Session 13 Capacity Planning Techniques pom

Slides:



Advertisements
Similar presentations
Inventory Systems for Dependent Demand
Advertisements

Operations Scheduling
Disclaimer. Statements of possible future functionality for IFS’ software products and technology are for information purposes only and should not be interpreted.
Material requirement planning (MRP)
Material Requirements Planning (MRP) and ERP
Manufacturing Planning and Control
Chapter 15 - Material & Capacity Requirements Planning(MRP/CRP)
PRODUCTION AND OPERATIONS MANAGEMENT
Chapter 7. Capacity Planning and Management
Mark M. Davis Janelle Heineke
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
Dependent Inventory: Material Requirements Planning BA 339 Mellie Pullman.
Master Production Scheduling (MPS) – Basic Techniques pom
Principles of Operations Management
Material Requirements Planning (MRP)
CHAPTER MRP and ERP Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights.
Materials Requirements Planning (MRP) Chapter 16 in Schroeder.
Material Requirements Planning (MRP)
Perencanaan Kapasitas Produksi
21–1. 21–2 Chapter Twenty-One Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Production and Service Systems Operations
Managing Business Processes: Demand Management Cheng Li, Ph.D. California State University, Los Angeles January 2002.
Aggregate Planning and Resource Planning Chapters 13 and 14.
1 Example: MRP Schedule LocoMopeds is a manufacturer of off-road mopeds. The following product structure diagram represents the bill of materials for.
1-1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved 1 Chapter 18 Materials Requirements Planning.
Operations Management Material Requirements Planning
Resource Requirements Planning:
Dependent demand lumpy MRP DETAILED SCHEDULE FOR RAW MATERIALS & COMPONENTS USED IN THE END PRODUCTS MASTER SCHEDULE FOR END ITEMS.
Resource Planning OPIM 310-Lecture #7 Instructor: Jose Cruz.
Master Production Scheduling Logistics Workshop Asia 2004 Phnom Penh, Cambodia 10 – 14 May 2004.
Material Requirements Planning
11DSCI4743 Capacity Management Capacity management is planning & controlling resources needed to meet production objectives –Planning: determining resources.
Chapter 15 MRP and ERP.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
1 Operations Management MRP Lecture 22 (Chapter 14)
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 12 Resource Planning.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. MRP (Material Requirement Planning) (Method under Dependent.
1 MRP and ERP Chapter Transparency on aggregate to master plan.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 18 Material Requirements Planning.
1 © The Delos Partnership 2003 Detailed Planning processes Material Planning and Capacity Planning.
1 © The Delos Partnership 2003 Supply Chain Techniques Getting the plan executed.
Aggregate Planning and Resource Planning Chapters 13 and 14.
CAPACITY MANAGEMENT Nyoman Pujawan.
CAPACITY PLANNING Prof. Dr. Orhan Torkul Res. Assist. M. Raşit Cesur.
Resource Planning Chapter 15.
1 By: Prof. Y. Peter Chiu MRP & JIT ~ HOMEWORK SOLUTION ~
© 2008 Prentice Hall, Inc.14 – 1 Material Requirements Planning (MRP)
15-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Material Requirements Planning
Capacity Planning and Utilization
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
MRP and ERP  Material Requirements Planning (MRP) is a software based production planning and inventory control system used to manage manufacturing processes.
Chapter 13 MRP: Material Requirement Planning ERP: Enterprise Resource Planning.
Facility Inventory Old Facilities Modern Facilities Classroom Size
Lecture 34 MRP and ERP Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
MRP and ERP.
Introduction to Materials Management
CHAPTER 14 MRP and ERP.
MATERIAL Requirements planning MRP
Chapter 7 Capacity Planning and Management
Manufacturing Planning and Control
Outline Questions? Quiz on Thursday Any Questions on MRP Records?
MRP and ERP.
OUTLINE Questions? Quiz Discuss homework New Homework Start MRP.
14 MRP and ERP.
OUTLINE Questions? Quiz Results New homework MRP Capacity.
Capacity Management Capacity management is planning & controlling resources needed to meet production objectives Planning: determining resources needed.
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

