demand of 200, but that Andy’s demand has a mean of 1000 while Peter’s demand has a mean of 1200. Pr{Overstock}=Pr{D<Q} = Area to Left of Q Q During Speculative Production,

The Effect of a Parka’s Unit Cost of Production Assume that Andy and Peter have the same mean demand of 1000 and the same standard deviation for demand of 1000, but that Andy’s demand has unit cost of production of $10 while Peter’s demand has a unit cost of production of $20. During Speculative Production,

Speculative Production: Summary of Guidelines for Choosing a Parka to Produce In the previous 3 slides, we have seen that a parka is a better candidate for Speculative Production if: It has a relatively ______ standard deviation of demand. It has relatively ______ mean demand. It has a relatively ______ unit cost of production.

Speculative Production: Equalizing over 2 Parkas the Probability of an Overstock Assume that Andy and Peter have the same unit cost of production but that Andy’s demand has a mean of 1000 & standard deviation of 250, Peter’s demand has a mean of 2500 & standard deviation of 500. Q=1000 - k250 Q=2500 – k500 QUESTION: How can we set the production quantities so that Pr{Overstock of Andy} = Pr{Overstock for Peter}?

Solving Wally’s Sample Problem (on page 8 of the Case) Using the concept on the previous slide and the sample data in Exhibit 10, we will determine for Wally the order quantity for each style during Speculative Production. To simply, we will assume that: all 10 styles in the sample problem are made in Hong Kong, no style has a minimum order quantity, all styles have the same unit cost of production, and total Speculative Production must be about 10,000 units.

Solving Wally’s Sample Problem (with k=0) Go to Excel file. Too much!

Solving Wally’s Sample Problem (with k=2) Too little!

Solving Wally’s Sample Problem (with k=1) Too much!

Solving Wally’s Sample Problem (with k=1.0608) Just right!

The Effect of Minimum Order Quantities Ideally, during Speculative Production, we want to order a specific quantity of a parka style, and then, during Reactive Production, we want to “fine tune” the parka’s remaining supply by ordering as few or as many as the indicated by the revised forecast after Las Vegas. However, a large minimum order quantity for a particular style of parka forces us to order either many parkas or none. Thus, a minimum order quantity significantly reduces the ability to “fine tune” during Reactive Production.

Minimum Order Quantities (continued) Let “Mean” denote a parka’s mean demand. Let “minQ” denote the parka’s minimum order quantity. Consider the following three cases: During Speculative Production, which of the above three cases are “safe” to order, and which are “risky”? Case 1: Case 2: Case 3:

Recommendations to Wally RECOMMENDATION #1. Improve the demand forecasts made internally by the Buying Committee in November just before Speculative Production. Instead of using just a simple average of the individual forecasts made by Laura, Carolyn, Greg, Wendy, Tom, & Wally, use a weighted average, with the weights reflecting past accuracy.

Recommendations to Wally (continued) RECOMMENDATION #2. Obtain market feedback earlier than Las Vegas, thereby converting some Speculative Production to Reactive Production. Sport Obermeyer can invite selected retailers to come in January to Aspen for an all-expenses-paid “Early Order Weekend”, where there is time for a”sneak preview” of the new line, some recreational skiing and socializing, and then the early placement of orders at a discount. To maximize the value of the market feedback, Sport Obermeyer’s “guest list” should include both large and small retailers and both urban and resort retailers.

Recommendations to Wally (continued) RECOMMENDATION #3. Decrease lead times for both raw materials and finished goods, thereby allowing more time to utilize existing capacity. Since the business strategy should emphasize Dependability more than Cost, lead-times can be reduced using some or all of the following methods: Choose suppliers of raw materials more on the basis of D than C. Expedite orders through information sharing with suppliers. Expedite shipments using faster (but more expensive) shippers. Establish some local (but more expensive) production capacity for “last minute” production.

Recommendations to Wally (continued) RECOMMENDATION #3 (continued). Other ways to reduce lead times include: From the items with long lead times, increase the amount of “safety stock” inventory for those items that are inexpensive (e.g., buttons) and/or shared by many parkas (e.g., black fabric). Simplify the parkas’ designs so that they can share as many components as possible. For example, are 100,000 varieties of zippers really necessary?

Recommendations to Wally (continued) RECOMMENDATION #4. Increase production capacity by: Using more subcontractors, Using more overtime in China, and/or Exploring an alliance with a swimwear manufacturer who can “supply” excess capacity when Sport Obermeyer needs it and “consume” capacity when Sport Obermeyer has excess capacity.

Recommendations to Wally (continued) RECOMMENDATION #5. Decrease minimum order quantities, thereby improving the ability to “fine tune” during Reactive Production. Minimum order quantities occur because there are long “set-up times” when switching from the production of one style of parka to another, thereby making it uneconomical to have “short runs”. Sport Obermeyer can decrease the minimum order quantities by providing incentives to its suppliers to have more flexible production lines. This increased flexibility can come from: Improved process design (e.g., a cellular production system). Improved equipment (e.g., more flexible cutting machines).

Sport Obermeyer’s Relationship with Obersport In this global supply chain, Sport Obermeyer operates in the US and specializes in the demand side by coordinating activities such as monitoring fashion trends, designing the parkas, and selling the parkas by entering into relationships with retailers. Obersport operates in Hong Kong and China and specializes in the supply side by coordinating activities such as procuring fabric and components (e.g., zippers) and arranging for production using either independent subcontractors or factories of Alpine (a company owned by Obersport’s managing director).

Sport Obermeyer’s Relationship with Obersport (continued) Global supply chains are frequently composed of different companies, with each company having a a different geographical location, a different knowledge set a different skill set, and/or a different set of business relationships. Sport Obermeyer should NOT eliminate its business relationship with Obersport. Instead, it should retain its relationship and seek to improve the coordination between Sport Obermeyer’s demand-side activities and Obersport’s supply-side activities.