Linepack ‘Park and Loan’ Quantity – Scenario Analysis

Slides:



Advertisements
Similar presentations
Network Models Robert Zimmer Room 6, 25 St James.
Advertisements

Network Models Robert Zimmer Room 6, 25 St James.
4. Capacity Planning. Basic Organizational Structures in a Production Plant: Functional Line Continuous Process Group Organization.
Linepack ‘Park and Loan’ Quantity - Influencing Factors Review Group 291 – July 2010.
 A written document that specifies how, where, and to whom a business plans to market its product(s) and/or brand(s).  A small business typically creates.
Network Flows Based on the book: Introduction to Management Science. Hillier & Hillier. McGraw-Hill.
Flexibility of system to deliver water Level of control available to the irrigator e.g. ditch system on a fixed schedule vs. large capacity well supplying.
Prepared by: Husam Al-Najar Environmental Engineering Department The Islamic University of Gaza Gaza Strip. Gaza city, Al-Rimal P.O.Box. 108 WATER CONSUMPTION.
PROFESSIONAL MASTER’S PROGRAMS Applications, Admissions and Financial Aid 2012 S.I. Newhouse School of Public Communications Syracuse University.
RG0291 – NTS Licence SC27 – Balancing Arrangements Linepack – Commercial Considerations/Options Review Group 291 – 19 th July 2010.
The Entry Capacity Transfer & Trade Methodology Statement Transmission Workstream
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Bulgarian Academy of Sciences. 22 July, Index Introduction Outline of the scheme Step 1. Individual weights Step 2. Preference aggregation Step.
Network Appurtenances Major operations within a water transport and distribution systems are: 1. Transmission. 2. Storage. 3. Pumping.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
WOOD 492 MODELLING FOR DECISION SUPPORT Lecture 24 Simulation.
Salinity and Bulk Water Workshop 27 October 2010 Werribee Irrigation District.
Information provision for winter 09/10 Jenny Phillips – GNCC Strategy & Support Manager.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Chapter 5 Activity-Based Cost Management Systems.
Local Intelligent Networks and Energy Active Regions in Flanders Carlo Mol - VITO.
Analyze Graph Exercise. LINE GRAPH A line graph is best for showing data that changes over a range.
Ofgem Information Request on availability of NTS Exit Flexibility Capacity Ritchard Hewitt Gas Code Development Manager National Grid Transmission 7 th.
Components of Water Networks Eng. Mona Al-Gharbawi Eng. Ayman Al-Afifi
Trades and Transfers Workshop, 6 th November 2007.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Water Reclamation Plant Feasibility Study Update July 23, 2014.
MTM/Lease Accounting Criteria Tier 1 Criteria The presence of any one of these attributes will result in lease classification for the contract despite.
Area Covered. Work Done Quantity Financial Progress of work.
Distribution System Analysis for Smart Grid
Factors to consider •Level of control available to the irrigator •Flexibility of system to deliver water   •Level of control available to the irrigator.
Place - Distribution Different channels of distribution are important so that products and services are offered and reach existing and potential customers.
Rough-Cut Capacity Planning in SCM Theories & Concepts
UNC Modification Proposal 0202 National Grid Distribution
Demand forecast and network balancing
Inter-day Energy Transfer – Opportunity and Risk
Review of System Alerts
System information provision
Transmission Workgroup 7th July 2011
LOGISTICS NETWORK.
System Control based Renewable Energy Resources in Smart Grid Consumer
UK Link Technology Refresh
*No Checking Account Payday Loans* Gain Advance Cash to Meet Your Financial Woes
Online Gifts Buy for wishes happy mother's day to yours choice and with happy gifts find here:
Understanding the importance and types of inventories
2012 סיכום מפגש 2 שלב המשכי תהליך חזוני-אסטרטגי של המועצה העליונה של הפיזיותרפיה בישראל.
Consumer Choice and Controls
Deployment & Available-to-promise (ATP) in SCM Theories & Concepts
Quantifying the Impact of Deployment Practices on Interplant Freight Volatility Kurn Ma Manish Kumar.
Network Models Robert Zimmer Room 6, 25 St James.
The NGS on the Road Gillian Sinclair NGS Liaison Officer
DISCRETE ASCENT OPTIMAL PROGRAMMING APPLIED TO NETWORK CONFIGURATION IN ELECTRICAL DISTRIBUTION SYSTEMS B. A. Souza H. A. Ferreira H. N. Alves.
Publication of Zonal Flex Data
Background to National Grid’s Baseline analysis
DSR Volumetrics Workgroup 3 10 September 2014.
Enhanced information provision and revision of the Gas Balancing Alert for Winter 2009 July 2009.
Day 9 - Humidity Science 10 Weather.
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – User Pays Options Review Group August th November.
Proposals to be Reviewed
Get Quick Loans For Unemployed People In Just Simple Steps.
Capacity Planning For Products and Services
Independence Day.
Park & Loan Balance Monitoring
Transmission Workstream 09/11/2010
195AV “Future work” – system flexibility
Flexibility.
The Global Workspace Needs Metacognition

July update JANUARY 2019.
Presentation transcript:

Linepack ‘Park and Loan’ Quantity – Scenario Analysis Review Group 291 – July 2010

Park and loan scenario analysis Network analysis done based on system conditions on a typical winter day. Well-distributed supply, full plant availability and performance. Supplies increased at different points until maximum level reached. Requirements for within day flexibility and contingency taken into account. Results indicate potential range of park and loan is between 2 and 10 mcm. On the day, decision to release and volume released would be at discretion of National Grid.