Multigrade,………………… Multivariable,……. Cusum…… Quality Control

Slides:



Advertisements
Similar presentations
Testing Relational Database
Advertisements

Introductory Mathematics & Statistics for Business
Configuration management
Configuration management
1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc.
Statistical Control Charts
WORK AND PENSIONS SELECT COMMITTEE: Labour market seminar: 26 TH February: ‘Trends in part-time working and short-term employment contracts and the impacts.
Customer Lifetime Value – Direct Wines Customer Lifetime Value TFM&A 2014 David Lockwood: Direct Wines Terry Hogan: Golden Orb.
John Wiley & Sons, Inc. Prepared by Karleen Nordquist.. The College of St. Benedict... and St. John’s University.... Managerial Accounting Weygandt, Kieso,
BPT2423 – STATISTICAL PROCESS CONTROL
Chapter 18 Introduction to Quality
1 Doing Statistics for Business Doing Statistics for Business Data, Inference, and Decision Making Marilyn K. Pelosi Theresa M. Sandifer Chapter 5 Analyzing.
Chapter 8 Estimating Single Population Parameters
Software Quality Control Methods. Introduction Quality control methods have received a world wide surge of interest within the past couple of decades.
Basic Business Statistics, 10e © 2006 Prentice-Hall, Inc. Chap 8-1 Chapter 8 Confidence Interval Estimation Basic Business Statistics 10 th Edition.
Chapter 13 Forecasting.
Control Charts for Variables
Basic Business Statistics, 10e © 2006 Prentice-Hall, Inc. Chap 9-1 Chapter 9 Fundamentals of Hypothesis Testing: One-Sample Tests Basic Business Statistics.
19 Costing Systems: Process Costing Principles of Accounting 12e
Statistics for Managers Using Microsoft® Excel 5th Edition
Chapter 9 Numerical Integration Numerical Integration Application: Normal Distributions Copyright © The McGraw-Hill Companies, Inc. Permission required.
Statistics for Managers Using Microsoft Excel, 4e © 2004 Prentice-Hall, Inc. Chap 7-1 Chapter 7 Confidence Interval Estimation Statistics for Managers.
Example of Simple and Multiple Regression
Quality Assessment 2 Quality Control.
Chapter 13: Inference in Regression
Business Statistics, A First Course (4e) © 2006 Prentice-Hall, Inc. Chap 9-1 Chapter 9 Fundamentals of Hypothesis Testing: One-Sample Tests Business Statistics,
Critical Analysis. Key Ideas When evaluating claims based on statistical studies, you must assess the methods used for collecting and analysing the data.
Demand Management and Forecasting
1 Statistical Analysis - Graphical Techniques Dr. Jerrell T. Stracener, SAE Fellow Leadership in Engineering EMIS 7370/5370 STAT 5340 : PROBABILITY AND.
May 06th, Chapter - 7 INFORMATION PRESENTATION 7.1 Statistical analysis 7.2 Presentation of data 7.3 Averages 7.4 Index numbers 7.5 Dispersion from.
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Six Cost-Volume-Profit Relationships.
KING FAHD UNIVERSITY OF PETROLEUM & MINERALS DHAHRAN, SAUDI ARABIA ARE-512 Life Cycle Costing – Cost Data Bank For By G. C. SOFAT S.K. TYAGI Presented.
Basic Business Statistics, 11e © 2009 Prentice-Hall, Inc. Chap 8-1 Chapter 8 Confidence Interval Estimation Basic Business Statistics 11 th Edition.
Analysis of Variance ( ANOVA )
Basic Business Statistics, 10e © 2006 Prentice-Hall, Inc. Chap 8-1 Chapter 8 Confidence Interval Estimation Basic Business Statistics 11 th Edition.
Introduction to Statistical Quality Control, 4th Edition
The Supply Curve and the Behavior of Firms
Copyright © 2010, 2007, 2004 Pearson Education, Inc. All Rights Reserved Lecture Slides Elementary Statistics Eleventh Edition and the Triola.
The Demand Side: Consumption & Saving. Created By: Reem M. Al-Hajji.
Quality Control Lecture 5
The Examination of Residuals. Examination of Residuals The fitting of models to data is done using an iterative approach. The first step is to fit a simple.
1 DSCI 3023 Forecasting Plays an important role in many industries –marketing –financial planning –production control Forecasts are not to be thought of.
Regulating Concrete Quality Ken Day, Consultant Melbourne, Australia.
Statistical analysis Outline that error bars are a graphical representation of the variability of data. The knowledge that any individual measurement.
Time series Model assessment. Tourist arrivals to NZ Period is quarterly.
Statistics for Managers Using Microsoft Excel, 4e © 2004 Prentice-Hall, Inc. Chap 8-1 Chapter 8 Fundamentals of Hypothesis Testing: One-Sample Tests Statistics.
Lecture 9 Chap 9-1 Chapter 2b Fundamentals of Hypothesis Testing: One-Sample Tests.
© Copyright McGraw-Hill Correlation and Regression CHAPTER 10.
Discussion of time series and panel models
Chapter 10 Hashing. The search time of each algorithm depend on the number n of elements of the collection S of the data. A searching technique called.
DTC Quantitative Methods Bivariate Analysis: t-tests and Analysis of Variance (ANOVA) Thursday 14 th February 2013.
Statistics for Managers Using Microsoft Excel, 5e © 2008 Pearson Prentice-Hall, Inc.Chap 8-1 Statistics for Managers Using Microsoft® Excel 5th Edition.
Week 6. Statistics etc. GRS LX 865 Topics in Linguistics.
CSE SW Metrics and Quality Engineering Copyright © , Dennis J. Frailey, All Rights Reserved CSE8314M13 8/20/2001Slide 1 SMU CSE 8314 /
Copyright , Dennis J. Frailey CSE Software Measurement and Quality Engineering CSE8314 M00 - Version 7.09 SMU CSE 8314 Software Measurement.
PROCESS COSTING CHAPTER - 1. Chapter outcomes  Meaning and nature of process costing  Application of process costing  Fundamental principles of process.
Coping with Variability of Input Materials for Readymix Concrete Ken W. Day Consultant, Melbourne, Australia.
1 Statistical Analysis - Graphical Techniques Dr. Jerrell T. Stracener, SAE Fellow Leadership in Engineering EMIS 7370/5370 STAT 5340 : PROBABILITY AND.
ECE DIGITAL LOGIC LECTURE 2: DIGITAL COMPUTER AND NUMBER SYSTEMS Assistant Prof. Fareena Saqib Florida Institute of Technology Fall 2016, 01/14/2016.
1 Outcome Measures for School Evaluation Coalition for Excellence in Science and Math Education.
Coping with Variability of Input Materials for Readymix Concrete Ken W. Day Consultant, Melbourne, Australia.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 3 Forecasting.
Bidding Strategies. Outline of Presentation Markup Expected Profit Cost of Construction Maximizing Expected Profit Case 1: Single Known Competitor Case.
Forecasting. Model with indicator variables The choice of a forecasting technique depends on the components identified in the time series. The techniques.
Welcome to MM305 Unit 5 Seminar Dr. Bob Forecasting.
Stats Methods at IC Lecture 3: Regression.
Bidding Strategies.
Process Capability.
Presumptions Subgroups (samples) of data are formed.
Forecasting Plays an important role in many industries
Presentation transcript:

