EVLA Advisory Committee Meeting System Status

Slides:



Advertisements
Similar presentations
Preliminary Design Review EVLA 1 st and 2 nd Local Oscillators.
Advertisements

Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
Central Development Laboratory (Adapted from John Webber’s Viewgraphs, April 2002 Presented tonight by Skip Thacker) IEEE Tour April 2003.
The Prototype Correlator Sonja Vrcic Socorro, 5. December, 2006.
GBT K-band Focal Plane Array Monitor and Control Interface, Cryogenic LNA Bias System February 27, 2008.
Systems Integration and Testing EVLA Advisory Committee Meeting, March 19-20, 2009 Jim Jackson Systems Engineer.
SJDEVLA Advisory Committee Meeting September 6-7, EVLA Production and Maintenance Steven Durand presenting for the E lectronics Division.
Mark McKinnon NSF Mid-Project Review May 11-12, Budget, Schedule, Contingency Mark McKinnon Project Manager.
Paul HardenEVLA LO-IF CDR May 17, IF Subsystem Specs & Measured Test Data.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Project Overview Mark McKinnon Project Manager.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
Bill SahrEVLA Advisory Committee Meeting May 8-9, EVLA Monitor & Control.
Project Overview and Status EVLA Advisory Committee Meeting, March 19-20, 2009 Mark McKinnon EVLA Project Manager.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
Peter NapierEVLA Correlator CoDR Nov 2, EVLA Correlator CoDR P. Napier Overall EVLA Project Plan.
R. HaywardEVLA Front-End CDR – EVLA Front-End Schedule 24 April EVLA Front-End CDR EVLA Front-End Schedule.
Bob Hayward Receiver Engineer Feed & Front End PDR Feb Feed & Front End PDR Q, Ka, K, Ku & X-Band Receivers Backup Slides.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
Student: Vikas Agarwal Guide: Prof H S Jamadagni
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
Paul Harden VLA Veteran EVLA LO-IF PDR 22 January EVLA IF/LO EVLA “LOW BAND” CONVERTERS For 4/P/L/S/C and Ku Bands.
Travis Newton LO-IF Engineer EVLA LO/IF PDR January IF Downconverter Travis Newton LO/IF Engineer.
Q, Ka, K, Ku & X-Band Receivers
M. McKinnonEVLA Advisory Committee Meeting September 6-7, Project Overview Mark McKinnon Project Manager.
R. HaywardEVLA Feeds CDR – Project Budget & Schedule 17 Feb EVLA Feeds CDR Project Schedule & Budget.
Chuck KutzEVLA Front-End CDR – LO/IF System April 24, EVLA Front-End CDR EVLA Front-Ends and the EVLA LO/IF System.
Brent WilloughbyEVLA Front-End CDR – WVR Option 24 April EVLA Front-End CDR Water Vapor Radiometer Option.
Bill SahrEVLA Advisory Committee Meeting September 8-9, EVLA Monitor & Control.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Author Wayne M. Koski EVLA Monitor & Control Hardware PDR March 13, EVLA Monitor and Control Monitor & Control Transition.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Management Plan Peter Napier Project Organization Schedule Budget.
SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software.
WIDAR Correlator Options and Potential Craig Walker NRAO Socorro U.S. VLBI Technical Coordination Meeting May 14-15, 2007.
AMSAT-SA Digital Transponder, telemetry and command system.
Future LBO Developments
Software Overview Sonja Vrcic
RF section Control section Output Section Df Df Df CPU Hybrid LC
EVLA Availability - or - When Can I Use It?
EVLA Advisory Committee Meeting System Status
EVLA NSF Mid-Project Review System / Antenna Status
EVLA NSF Mid-Project Review System / Antenna Status
Terry Cotter LO/IF Group Leader
LO/IF System Requirements
Antenna Monitor & Control Subsystem Engineering Requirements
Budget, Schedule, Contingency
EVLA LO/IF Racks/Bin/Modules
EVLA System PDR System Overview
Software Requirements
EVLA M/C Software PDR, 14 May 2002
VLA to EVLA Transition Plan
EVLA Receivers PDR Transition Planning Author Daniel (Mert) Mertely
Terry Cotter LO/IF Group Leader
EVLA Advisory Committee Meeting
Terry Cotter LO/IF Group Leader
Software Requirements
Gustaaf van Moorsel September 9, 2003
Software Requirements
Mark McKinnon EVLA Project Manager
Background Information P.Napier
EEG Probe Project Grant G. Connell.
EVLA Racks Bins and Modules PDR
Data Transmission System Digital Design Chris Langley NRAO
Project of Direct Sampling Digital Backend for Quasar VLBI-network
Correlator Growth Path
EVLA Advisory Committee Meeting System Status
EVLA Construction Status
EVLA Advisory Panel Mtg. System Overview
SKAMP Square Kilometre Array Molonglo Prototype
Presentation transcript:

EVLA Advisory Committee Meeting System Status Jim Jackson, Hardware Systems Engineer 12/27/2018 Jim Jackson EVLA Advisor Committee 8-9 May 2006

System Status Antennas Antenna status Antenna 13, 14, 16, 18, 24 and 26 Electronics status Currently in or ready for production Nearing production On-going issues Front-end status 12/27/2018 Jim Jackson EVLA Advisor Committee 8-9 May 2006

System Status Antennas Antennas 13, 14 and 16 Turned over to op’s for initial scientific use L,C,X,K and Q bands available with 4 IF’s 4/P bands available on antennas 14 and 16 Temporary band switching arrangement No total power or ALC Antennas 14 and 16 have prototype LO hardware Software compatible, retrofit Mid CY 2007 Antennas 13 has production LO hardware Tests and evaluation on-going Scientists being encouraged to use antennas in observations 12/27/2018 Jim Jackson EVLA Advisor Committee 8-9 May 2006

