1 Operations Management Layout Strategy. 2 What is Facility Layout Location or arrangement of everything within & around buildings Determines long-run.

Slides:



Advertisements
Similar presentations
7. Facilities layout.
Advertisements

Lean Office – Layout & Cells
Process Selection and Facility Layout
Operations Management Layout Strategy Chapter 9
9 Layout Strategies PowerPoint presentation to accompany
8–1. 8–2 Chapter Eight Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie Cook F O U R T H E D I T I O N Facility Decisions: Layouts © The McGraw-Hill Companies, Inc., 2003.
Process Selection and Facility Layout
1 IRWIN  a Times Mirror Higher Education Group, Inc. company, 1996 Facilities Layout.
9 - 1© 2011 Pearson Education 9 9 Layout Decisions PowerPoint presentation to accompany Heizer and Render Operations Management, 10e, Global Edition Principles.
9 Layout Decisions PowerPoint presentation to accompany
Location Strategy and Layout Strategy
Layout Strategy. Objectives of the Layout Strategy Develop an economical layout which will meet the requirements of: product design and volume (product.
Facility Layout Facility Layout Facility Layout decisions translate the broader decisions about a firm’s strategy such as competitive priorities, process,
1 Facility Layout. 2 What Is Layout Planning Layout planning is determining the best physical arrangement of resources within a facility Two broad categories.
Facility Layout 1. General Observations Facility Planning includes planning for: (1) the number of facilities and general facility type, (2) facility.
PRODUCTION AND OPERATIONS MANAGEMENT
Operations Management
Operations Management Layout Strategy Chapter 9
Layout Strategy. Introduction What – Layout Decisions Where – For efficiency or customer appeal Why – Improve Profitability.
© 2006 Prentice Hall, Inc.9 – 1 Operations Management Layout Decision © 2006 Prentice Hall, Inc. Sesi 6 – Henry Yuliando.
Session Pooja patnaik.
Operations Management Layout Strategy
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
System Design: Process Selection and Facility Layout Pertemuan 07 Mata kuliah: J Manajemen Operasional Tahun: 2010.
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc., Upper Saddle River, N.J Operations.
Chapter 10 – Facility Layout
MBA 8452 Systems and Operations Management
Layout Strategy.
Chapter 10 – Facility Layout
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e 9-1 © 2004 by Prentice Hall, Inc.,
Facility Layout Chapter 10 pages , ,
© Wiley 2007 Chapter 10 Facility Layout. © Wiley 2007 OUTLINE What Is Layout Planning? Types of Layouts Designing Process Layouts Special Cases of Process.
© 2008 Prentice Hall, Inc.9 – 1 Operations Management Chapter 9 – Layout Strategies Delivered by: Eng.Mosab I. Tabash Eng.Mosab I. Tabash.
1 Slides used in class may be different from slides in student pack Technical Note 6 Facility Layout  Facility Layout and Basic Formats  Process Layout.
Mba Facility Layout u Basic layouts u Some layout techniques u Assembly line balancing u Service Layout.
© The McGraw-Hill Companies, Inc., Technical Note 5 Facility Layout.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Manajemen Operasi Layout Akhir Matua Harahap. Layout Layout: (related to) –Capacity –Process –Flexiblity and cost –Quality of work life –Customer contact.
© 2006 Prentice Hall, Inc.9 – 1 Operations Management Chapter 9 – Layout Strategy © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e 9-1 © 2004 by Prentice Hall, Inc.,
Technical Note 6 Facility Layout
© The McGraw-Hill Companies, Inc., Technical Note 5 Facility Layout.
Chapter 6 Facilities Layout.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e 9-1 © 2004 by Prentice Hall, Inc.,
8 - 1 Chapter 8: Location Strategies Outline  The Strategic Importance of Location  Factors That Affect Location Decisions  Labor Productivity.
Chapter 9 : Layout Strategies
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Facility Layout Chapter 10 pages , ,
Operations Management
Chapter 7: Manufacturing Processes
Chapter 3 MANAGING THE TRANSFORMATION PROCESS
Facility Layout McGraw-Hill/Irwin.
Layout Strategies UNESCO-UNITWIN UUOOI-2015 Prepared by
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Layout Strategy.
SECTION 2 STRATEGIC DESIGN
9 Layout Strategies PowerPoint presentation to accompany
Cellular Layouts Cellular Production Group Technology
Facility Layout McGraw-Hill/Irwin.
Facility Layout Chapter 6A.
7 Layout Strategies PowerPoint presentation to accompany
FACILITY LAYOUT Facility layout means:
Chapter 6A Facility Layout 2.
9 Layout Decisions PowerPoint presentation to accompany
9 Layout Strategies PowerPoint presentation to accompany
Copyright ©2016 Cengage Learning. All Rights Reserved
Presentation transcript:

1 Operations Management Layout Strategy

2 What is Facility Layout Location or arrangement of everything within & around buildings Determines long-run efficiency of operations Helps achieve a strategy that supports differentiation, low cost or quick response

3 Strategic Importance of Layout Proper layout enables: Higher utilization of space, equipment and people Improved flow of information, materials, or people Improved employee morale and safer working conditions Improved customer/client interaction Flexibility to change-- use small, movable or modular equipment; etc

4 Layout Strategies Office layout positions workers, their equipment, and spaces/offices to provide for movement of communication and information Retail/service layout allocates shelf space and responds to customer behavior Warehouse layout addresses trade-offs between space and material handling

5 Seven Layout Strategies Fixed-position layout large bulky projects such as ships and buildings Process-oriented layout deals with low-volume, high-variety production (“job shop”, intermittent production) Product-oriented layout seeks the best personnel and machine use in repetitive or continuous production, line balancing

6 Office Layout Design positions people, equipment, & offices for maximum people and information flow, comfort and safety Relationship chart used Examples Banks Software company

7 Office Layout Floor Plan Accounting Manager Brand X Finance Fin.Acct.

8 Retail/Service Layout Design maximizes product exposure to customers Decision variables Store flow pattern Allocation of (shelf) space to products

9 Retail Layouts - Some Rules of Thumb Locate high-draw items around the periphery of the store Use prominent locations such as the first or last aisle for high-impulse and high margin items Distribute “power items” (items that may dominate a shopping trip) to both sides of an aisle, and disperse them to increase the viewing of other items Use end aisle locations because they have a very high exposure rate

10 A Good Service Layout Considers Ambient conditions - background characteristics such as lighting, sound, smell, and temperature. Spatial layout and functionality - which involve customer circulation path planning Signs, Symbols, and Artifacts - characteristics of building design that carry significance

11 Warehouse Layout Design balances between space utilization & handling cost Similar to process layout Items moved between dock & various storage areas Optimum layout depends on Variety of items stored Number of items picked

12 Fixed-Position Layout Design is for stationary project Workers and equipment come to site Complicating factors Limited space at site House, shipyard etc….

13 Process-Oriented Layout Design places departments with large flows of material or people together Department areas having similar processes located in close proximity e.g., All x-ray machines in same area Supports process-focused strategy i.e. product differentiation stategy

14 Emergency Room Layout Surgery Radiology E.R. bedsPharmacyBilling/exit Triage room E.R. Admissions Patient B – heart problems Patient A - broken leg Labs

15 Product-Oriented Layout Facility organized around product Design minimizes line imbalance Delay between work stations Types: Fabrication line; assembly line

Steps in Developing a Process-Oriented Layout 1 Construct a “from-to matrix” 2 Determine space requirements for each department 3 Develop an initial schematic diagram 4 Determine the cost of this layout 5 By trial-and-error (or more sophisticated means), try to improve the initial layout 6 Prepare a detailed plan that evaluates factors in addition to transportation cost

Cost of Process-Oriented Layout

Interdepartmental Flow of Parts

Interdepartmental Flow Graph Showing Number of Weekly Loads

Possible Layout 1

Interdepartmental Flow Graph Showing Number of Weekly Loads

Possible Layout 3

Assembly Line Balancing Analysis of production lines Nearly equally divides work between workstations while meeting required output Objectives Maximize efficiency Minimize number of work stations

Assembly Line Balancing The General Procedure Determine cycle time by taking the demand (or production rate) per day and dividing it into the productive time available per day Calculate the theoretical minimum number of work stations by dividing total task time by cycle time Perform the line balance and assign specific assembly tasks to each work station

Assembly Line Balancing Steps 1.Determine tasks (operations) 2.Determine sequence 3.Draw precedence diagram 4.Estimate task times 5.Calculate cycle time 6.Calculate number of work stations 7.Assign tasks 8.Calculate efficiency

AB EH C D F G I 10 Min Precedence Diagram Example

Assembly Line Balancing Equations Cycle time = Production time available Demand per day Minimum number of work stations  Task times Cycle time Efficiency = =  Task times * (Cycle time) (Actual number of work stations)

Cycle time calc. On the basis of precedence diagram and activity times given above, the firm determines that there are 480 productive minutes of work available per day. Furthermore, production schedule requires that 40 units be completed as output from the assembly line each day. Cycle time:480/40=12 minutes per unit Min no. of workstations:66/12=5.5 or 6

Six Station Solution AB C E D F G I H