2003 test beam with 25 ns bunched muons

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

RAL 27 April 2006The beta-beam task, EURISOL1 Status of the beta-beam study Mats Lindroos on behalf of the EURISOL beta-beam task.
Ulrich RaichLinac-4 instrumentation day May 2007 Longitudinal Bunch Shape Monitor U. Raich.
9 March 2005Edda Gschwendtner1 DAQ Terminology ISIS Terminology MICE Terminology Parameter Definitions.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 17, 2011.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
MC_ Muon Beam Lines 8/3/06 Want a  beam of ~300MeV/c –This requires a  beam of ~300 MeV/c Possible Sources: SY Proton Beam line components removed.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
East Area Secondary Beam Control User Guide Revised version after LS1 L.Gatignon / EN-MEF 5 January 2015.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
Proposal for Experiment S291: " Residual radioactivity induced by U ions - experimental investigation and longtime predictions" GSI, Darmstadt: G.Fehrenbacher,
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Fermilab Test Beam Facility Aria Meyhoefer (soon to be Soha) May 10, 2010.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
The Meson Test Beam Facility Erik Ramberg LRP Meeting – Oct. 30,2003 Delivering MI beam to MTBF User area layout Operational characteristics Detectors.
PS (electron cloud?!) instability at flat top Mauro Pivi Gianni Iadarola, Giovanni Rumolo, Simone Gilardoni 05/06/2012 LIU-PS meeting, CERN.
Electron Model for a 3-10 GeV, NFFAG Proton Driver G H Rees, RAL.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 22, 2011.
Beam line Experiment area SC magnet Pion production target
A. Meneguzzo Padova University & INFN Validation and Performance of the CMS Barrel Muon Drift Chambers with Cosmic Rays A. Meneguzzo Padova University.
Test beams status  Protvino source: V. Ammosov  Dubna source: P.Rukoyatkin, E.Strokovsky Václav Vrba Institute of Physics, AS CR, Prague – LCTW09, LAL,
1 Question to the 50GeV group 3GeV からの 54π と 81π 、 6.1π の関係 fast extraction 部の acceptance (81π?) Comments on neutrino beamline optics?
CNGS Operation Summary Edda Gschwendtner, CERN. Outline Introduction CNGS Performance Highlights since last NBI 2010 in Japan Issues Summary 2E. Gschwendtner,
Dec7,2007 ie-FP7 Test Beams for detector R&D at CERN The PS East Area The SPS North Area Irradiation facilities.
November 15-18, 2002V. Obraztsov - Prague ECFA/DESY Workshop 1 Proposal for TESLA beam test zone at IHEP ( Protvino ) Vladimir Obraztsov Institute for.
 A model of beam line built with G4Beamline (scripting tool for GEANT4)  Simulated performance downstream of the AC Dipole for core of beam using  x.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
T2K Status Report. The Accelerator Complex a Beamline Performance 3 First T2K run completed January to June x protons accumulated.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
F ERMILAB T EST B EAM F ACILITY Aria Soha June 12, 2012.
Beam time structures 1 At any particular instance of time there will be only one kind of beam in the MI. It will be either protons or anti-protons. The.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
MI Shielding Machine Protection Credit D. Capista March 7,2010.
FCC-ee injector complex including Booster Yannis Papaphilippou, CERN Thanks to: M.Aiba (PSI), Ö.Etisken (Ankara Un.), K.Oide (KEK), L.Rinolfi (ESI-JUAS),
HiRadMat Summary of Phase-I and plans for Phase-II commissioning J. Blanco, N. Conan, V. Kain, K. Cornelis, B. Goddard, C. Hessler, M. Meddahi, C. Theis,
Status of the electron cloud test-bench in LSS5 G. Arduini SL/OP Crash programme in collaboration with LHC/VAC,SL/AP,SL/BI,SL/MR,SL/MS,SL/OP,…
Report Technical Director Storage-Ring-Installation Completed
Beam Commissioning Adam Bartnik.
ESR for the muon DT Minicrate System
Introduction: FCC beam dumping system
LHC schedule.
Space charge studies at the SPS
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
Status of the beta-beam study
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
ESR for the muon DT Minicrate System
of secondary light ion beams
Upcoming longitudinal MDs