System Status Antennas Operating since Mid-March w/ 2 IF’s at X-band L,C,X and K band now available w/ 4 IF’s Mostly production hardware Test bed for updated hardware New L302 synthesizer firmware M301 for band switching T304 with total power detectors and ALC Turn over to operations likely in early June 12/27/2018 Jim Jackson EVLA Advisor Committee 8-9 May 2006

System Status Antennas Outfitting electronics now First fringes expected mid May M302/M303 utility modules will be added Antenna 26 In barn for azimuth bearing change VLA electronics stripped EVLA refit to begin by 1 June 12/27/2018 Jim Jackson EVLA Advisor Committee 8-9 May 2006

System Status Electronics Electronics currently in (or ready for) production D301-4 DTS Module – excluding 3-bit digitizer PCB D351 DTS De-formatter F320 Front End Transition Module L300 Synthesizer Reference Generator L301 12-20 GHz Synthesizer L304 LO Reference Receiver L305 / L350 Reference Generators L351 Offset Generator L354 LO Driver L355 Digital Timing Distributor M304 Module ID P301/302 DC/DC Power Supplies T302 LSC Converter T303 UX Converter T305 Baseband Converter - Digital 48 VDC Power System Front End Card Cage Main Equipment Racks 12/27/2018 Jim Jackson EVLA Advisor Committee 8-9 May 2006

System Status Electronics Modules in final design – nearly ready for production F317 Front End Controller – In final testing – Low Risk / High Priority L353 LO Transmitter – PCB Rev – Med Risk / High Priority Complex board to integrate design Mainly to simplify manufacture M301 Converter Interface – In final testing – Low Risk / High Priority M302/M303 Utility Modules – In final testing – Low Risk / High Priority P350/P351 DC/DC Power Supply – PCB Rev – Low Risk / Low Priority PCB Mod to support N+1 redundancy For reliabilty of central LO Power Dist. Board for Central LO – New PCB Dev – Low Risk / Low Priority T301 4/P Converter – PCB Rev – Med Risk / High Priority 1024 MHz Isolation Issue on RF PCB Solar Attenuator PCB to be developed T304 Baseband Converter – PCB Revs – Med Risk / High Priority Total Power Detectors New Filter Arrangement 12/27/2018 Jim Jackson EVLA Advisor Committee 8-9 May 2006

System Status Electronics Modules with on-going issues L302 10-15 GHz Synthesizer – High Risk / High Priority Affecting data from antennas Phase jump problem Lock stability / lock time issues New MIB / FPGA firmware developed Updated unit being tested in Antenna 18 Worst Case – Re-design of DDS PCB L352 Round Trip Phase Meter – Med Risk / High Priority Issues with thermal stability Issues with measurement repeatability New PCB’s developed New design being tested in system 12/27/2018 Jim Jackson EVLA Advisor Committee 8-9 May 2006

System Status Electronics Other electronics related on-going issues Network timing – Low Risk / High Priority Current scheme utilizing NTP timing not working well Causing jumps in time as seen by MIB’s in L302 synthesizer Researching GPS time servers to connect to M&C network at VLA Currently affecting test and scientific data 3-Bit digitizer for DTS – Med Risk / Med Priority 2 design options – comparable cost 3 bit / 4Gsps device being designed for ALMA IC and PCB’s in development at University of Bordeaux Some possible issues with design and performance for EVLA application 6 bit / 4Gsps COTS device from Rockwell IC now available PCB in development at NRAO Socorro Challenging design – very high speed PCB’s Can tolerate some delay Considerable EVLA capability with 8-bit device 12/27/2018 Jim Jackson EVLA Advisor Committee 8-9 May 2006

System Status Front-Ends 4 Band Complete – Using existing VLA receiver P-Band Mostly complete – Using existing VLA receiver Modification required to stop oscillations in S,C and X-Bands L-Band Horn complete and in production Prototype OMT and receiver in lab testing Balanced amps from CDL in use on existing and prototype receivers S-Band Half scale horn built and currently being tested Receiver to be developed, CDL wideband amps now available Wideband OMT awaiting L-Band results – S-Band will use scaled down version C-Band Interim receiver in production (final receiver minus wideband OMT) OMT design complete - Awaiting L-Band results – C-Band will use scaled down version 12/27/2018 Jim Jackson EVLA Advisor Committee 8-9 May 2006

System Status Front-Ends X Band – Currently using existing VLA receiver New X-Band will be last to be developed – funding permitting Ku-Band New feed Horn to be developed New Receiver to be developed – will be based on K-Band design K-Band Using Existing VLA Feed and Receiver Added block converter and modified LO/IF chain In production Ka-Band Horn in production Receiver development underway Q-Band Using Existing VLA feed and receiver New MIMIC post amp and block converter 12/27/2018 Jim Jackson EVLA Advisor Committee 8-9 May 2006

System Status Front-Ends On-going issues L-Band Ortho-Mode Transducer – High Risk / High Priority Progress much slower than expected Affects availability of wideband L-Band receiver Also delays S-Band and C-Band – based on same design Delaying Front-end group progress on Ku/Ka band receivers Difficult to build, assemble and test Size and weight – difficult to maneuver Problems with Cooling May need to find new materials / fabrication techniques 12/27/2018 Jim Jackson EVLA Advisor Committee 8-9 May 2006

EVLA Advisor Committee Questions? 12/27/2018 Jim Jackson EVLA Advisor Committee 8-9 May 2006