LARP Phase II Secondary Rotatable Collimator

Slides:



Advertisements
Similar presentations
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
Advertisements

Measuring Polarizability with an Atom Interferometer Melissa Revelle.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
Critical Points Layouts For Storage Ring and Beamlines Ken Chow March 14, 2014.
MECHANICAL DESIGN OF TCSP COLLIMATORS Secondary Collimators Embedding BPMs L. GENTINI, A. Dallocchio, A. Bertarelli, F. Carra, M. Garlasche.
LHC Phase II Collimator teleconference - 4 March 2008LHC Rotatable Phase II Collimators 1 beam LARP Phase II collimator Progress and Plans 4 March 2008.
Introduction to collimators Integration of BPM Mechanical design Electrical design Processing Simulations Results Conclusions & Outlook.
1 LARP Phase II Secondary Rotatable Collimator Evolution of design changes 3 rd March, 2010.
LHC Phase II Collimator Compact jaw simulations New FLUKA => ANSYS mapping scheme New 136mm x 950mm jaw –60cm primary collimator –Helical cooling channel.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 16 May 2006 No 1 /22 LARP Phase II Secondary Collimator RC1 Collimator Test Program Revised 5/15/06.
SLAC RC Status Report 30 August 2010 LHC Collimation Working Group Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
LARP LHC PHASE II COLL RC1 - S. Lundgren 1 April 2009 No 1 /6n LARP Phase II Secondary Collimator RC-1 Mechanical Design Review 01/04/09.
Due to the oscillating charge in the antenna Along this line one does not observe any acceleration Radiation from a dipole-antenna To get the dimension.
Simulation of trapped modes in LHC collimator A.Grudiev.
2.1 GHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL June 15, 2015 LEReC Warm Cavity Review Meeting  June 15, 2015.
Trapped Modes in LHC Collimator (II) Liling Xiao Advanced Computations Department SLAC National Accelerator Laboratory.
Review of Mechanical Movement and Motorization for LHC Collimators The LHC Collimation project LHC Collimators for Phase 1 Alessandro Bertarelli.
Task List for Phase II Rotatable Collimator Project at SLAC 30 January 2007 CERN/LARP Video Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
Collimation Overview 28 October 2008 LARP CM11, Fermilab Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program 1)Short Status.
LARP LHC PHASE II SECONDARY COLLIMATOR CD1 REVIEW. - E. Doyle 15 Dec /25 LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 Prototype Engineering.
LARP Coll. Video-conf. May 12, '05Phase II Collimator Engineering - E. Doyle1/20 Adapting the NLC Consumable Collimator to LHC Phase II Secondary Collimation.
LARP Rotatable Collimators 19 June 2006 ILC R&D Status Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 1 /12 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
Recent Energy Deposition Simulations TCSM-A6L7 L. Keller LARP Video Mtg. 02 Oct
Rotated by ≈ 45 degrees Beam Diaphragm Many PMT’s Light condensor Mirror geometry:
Update on the TDI impedance simulations and RF heating for HL- LHC beams Alexej Grudiev on behalf of the impedance team TDI re-design meeting 30/10/2012.
LARP LHC PHASE II COLL RC1 - S. Lundgren 21 Sep 2009 No 1/17 LARP Phase II Secondary Collimator RC-1 Collimator Development Status and Outlook Revised.
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
LARP Phase II Secondary Collimator Status Report SLAC ILC R&D Summary Meeting 24 April 2006 T. Markiewicz/SLAC.
The GMT Project The Giant Magellan Telescope (GMT)
LARP Phase II Secondary Collimator RC1, ETC - Status 4/10/06
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 RC1 Construction and Test Plan LARP LHC PHASE II COLL REVIEW – RC1.
LARP Phase II Secondary Collimator RC-1
Cutting Sample Simultaneous 5axis Cutting modes are developed at Version 5. “Undercut Z-level Finishing” creates tool paths at undercut part. “Swarf cutting”
Recommendations of 12/16/05 review committee & SLAC response
LARP Phase II Secondary Rotatable Collimator
LARP Collimation – Engineering & Analysis
23 April 2012 Tom Markiewicz/SLAC
¼ meshed models for Omega3P calculations
LARP Phase II Secondary Collimator RC1
Discussion on the TDI impedance specifications
Simulation of Monopole modes trapped in LHC collimator
Simulation of trapped modes in LHC collimator
Current Design and Short Status
LARP Phase II Secondary Rotatable Collimator
Bearings.
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Collimator RC-1
LARP Phase II Secondary Collimator RC-1
RESISTIVE HEAT LOAD FOR THE TDI = LHC injection beam stopper
LARP Phase II Secondary Collimator RC-0 and RC-1
LARP Rotatable Collimators for LHC Phase II Collimation
LARP Phase II Secondary Collimator RC-1
Rotation: all points in the original figure rotate, or turn, an identical number of degrees around a fixed point.
Simulation of Monopole modes trapped in LHC collimator
Possible Methods for Reducing the Trapped Mode Effect in the SLAC Rotatable Collimator for the LHC Phase II Upgrade Liling Xiao 1.
Bessel Color Images.
Engineering Update E. Doyle 5/16/06
LARP Phase II Secondary Collimator RC-0 and RC-1
Simulation of Emittance
EM Simulation of wakes in BSRT beampipe with extraction mirror
Phase II Collimator, Alternative Jaw Simulations
Presentation transcript:

LARP Phase II Secondary Rotatable Collimator 5 min. Status Report 15th February, 2010

First Jaw (RC-0) Full jaw and bearings on support ready for CMM then installation First jaw bearings and supports finished and installed ~300 1 mm Rhodium coated SS balls for image current ~1001 mm ceramic balls for load support

CMM CMM to give: Surface profile for each facet confirm within 25 micron surface flatness Find axis of rotation and concentricity of each facet Gravity sag (Should be very small) Second jaw (RC-1): Bearings being installed right now then goes to CMM

Trapped Modes Update Liling Xiao is finishing her studies of trapped modes with a more accurate model (Takes longer time to simulate)

Lowest Longitudinal Trapped Modes E-fields Original Current Jaws are fully inserted with gap=2mm Narrow EM foils as well as large distance between EM foils cause more Ez fields existing in the end regions of the vacuum tank along the beam path. Liling Xiao, Dec.14, 2009