Proposals of new electron cloud monitor in the PS
CSC Trigger Primitives Test Beam Studies
Particle Detection System for MERIT
in a high intensity beam
A summary of world-wide test beam facilities
Production of Magnetized Electron Beam from a DC High Voltage Photogun
Fassò, N. Nakao, H. Vincke Aug. 2, 2005
Present and Future test facilities for High-intensity Targetry CERN
Beam dynamics requirements after LS2
Generation of Higher Brightness Beams for LHC
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
Variable distance from beam.
Particle Detection System for MERIT
The LHC Beam Interlock System
PSB magnetic cycle 900 ms MeV to 2 GeV
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Powering scheme for Hollow Electron Lens
Presentation transcript:

2003 test beam with 25 ns bunched muons Period: 19 May-23 May: Flat top beam 24 May-02 June: 25ns beam unless changes due to problems at the PS. Purpose: test of a MB3 full chamber with minicrate, TRIGGER electronics. Data taking program & strategy: see Zotto Where: moved from X5 (West Area) to H6 (North Area): more space available and main beam user

Beam period

PS problem NEWS (4-Apr-2003, 14:35):  Second PS spare magnet successfully tested After the failure of two PS bending magnets early last week, both spare magnets have been successfully tested now. The first spare magnet was already tested last week, the second PS spare magnet has been successfully tested this week and is back at the PS. The vacuum chamber is being re-welded inside today. So far everything is on schedule and the new SPS physics starting dates for the 25ns running period (May 19) and the long fixed target proton run (Jun 13) are not in danger.

H6 area beam line barrack 447 10 m

Chamber MB3 On Padova transportation tool: Phi wires vertical with wheels for rotation around the vertical axis MB1 minicrate fully equipped Water cooling Gas, HV, LV standard Trasportation & installation: presumably week of 12 May

People DAQ (from PD and LNL): from installation to end BO: experts of SC, TSM, … always, + other 2 PD: experts of BTI and Traco always, experts of monitor, + other 2 2-3 persons from other labs (To, Madrid, Aachen) from 24 May at least

Beam structure From Emmanuel.Tsesmelis@cern.ch Tue Apr 8 17:33:56 2003 Date: Tue, 8 Apr 2003 17:26:05 +0200 (CEST) Subject: TSTB NEWS 030408 - Beam Parameters for 25 ns SPS Run Dear Colleagues, in Period P1A of the 2003 SPS proton run, LHC-type beams with a 25 ns bunch spacing will available in the West and North Area secondary beamlines. The conditions will be similar to those available during the previous such run in 2001 and are given below: o 400 GeV beam energy o 16.8 s cycle length o 2.7 s Slow Extraction duration o 48 bunches with 25 ns spacing between bunches --> 48 * 25 ns = 1200 ns bunch train length with 1 bunch train per 23 microsecs o The bunch length was measured in 2001 to be 2.3 ns at the base. Due to radiation safety limits, there are restrictions on the maximum number of particles that can be sent to the experimental areas. With the limit of 10^6 protons per spill in the West Area zones, the average number of protons would be 0.18 p/bunch for a 2.7 s Slow Extraction. This limit is a few times 10^6 protons per spill in the North Area with the corresponding increase in the number of protons per spill. Collimation may be used to tune the intensity in the secondary zones. Earlier measurements at the SPS for the conditions at the West Area show that the bunch population with the 2.7 s flat-top are similar to those expected at the LHC. Timing signals from the accelerator will be available in the counting rooms of the experiments. Both the 40 MHz machine clock from the RF Faraday Cage and the 43 kHz SPS orbit signal will be distributed as in the past via the TTC system using optical fibre transmitters and receivers developed by RD12. Best regards, Emmanuel Tsesmelis

Beam structure