Multigrade,………………… Multivariable,……. Cusum…… Quality Control Ken W Day

Multigrade, Multivariable, Cusum QC In October last year I gave a paper ‘Concrete in the 22nd Century’ to the Concrete Institute of Australia Biennial, trying to look as far as possible into the future. Now however I have chosen to look into the past because my largest contribution to concrete technology is evidently still not universally understood.

Multigrade, Multivariable, Cusum QC It took 25 years from the early 1950s to the late 1970s to perfect my technique for analysing concrete compression test data. In the 25 years since then, the technique has spread widely as part of the ConAd QC program but still not fully incorporated in any national or international code of practice. So I want to take this opportunity to present its exact basic concepts.

Multigrade, Multivariable, Cusum QC I need to present each of the three major components: Multigrade, Multivariable Cusum and to add to them one further item: Prediction from early age tests. I will take the three major components in reverse order:

Cusum cumulative sum analysis I did not invent cusum, It was developed in the UK chemical industry (Woodward and Goldsmith, 1964) first used for concrete QC in the UK in the 1970s (Testing Services, 1970). I started to apply it some six months later (independently of the Testing Services development).

Cusum cumulative sum analysis Cusum involves subtracting a target value from each result and maintaining a cumulative sum of the remainders. Its main value is that it detects a change in a string of results about three times as quickly as a normal Shewhart Chart. Detection can be by mathematical analysis of the string of cumulative sums, or by graphing the cumulative sums. The graphical method is preferable because it is easier to detect and eliminate false changes due to testing error or abnormal circumstances.

Cusum (cumulative sum analysis) My major contribution is to use the continuously updated current average of a variable as the target. This focuses the cusum on detection of change rather than adherence to a selected target. It also has huge significance for the ease of combining very large numbers of grades of concrete in a single cusum analysis.

Cusum chart

Use of V mask to detect change

Cusum graph exhibiting false change

Multivariable Multivariable relates to including graphs of other variables such as: density, workability, temperature, tests on constituent materials such as cement strength and sand grading, also average pair difference of 28day results (to detect any deterioration in testing quality) all on the same sheet as concrete strength.

Multivariable I started to do this in my first year in the concrete business (1952) but the idea still does not seem to have been fully accepted by the UK QSRMC (Quality Scheme for Ready Mix Concrete), even though I have presented papers there on two occasions. The concept is that changes in concrete strength will be mirrored in, and so confirmed and explained by, changes in one or more of the other variables.

Multigrade Multigrade relates to combining the results of several (or many) grades of concrete in a single analysis. If done effectively, this gives an equivalent effect to increasing the frequency of testing many times over.

