DTE Gas Company Leak Management Plan

Slides:



Advertisements
Similar presentations
Infrastructure Challenges Eric T. Belle Manager, Field Engineering Columbia Gas of Kentucky Columbia Gas of Ohio Governor's Conference on Energy and The.
Advertisements

Rate Plan. Value Story When asked, our customers identify the following topics as ways MidAmerican Energy provides value – Emergency Response.
CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES.
Pipeline Replacement Programs Presentation By Frank Radigan Hudson River Energy Group June 26, 2012.
You Don’t Always Have To Be Told What To Do Christina Sames Vice President Operations and Engineering November 2011.
Repairing Our Cities’ Aging Pipelines Mayors’ Council on Pipeline Safety Conference May 2015 Kim Glas – Executive Director.
Take A Load Off, Texas SM is provided by Oncor Electric Delivery LLC as part of the company’s commitment to reduce energy consumption and demand. Frontier.
PLASTIC vs. STEEL.
NECPUC Gas panel Susan Fleck National Grid June 17, 2014.
Innovative Rates, Non-Volumetric Rates, and Tracking Mechanisms: Current List As of June 2015 AGA represents natural gas utilities—the folks that deliver.
SHRIMP: Model Distribution Integrity Management Plan Development Tool John Erickson, PE American Public Gas Association.
Western Regional Gas Conference August 25, 2009 Distribution Integrity Management Programs (DIMP) & SHRIMP.
National Study of Low Income Energy Programs Lessons for Connecticut January 29, 2008 David Carroll - APPRISE Roger Colton – Fisher, Sheehan, and Colton.
Technical Advisory Committee December 2012 Fitness for Service.
Asset Management in Action: Use of a Triple Bottom Line Approach to Prioritize Capital Improvement Needs Richard Cuthbert R. W. Beck, Inc.
Distribution Integrity Management – What To Expect John Erickson, PE American Public Gas Association Western Regional Gas Conference.
Public Water and Sewer Affordability Meg Neafsey American Water April 30, 2015.
Paper # LOS ANGELES COUNTY PRIORITIZATION OF SEWER REHABILITATION PROJECTS Fernando Villaluna, P.E. 1.
Aging Infrastructure Management and Challenges Sue Fleck Vice President Pipeline Safety Trust “Getting to Zero’ Conference 2011.
Pipeline Performance Measures Alan Mayberry New Orleans, Louisiana Pipeline Safety Trust Annual Conference
Alternative Rate Structure Paul Smith Vice President, Rates Duke Energy Ohio June 20, 2006.
Nick Fish, Commissioner | Michael Stuhr, P.E., Director Portland Water Bureau May 3, 2016 Briefing for the Portland Utility Board Asset Management at the.
East Region Source: J.D. Power and Associates 2004 Gas Utility Residential Customer Satisfaction Study SM Charts and graphs extracted from this press release.
Smart Grid Tariff Changes
2017 Mid Year Meeting Denver, CO
National Study of Low Income Energy Programs Lessons for Connecticut
Alex Glenn Duke Energy Florida President
Innovative Rates, Non-Volumetric Rates, and Tracking Mechanisms: Current List As of December 2016 AGA represents natural gas utilities—the folks that deliver.
Platelet outdates Kathryn Webert
Leading With Safety Mike Huwar, President
Natural Gas: Market Trends in Supply and Consumption
Water Loss Audit Findings (FY 13-14)
Smart Modernization: Infrastructure Replacement & Expansion Update
Pipeline Safety Issues
Mobile workforce management solution
Reduce Distribution System Pressure
Safety Improvement Concepts
Workforce Planning and Forecasting
AGA Workshop Resource Management and Work Forecasting
AGA Workshop Resource Management and Work Forecasting
Gas Utility Operations Best Practices Program
2016 Mutual Aid Drill August 30 - September 1, 2016
Leak Management Best Practices
BACKGROUND Green Building Act Energy Benchmarking and DC SEU Energy Efficiency Financing Act Distributed Generation Amendment Act Community Renewables.
Natural Gas is Moving Forward
NiSource Gas Distribution
Gas Utility Operations Best Practices Program
Understanding Updates to the EPA Inventory of Greenhouse Gas Emissions from Natural Gas Systems Richard Meyer Managing Director, Energy Analysis August.
AGA Distribution Best Practices Program Key Performance Metrics
Benchmarking Topic Best Practices Executive Roundtable Presentation
Key Performance Indicators
Scheduling Gas Maintenance & Construction Resources AGA Workshop – Resource Management & Work Forecasting Artie Georgacopoulos Director - Resource Planning.
Current Trends in Retail Service Quality
Ohio – Electricity OCTOBER 2018 MARKET INFORMATION AEP Ohio
Ohio – Natural Gas SEPTEMBER 2017 MARKET INFORMATION
Emergency Response Best Practices Executive Roundtable Presentation
Bar Coding/Asset Tracking Implementation
DTE Gas Benchmarking Process and Projects
AGA Operations Conference
Ohio – Electricity & Natural Gas
Ohio – Electricity & Natural Gas
Ohio – Natural Gas JULY 2017 MARKET INFORMATION
Ohio – Natural Gas OCTOBER 2017 MARKET INFORMATION
Understanding Updates to the EPA Inventory of Greenhouse Gas Emissions from Natural Gas Systems Gina DeFrancesco Clean Energy Analyst | May 2019.
ECONOMIC DEVELOPMENT TOOL
Ohio – Natural Gas AUGUST 2017 MARKET INFORMATION
Ohio – Electricity SEPTEMBER 2019 MARKET INFORMATION AEP Ohio
Alex Glenn President.
Presentation transcript:

DTE Gas Company Leak Management Plan American Gas Association October 14, 2014

Our approach to Gas Leaks: ensure the safety of people first and then property PRIORITIZING LEAK RESPONSE P0 (“P Zero”) = Immediate Response P1 (“P One”) = Immediate Response in the absence of a P0 leak. P2 (“P Two”) = Request for Distribution Prospect – secondary response following initial leak response by others

DTE Gas Company Leak Remediation Plan Background In Q1 2010 DTE Gas developed a leak remediation plan targeting a 1st Quartile leak inventory by year-end 2013 The plan was executed under the following constraints: Existing workforce availability (a combination of internal workforce planning and contractors) O&M and Capital budgets An increasing rate of incoming leaks due to the deterioration of our cast iron main infrastructure (8% CAGR between 2010 and 2014) A critical component of this plan was a creation of a team (Infrastructure Construction Management – ICM) whose sole focus is leak repair

Incoming Leaks 5-Year CAGR: 8% In Q1 2010 DTE Gas developed a leak remediation plan targeting a 1st Quartile leak inventory by year- end 2013 and Top Decile by 2019 2010 – 2015 leak trend Incoming Leaks 5-Year CAGR: 8% -19,765 -13,677 -18,543 -19,541 -12,727 -17,719 Inventory coming Repaired Inventory coming Repaired Inventory coming Repaired Inventory coming Repaired Inventory coming Repaired Inventory (est.) (est.) Inventory 2010 2011 2012 2013 2014 (8+4) 2015-19 Year End Leaks / Mile 0.20 0.24 0.11 0.07 0.08 0.05 Quartile Q3 Q3 Q3 Q1 Q2 D1

In 2014 due to the depth of the frost line we conducted a second cast iron survey which drove a significant increase of incoming leaks  Second Cast Iron Survey

Continuous Improvement (CI) Efforts Combined Leak Survey Cast Iron Survey Residential & Business Districts There are a high quantity of Main Repairs that exist on the leak inventory. DTE Gas Company has implemented the following improvements to reduce job standard times and increase the number of repairs completed throughout the year Multiple "Leaks" were grouped together by area and type, enabling more efficient dispatching Main Repairs are being scheduled for completion by Distribution crews that will not be interrupted by emergency work DTE Gas Company has committed to renew and/or abandon over 76 miles of Main in 2014

Main Leak Repair Cost per Repair ($) We keep monitoring our cost performance relative to our peers to ensure our leak repair work is performed efficiently… Main Leak Repair Cost per Repair ($) $6,700 $6,778 $5,060 $5,109 $4,890 $4,894 $4,639 $4,086 $3,930 $3,132 $3,173 $3,247 $2,598 $2,671 $2,679 $2,762 $1,772 $1,510 $498 $514 $309 $178 DTE GasDTE Gas Source: PSE&G Benchmarking

Emergency Response Time (minutes) and % Responses within 1 Hour …and we monitor also response time to ensure we perform in line with the rest of the industry Emergency Response Time (minutes) and % Responses within 1 Hour Emergency Reposnse Time % responses within 1 hour DTE GasDTE Gas Source: AGA Benchmarking

DTE Gas Leak Remediation Plan going forward: with our leak inventory under control, our plan now is to address our structural disadvantage With 22% of DTE Gas main unprotected (3rd Quartile in our Peer Set) we have a structural disadvantage Due to this structural disadvantage, we are among the utilities with the highest volume of leaks on main repaired annually In 2014 we have developed a plan to accelerate – effective 2016 – our Main Renewal Program (MRP): Target a 25-year replacement pace of our ~4,000 miles of unprotected main (down from 50) Mitigate the acceleration of incoming leaks driven by the degradation of our cast iron main Develop a mid-high pressure system to better serve our customers

With 22% of DTE Gas main unprotected (3rd Quartile in our Peer Set) we have a structural disadvantage DTE Gas Miles of Main by Type (2013 data) Best Operated Peer Set Comparison (% of unprotected main in 2013) 18,971 Duke OH Kansas Gas 2,419 (13%) 1st Quartile Cast Iron CMS 21.5% unprotected Indiana Gas (Coated + Bare) 1,661 (9%) NJ Natural Gas Washington Gas Laclede (Bare + Coated) 5,087 (27%) Niagara Mohawk 2nd Quartile Vectren Columbia Gas OH PECO Energy BGE 79% protected DTE Gas 3rd Quartile National Fuel Gas 9,796 (52%) Plastic Columbia Gas PA PSE&G Dominion East Ohio 4th Quartile Peoples Natural Gas Peoples Gas Light & Coke Keyspan Miles of Main

2013 Main Leaks Repaired (Leaks per mile of Main) Due to this structural disadvantage, we are among the utilities with the highest volume of leaks on main repaired annually 2013 Main Leaks Repaired (Leaks per mile of Main) DTE GasDTE Gas Source: AGA Benchmarking

Miles of Unprotected System Replacement Pace (Years) In 2014 we have developed a plan to accelerate – effective 2016 – our Main Renewal Program to be on a pace similar to the rest of the industry DTE Gas Peer Set: 2013 comparison of unprotected infrastructure vs. pace of replacement National Grid Miles of Unprotected System Significant amount of unprotected main, faster pace East Ohio Gas PSE&G DTE (160 miles/year - 2016) DTE (80 miles/year - 2014) Columbia of OH ConEd Columbia of PA Peoples Natural Gas PSC of CO Peoples Gas  CMS BG&E Vectren OH NSTAR Gas Kansas Gas PECO Energy Duke OH NJ Natural Gas Laclede  5 10 15 20 25 30 35 40 45 50 55 140 145 Replacement Pace (Years) Source: DOT / PHMSA report