Session 13 Capacity Planning Techniques http://www. pom Session 13 Capacity Planning Techniques http://www.pom.edu/mpc/lectures_in_manufacturing_planning.htm lecture session 14 Capacity Planning: Role in MPC Systems Rough Cut Capacity Planning Capacity Bill Technique Resource Profiles Technique Capacity Requirements Planning Capacity Definitions Technique Advantages/Limitations

Capacity Planning in the MPC System

Capacity Bill Example Sarah Reed. master scheduler at Walnut Hill, has developed a master production schedule for the XYZ boom box: Period 1 2 3 4 MPS 450 300 625 890 Dept. Capacity Hours per Unit of End Product Circuit Board 130 .2 Assembly 160 .3 The XYZ is fabricated in several departments, but the circuit board department and assembly areas are the potential bottlenecks. Prepare a rough-cut analysis of capacity for the MPS.

Problem 4. Sarah Reed Period: 1 2 3 4 MPS: 450 300 625 890 Capacity Requirements Capacity Capacity Bill Dept 1 2 3 4 Available (.2 hr/unit) Circuit Board 90 60 125 178 130 hr/per. (.3 hr/unit) Assembly 135 90 187.5 267 160 hr/per. Requires: MPS, setup time and run time information from product routing file.

Resource Profile Example Determine the capacity requirements in all work centers at Erben Fabricators using the MPS, resource profile, product structure, and lead time information given below for product Z and all of its components. (Assume all usages are one and that a new setup must be made in each period at each work center.) Period 1 2 3 4 5 Product Z MPS 10 20 15 10 15 Product Z resource profile Part Work center Setup hours Run hours/unit Planned Lead time Z 201 8.0 1.5 0 periods M 201 5.0 1.0 1 period N 202 3.0 2.0 1 period O 202 2.0 1.0 2 periods P 203 1.0 0.5 3 periods

Resource Profile Solution Requires: MPS, setup and run time information from the product routing file, and lead time information.

Capacity Requirements Planning (CRP) Example The Kuczma Company makes sign mounts for commercial customers. One product is the H mount which is made up of a painted surface on both sides of a wooden H frame. The H mount is put together in final assembly. The surfaces are painted in the paint shop, and frame is made in the frame shop. Kuczma wants to estimate the H mount capacity needs for next five periods in final assembly, the paint shop, and the frame shop. Setup Operation Work Center Time Run time Mount assembly Final Assembly 2 hours 1.0 hours Fabricate H frame Frame Shop 3 hours 0.5 hours Paint surfaces Paint Shop 4 hours 0.4 hours

Capacity Requirements Planning (CRP) Example (continued)

Capacity Requirements Planning (CRP) Example (continued) * In hours

Capacity Requirements Planning (CRP) Example (continued) Period Dept 1 2 3 4 5 6 H Mount Assy 17 22 22 22 22 0 H Frame 28.5 0 18 18 0 0 Painted Surface 24 24 24 24 0 0 Note: 28.5 = 3 + 0.5(15) + 3 + 0.5(30) Requires: Planned order and schedule receipt information from the MRP system, and setup and run times from the product routing file.

Capacity Definitions Required capacity: Estimated using capacity planning techniques Rated capacity: Available capacity considering staffing equipment capabilities Demonstrated capacity: Actual (or realized) capacity based on actual production output

Capacity Planning Techniques: Pros and Cons Capacity Bills Pros Cons Easy to use Doesn’t consider lead times, inventory Minimal computational information, or gross-to-netting requirements Consider product mix Less accurate Resource Profiles Easy to use Doesn’t consider inventory information Minimal computational or gross-to- netting Considers lead times Less accurate Consider product mix Capacity Requirements Planning Considers: gross-to-netting, Requires MRP system, Time-phased Inventory information, records, Extensive computational lead times requirements More accurate Considers product mix