Multigrade EN206, the European quality scheme, does this to a limited extent but makes hard work of it and has to limit it to a few similar grades of concrete. EN206 combines grades by adjusting or converting the results of other grades so that they can be analysed as though from a selected control grade. This requires initial and continued effort to set up and continually adjust the conversion process to be fully effective.

Multigrade I have been happily applying my version to combining the results from hundreds of grades of widely different character with no human effort required (the computer does it all) for more than 20 years. My technique is to cusum departures from the various current average values as though these were all from the same average value. While I was initially dubious of this, I have found that it works beautifully for strengths of 20MPa or less to strengths of 100MPa or more, and including normal dense and structural lightweight concrete in the same analysis.

Multigrade, Multivarible Cusum

Early Age Prediction Normally ‘early age’ means something of the order of 3 to 7days My contribution for normal results has been to recognize that a more useful prediction is obtained by adding the average gain to the early result than by assuming a percentage increase. This is because the early age result tends to be of a single specimen and to be subject to more than usual error. Applying a percentage increase multiplies the effect of any error.

The free QC program

Free Programs I should warn you that the free programs are not likely to remain free permanently (other than on a demonstration basis) owing to a recent partnership between Contek, Shilstone and myself:

Early Age Prediction For very early results it is necessary to have a temperature history record and to express the age as an Arrhenius Equivalent Age (EA) rather than a physical age. The concept (and a competing but less accurate concept of temperature x time maturity) is well known but the usual technique is to construct a strength v maturity (or EA) graph, measure the maturity (or EA), and read off the strength.

Early Age Prediction Construction of the calibration graph requires substantial effort A more serious fault is that this technique assumes that the concrete is the same as that used to construct the graph and so cannot react to changes in concrete quality and cannot be used for QC.

Early Age Prediction I have devised a simple program that continuously and automatically feeds back and corrects the Arrhenius constants so that predictions of 28day strength (and any other desired age) based on the actual concrete in question can be obtained within a few hours. Such results can be used for QC where the additional expense of temperature monitoring is considered justified

Combined Effect The real power of my overall system lies in the way that these separate elements combine together. It is the way I do cusum that enables such widespread multigrading, the use of cusum that links multivariables, and the use of multivariables to confirm and explain the detection of change. these features enable the detection and cause of change to be established several weeks earlier than most (all?) other control systems.

Combined Effect The earlier detection and trend rectification itself reduces the overall variability of the concrete being produced – and I have demonstrated that the number of results required to detect a given change is directly proportional to their basic variability.

Availability of the Technique The technique was made substantially available as a Lotus spreadsheet in a series of 10 articles appearing bi-monthly in Concrete International in 1988-89. Apart from this it has only been available as part of the ConAd computer program, marketed by the author’s company, Concrete Advice Pty. Ltd. in the 1990s, and now, since the sale of that company, by Command Alkon Inc.

Availability of the Technique To enable the basic technique to become a standard item, available to all, there is now a free program available on my website www.kenday.id.au. This program falls far short of ConAd in many respects but it does enable all the features presented here to be employed, with the exception that the ‘multivariables’ available are limited to strength, density, slump, and temperature and only eight cusum graphs can be drawn.

Specification of Concrete While not the subject of the current address, a few words on this subject may be helpful. Although it has taken 50 years in some cases, it seems that the whole world is coming to accept a view I have been presenting since the early 1950s. In 1958 I wrote: ‘The only rational objective for any but 100% testing is not to discover and reject faulty products but to ascertain the minimum quality level of the production’.

Specification of Concrete The article went on to assert that: ‘the only really fair and effective basis for quality regulation is the imposition of a cash penalty for marginally defective concrete based on a statistical analysis of test data’. I am still of that opinion, even though (so far!) it does not appear to be shared by anyone else in the world. – maybe another 50 years?

Specification of Concrete An effective control system must have two quite separate and to some extent opposing features. One is to form a very accurate view of the mean strength and variability of the concrete supplied to date (no hurry). The other is to detect as quickly as possible when the quality of the concrete being supplied changes (no requirement for accuracy or infallibility). Any attempt to combine the two is likely to fail to accomplish either.

Summary and Conclusion 1) Test data (including specimen density) should be entered in the system on the day it is obtained and visually assessed daily using automatically generated multigrade, multivariable, cusum graphs.

Summary and Conclusion 2) Cusum analyses should use the constantly updated average values of all variables as a target rather than a specified target.

Summary and Conclusion 3) Data should ‘multigraded’ by cusuming these differences as though from the same mean rather than transforming results to a control grade.

Summary and Conclusion 4) Data should include strength at 7days or earlier transformed into a 28day strength prediction by adding the current average gain. Prediction should NOT involve any assumption that a low early age result is likely to also show a lower subsequent gain.

Summary and Conclusion 5) The daily assessment should include at least the first few rows of a table ranking all grades in order of departure of current and predicted mean strengths from their target values. 6) Cusums should include average pair difference of 28day results as an indication of testing quality.