RED SEA- DEAD SEA PROJECT/PHASE I The Government of the HASHEMITE KINGDOM of JORDAN Represented by The Ministry of Water and Irrigation January 2014.

Slides:



Advertisements
Similar presentations
Unlocking the Potential in Aqaba and Jordan
Advertisements

TEAM TWO ALTERNATIVE ADD WATER PROJECT May 20, 2009.
EURORAIL Project Organizational model. EURORAIL Project Initiator: Ministry of transport and communications of Ukraine Lviv Oblast State Administration.
Fill in missing numbers or operations
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
1 International CEO Forum IV Dr. Ravi Ratnayake Director Poverty and Development Division UNESCAP 17 December 2007, Bangkok REGIONAL INFRASTRUCTURE DEVELOPMENT:
Strengthening National Metrology Institutes (NMIs) in the Hemisphere, an essential element in the development of National Quality Infrastructure (NQI)
Michael Egan Head of Corporate Affairs National Roads Authority Development and Implementation of the National Roads Programme in Ireland
1 Effective Support for Enlargement Accelerating public investments Western Balkans Investment Framework Brussels, 19 October 2009 Alessandro Carano, EIB.
TEN-T Info Day for AP and MAP Calls 2012 OVERVIEW AND PRINCIPLES Anna Panagopoulou TEN-T EA Head of Unit T4 –Technical & Financial Engineering, GIS & Monitoring.
World Bank Framework for Energy Trade in South East Europe David Kennedy World Bank.
1 José Frade European Investment Bank Water and Sanitation EC-EIB Seminar Session 1: What constraints access to finance Financing the Maputo water supply.
Welcome to Who Wants to be a Millionaire
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
J2 Regulating Reservoir Project
Water policy development in Uganda
Challenges in Finding and Connecting New Water Sources J. Tupling, P.Eng. June 22, 2009.
Water scarcity in the Arab world: how to get from crisis to sustainable? Rania el Masri, Ph.D. Environment and Energy Policy Specialist Cairo, May 8, 2012.
ppt Tularosa Basin National Desalination Research Center Feasibility Study Presented by Mike Hightower, Sandia National Laboratories Tom Jennings,
The Hashemite Kingdom of Jordan Ministry of Water and Irrigation Jordan Valley Authority RSDS- Phase I Desalination of (80-100) MCM/yr at Aqaba.
Integrating Water Management The Future of Integrated Water Management: Moving the Program Forward Gary Bardini, Deputy Director CA Department of Water.
2 nd International Conference Graz October, 10 th 2012 Techniques to save water quantity PP5 (LCA) PPs: LCA, LfULG, RNA.
Madrid, 29 th January th RCC Meeting South Gas Regional Initiative.
Madrid, 13 th November th SG Meeting South Gas Regional Initiative.
Methow Valley Irrigation District Alternatives Evaluation Presented by Bob Montgomery, P.E. and David Rice, P.E. January 31, 2013.
Paris, 14 th December th IG Meeting South Gas Regional Initiative.
WGP-AS UNDP/RBAS Water Governance Programme for Arab States (WGP-AS) NATIONAL CAPACITY NEEDS FOR THE EFFECTIVE JOINT MANAGEMENT OF SHARED WATER RESOURCES.
Airport Sustainability is a holistic approach to managing an airport to ensure Economic viability, Operational efficiency, Natural resource conservation,
Public Private Partnership in Jordan Executive Privatization Commission Tunis 16 th Feb
What’s The Big Idea? The Energy Economy. It’s the Energy Economy Growth in a Time of Recession Opportunities in the Green Economy Southampton’s Track.
MENA Water Outlook 2050 Water Scarcity and Adaptation Options
The Murrumbidgee Irrigation Area (MIA) Infrastructure Modernisation  Improve delivery system efficiencies  Meet changing customer needs  Reduce asset.
Ken Jacobs Airport Planning & Environmental Division March 3, 2010 Federal Aviation Administration Federal Aviation Administration 33.
