Peco Facet Sewage Water Treatment Plant

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

HVAC UNIT : LOCALISATION IN VEHICULE
Advanced Wastewater Treatment Plants.
Slide 1 Insert your own content. Slide 2 Insert your own content.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 4 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Regional Policy Common Indicators: Infrastructure Definitions and Discussion Brussels, 22 nd November
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Coordinate Plane Practice The following presentation provides practice in two skillsThe following presentation provides practice in two skills –Graphing.
0 - 0.
ALGEBRAIC EXPRESSIONS
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Year 6 mental test 10 second questions Numbers and number system Numbers and the number system, fractions, decimals, proportion & probability.
BALANCING 2 AIM: To solve equations with variables on both sides.
ZMQS ZMQS
Perception of Poland and Poles in the Netherlands The Hague, Dr Jacek Kucharczyk Institute of Public Affairs 1.
Richmond House, Liverpool (1) 26 th January 2004.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
S.Thomas College Gurutalawa OLD BOYS ASSOCIATION 2008/09 JUNIOR DORMITORY TOILET PROJECT.
Peco Facet Sewage Water Treatment Plant
Power Plant Construction and QA/QC Section 2.3– Steam Generators
Confined spaces What all agricultural workers need to know.
AEC advanced environmental control aps
1 an online tool for GSM networks Planning and Inventory and others… IMK Consulting Simple tools for complex needs IMK – your IT tailor.
6/12/ DFS ABU DHABI STAFF ACCOMODATION.
Medical Gas Rail.
1 UPCOMING OPPORTUNITIES – Contractors Caissons Contractor(s) to perform installation of caissons to include purchase of all required materials. u Low/High.
O X Click on Number next to person for a question.
© S Haughton more than 3?
15. Oktober Oktober Oktober 2012.
1 Directed Depth First Search Adjacency Lists A: F G B: A H C: A D D: C F E: C D G F: E: G: : H: B: I: H: F A B C G D E H I.
Twenty Questions Subject: Twenty Questions
General Navigation Training Presentation for Supply Chain Platform: BAE Systems July 2012.
Take from Ten First Subtraction Strategy -9 Click on a number below to go directly to that type of subtraction problems
Linking Verb? Action Verb or. Question 1 Define the term: action verb.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Limits (Algebraic) Calculus Fall, What can we do with limits?
Properties of Exponents
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Addition 1’s to 20.
25 seconds left…...
1 Important Changes to the Victorian Electricity Industry for Electrical Infrastructure Civil Works 1 July 2009.
Test B, 100 Subtraction Facts
11 = This is the fact family. You say: 8+3=11 and 3+8=11
Analysis of engineering system by means of graph representation.
Week 1.
We will resume in: 25 Minutes.
1 Ke – Kitchen Elements Newport Ave. – Lot 13 Bethesda, MD.
1 Unit 1 Kinematics Chapter 1 Day
O X Click on Number next to person for a question.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – July 2012eere.energy.gov Building Science Basics WEATHERIZATION INSTALLER/TECHNICAN FUNDAMENTALS.
Design of W.W. Collection System
 UAB Vilniaus waters - the largest water company in Lithuania, which operates not only in the city of Vilnius, but also the district, Svencionys and.
About Us  We are a group of Mechanical Engineers specialized in Construction & Engineering Services.  Our mission is to provide highest quality of construction.
Designer/Contractor JV- Apron Services Projects- A Winning Case
Muttathara Sewage Treatment Plant - Blue Drops. Features of the plant The only one in the whole of Kerala Started in 2012 Capacity of 107 MLD (million.
Presentation transcript:

Peco Facet Sewage Water Treatment Plant STP 16 HA

Peco Facet Sewage Water Treatment Plant Project Information Project: …………………………………………….…..Lankaran Court of Grave Crimes Contractor:……………………………… Ministry of Justice of Azerbaijan Republic Detailed design …………………….... “AzerDovletLayihe” State Design Institute Civil works: ……………………………………………………….… “EL-SEYM Insaat” LLC Subcontractor for Sewage Water Treatment: …………..Facet Germany GmbH Date of order: ………………………………………………………………………….July 2011 Facet model: …………………………………………………………………………..STP-16HA Max. design flow rate: …………………………………………………………….40 m³/day Equivalent inhabitants: ……………. 160 persons (Directive: CE 91/271/CEE) Commissioning date: …………………………………………………………….04.05.2012

Peco Facet Sewage Water Treatment Plant Lankaran City R Republic of Azerbaijan 270 kilometers from capital Baku Lankaran

Lankaran Court of Grave Crimes Lankaran, Republic of Azerbaijan Peco Facet Sewage Water Treatment Plant http://courts.az/lankarangravecrimes/?lng=en Lankaran Court of Grave Crimes Lankaran, Republic of Azerbaijan Facet STP unit

Peco Facet Sewage Water Treatment Plant Waste Waters formed in toilets and kitchen to the Sewage Water Treatment Plant installed by Facet Facet STP unit The unit has been build behind the Court walls

Sewage Water Treatment Plant STP16HA Peco Facet Sewage Water Treatment Plant Sewage Water Treatment Plant STP16HA Facet scope: Basic Design, Engineering, Supply of Equipment, Installation and Start-up All civil works and sewer network system was made by EL-SEYM Insaat LLC (local construction company)

Construction period – January 2012 Peco Facet Sewage Water Treatment Plant Construction period – January 2012 Pumper well Aeration Chamber Aeration chamber & control room Place for Module Control room General View EL-Seym Insaat LLC - Local Civil company has built Pumper well, Inlet pit, Aeration Chamber and Control Cabin According to drawings provided by Facet

Installation period – March 2012 Peco Facet Sewage Water Treatment Plant Installation period – March 2012 Installation of Settling and Disinfection Chamber by Crane Installation works has been carried out by sub-contractor of FACET GERMANY

Installation period – March 2012 Peco Facet Sewage Water Treatment Plant Installation period – March 2012 Installation of the skid to Control Room (PLC, Blower, Recirculation Pump, Ozone Generator)

Installation period – March 2012 Peco Facet Sewage Water Treatment Plant Installation period – March 2012 Connections from Control Skid to the Module

Installation period – March 2012 Peco Facet Sewage Water Treatment Plant Installation period – March 2012 Connections between Aeration Chamber and Settling/Desinfection Module

Installation period – March 2012 Peco Facet Sewage Water Treatment Plant Installation period – March 2012 Installation of BioFilm Media and Air Diffuser in Aeration Chamber

Installation period – March 2012 Peco Facet Sewage Water Treatment Plant Installation period – March 2012 Basket in pumper well Outlet Pipe to Collection box

Peco Facet Sewage Water Treatment Plant Water Filling – May 2012

Start up Commissioning – May 2012 Peco Facet Sewage Water Treatment Plant Start up Commissioning – May 2012 Facet specialists has carried out the operation training course to the staff of EL-Seym Insaat LLC

Start up Commissioning – May 2012 Peco Facet Sewage Water Treatment Plant Start up Commissioning – May 2012 Facet specialists has carried out the operation training course to the staff of EL-Seym Insaat LLC

Peco Facet Sewage Water Treatment Plant General Plan

Peco Facet Sewage Water Treatment Plant Effluent Conditions Ph……………………………………………………6-8 BOD5 ……………………………………………..<25 mg/l COD …..……………………………………………<125 mg/l TSS …………………………………………………<35 mg/l O2 dissolved (aeration chamber) ……..6-10 mg/l Temperature ………………………………….. Ambient Aspect ………………………………………..…. Odorless and Transparent

Thank you for attention Peco Facet Sewage Water Treatment Plant Thank you for attention