Pilot considerations and pilot solutions Session 5 Presentation 2
Construction plan Availability of runways After hours availability of construction runway determine availability Ensure proper marking of construction sites Runway recall determine the time FOD ensure management plan implemented
Runway use Multiple runways Single runway shortened runway considerations: Obtain revised performance charts Use most suitable aircraft type Only use runways with approach slope guidance Single runway Entry /exit procedure training
Traffic Management Flow capacity Adapt the aircraft type for capacity Use any extended airport operating hours Arrivals and departures control ground hold better airborne holding Arrival and departures ATC requirements additional holding fuel
Weather X wind aircraft type suitable for expected conditions carriage of alternate fuel
Not common considerations Use of new aircraft type crew familiarization
THANK YOU