Madrid, 27 th October th IG Meeting South Gas Regional Initiative.
Madrid, September 23 rd th SG Meeting South Gas Regional Initiative Open Season for future capacity.
GRI-S : Infrastructures The Union list of projects of common interest European Commission DG Energy Internal Market I: Networks and Regional Initiatives.
UK and Rwanda Trade & Investment Forum 22 nd October 2014 Confidential Changing the Game for Africa.
Version 5, Revised on ERPA 2014 © 20. ERPA Project – Horizon 2020  Horizon 2020 = the new EU programe for Research & Innovation  Started 01/01/2014.
Hashemite Kingdom of Jordan Ministry of Water and Irrigation authority Water in Jordan: The way forward 2012 Pre by: Eng.Rateb Al-Adawn Water in Jordan:
12-May-151 Khan Younis Waste Water Treatment Plant Management Arrangements Khan Younis Waste Water Treatment Plant Management Arrangements.
Presented by: Kevin J. Spencer, P.G. R.W. Harden and Associates, Inc. Benefits and Challenges of Developing Brackish Groundwater Supplies WATER Supply.
SEISMIC RISK REDUCTION Stela PETRESCU MDPWH PMU General Director Ministry of Development, Public Works and Housing ICAR FORUM, Bucharest, 1-2 October 2007.
Phases of A BOT Project Prepared By :Afaf Bu-khawa Course title: Technology Implementation,MGT 620.
PUBLIC-PRIVATE PARTNERSHIPS PUBLIC-PRIVATE PARTNERSHIPS In Jordan By Engineer Ibrahim Abu Shams Planning and Management Unit Ministry of Water and Irrigation.
Support for programme and project development: JASPERS and ELENA Ralf Goldmann EMA network Meeting
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Jordan River Rehabilitation Project March 22 nd /6/20151.
Jeff Delmon FEU Financial Solutions World Bank. Why PPP? Procurement efficiency Lifecycle management Design/construction/operation management Monetizing.
Jordan Lake Partnership Western Intake Feasibility Study Jordan Lake Partnership Western Intake Feasibility Study 1.
AfDB - EBRD Joint conference in procurement reform in North Africa and SEMED Countries Marrakech 22 and 23 April 2013 Jordan Delegation 22-23/4/2013.
Financing Urban Public Infrastructure
Water Crisis in Gaza Strip A study of the Impact of Middle East Conflict upon Water Quantity and Quality in Gaza Strip By: Ayman H. Afifi Islamic University.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Lay-out of Proposed Scheme. Positives – Well located for integration into both NMBM Potable and Industrial supply infrastructure Can supplement either.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
Joint WRAP Update Meeting III January 26, WELCOME… Thank you for joining us Please sign in Tonight’s topic… How we plan to meet the County’s future.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Vahid Alavian The World Bank Strategic Environmental Assessment Jordan – Water Sector Module 3: International Experiences and Case Studies.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REGULATION 1164/94) MANAGEMENT OF PROJECTS, FINANCED BY COHESION.
Ministry of Water and Irrigation Jordan World Meteorological Organization Blue Peace- Water Security in the Middle East Project Coordination Meeting Current.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
Dead Sea Solutions Monica Enriquez April 16, 2013 Israel: Science and Innovation.
13/10/2004Rafi Benvenisti1 The Second Israeli-Palestinian International Conference on “Water for Life in the Middle East” Addressing the Dead Sea Basin.
Showcase cost-saving practices, scale- appropriate technologies, and economic development opportunities and case studies from Idaho communities. Provide.
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
Dead Sea Solutions Monica Enriquez April 16, 2013 Israel: Science and Innovation.
STATE LAW OFFICE AND DEPARTMENT OF JUSTICE
Presentation transcript:

RED SEA- DEAD SEA PROJECT/PHASE I The Government of the HASHEMITE KINGDOM of JORDAN Represented by The Ministry of Water and Irrigation January 2014

Establish a Secure and Affordable Water Supply for Jordan while Saving the Dead Sea from Extinction Support Widespread Economic Growth in Jordan Provide for Potential Regional Water Sharing Facilitate Private and Public Partnership through a (BOT) project.

Water Deficit in Jordan MCM/Yr DemandSupplyDeficitDemandSupplyDeficitDemandSupplyDeficitDemandSupplyDeficitDemand SupplyDeficit Base Deficit Add 25%(15% Physical Losses, 10% Influx from neighboring Countries Add Reduction of over abstraction Total Deficit in the Kingdom w/o Disi Disi Kingdom with Disi Jordan ranks as the 3 rd poorest nation in terms of freshwater resources at 133m 3 /person/year

Ministry of Water and Irrigation

6 Completed Studies 1. Feasibility Study Coyne et Bellier 2. Environmental and ERM Social Assessment 3. Study of Alternatives Professors Allan, Tsur and Malkawi 4. Red Sea Modeling Study Thetis 5. Dead Sea Modeling Study Tahal Red Sea – Dead Sea Water Conveyance Study Program WB Study Multi-Stakeholder Consultations

7 Potable Water Distribution and Operating Costs / Year Beneficiary Party Jordan 60 Israel 60 Palestine Available for Further Allocation Total MCM/Year Operating Cost $ Million/Year

Cyanobacteria Discharged Water (mcm/yr) Level change (m/yr) Stratification Biological bloom Gypsum whitening Level drop Level rise Mono mictic Mero mictic ? seasonal long term, dilution Dunaliella (crystal size, growth rate) Sinkholes Groundwater Acceleration (?) Due to dilution More sinkholes Minor depletion No depletion ? Expected Impact on the Dead Sea (WB)

As A follow-up on the WB Study The Regional Countries are in agreement to start the implementation of an initial phase to fulfil the concept of: Rapid initiation of RSDS Regional Project with Initial Phase I, and it will serve as a pilot phase. Initiating the infrastructure elements of all subsequent project phases

Memorandum of Understanding (MoU) has been signed on Dec 9, 2013 between Jordan, the Palestinian Authority, and Israel at the World Bank in Washington DC, in which all parties agreed to start the implementation of the first phase of the RSDS project on BoT basis. Following up on this MoU, bi-lateral agreements will be signed between Jordan and Israel and Palestinian Authority and Israel soon; This project RSDS-Phase I (Red Sea Desalination Project at Aqaba) is a result of a joint initiative to promote regional cooperation among Israel, Jordan and the Palestinian Authority (the Beneficiary Parties).

Treatment and Desalination Plant (80-100) mcm/yr Freshwater Booster Pump Station to Aqaba (2 pumps -300 m and 2-50 m pumps) Freshwater Conveyance (4 km of 1.2 m Pipeline to Border) (17.0 km of 0.8 to 1.0 m Pipeline to Aqaba) Seawater Conveyance (2km of 3.7 m pipeline and 22 km of 2.2 m Pipeline) Seawater Intake Pump Station (pumps- 50m VT pumps; 4,500 HP motors) Intake Structure (178 to 222 mcm/yr) with Max Capacity 700 mcm/yr Red Sea Aqaba Wadi Araba

Desalination Brine Conveyance (200 km of 1.4 to 1.8m Pipeline) Desalination Brine Pressure Regulation (3-Pressure Reducing Stations; With the potential to be replaced by Hydropower Generation Stations 1- (Reservoir) at high point Two desalination Brine Booster Pump Station Dead Sea Red Sea Amman Aqaba Wadi Araba

The Gulf of Aqaba is Protected, no Environmental effects Infrastructure is Designed to be Expanded No Infrastructure is Abandoned in Future Phases The Phase I Desalination Facility at Aqaba Provides Flexibility in Delivering Freshwater to Current Consumers Project Financing is Feasible through a Combination of Acceptable Water Rates and Financial Grants The Project Initiates the Process to Save the Dead Sea

Next Step Preparation of RFP for the Selection and Assignment of a Specialized Engineering Firms to prepare Preliminary Design, Legal and Financial Terms, and Tender Documents based on BoT and PPP participation. DRAFT RFP is AVAILABLE Implementation Schedule ActivityDuration Preparation of Tender Documents 12 months: Starts in March, 2014 Tendering of Contract for BOT Contractors Nov, 2014 Final Selection of preferred bidder May, 2015 Beginning of Construction Phase Jan, 2016 Duration of Construction 30 months