EETD Environmental Health and Safety Monthly Metrics October, 2013.

Slides:



Advertisements
Similar presentations
OSHA Most Frequently Cited Serious Violations
Advertisements

Fall Protection Standard 29 CFR Part
Health Hazards in Construction
Job Hazard Analysis I. Speaker’s Notes:
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
1 DOE Safety Committee Handbook. 2 Effective Safety Committee! Make it work for you!
The 5S numbers game..
EETD Environmental Health and Safety Monthly Metrics April, 2014.
EETD Environmental Health and Safety Monthly Metrics March, 2014.
Site Safety Plans PFN ME 35B.
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
EETD Environmental Health and Safety Monthly Metrics July, 2013.
Loading and Unloading Students
Hershey Entertainment and Resorts Company
Module 2: General Working Conditions 2.1 Housekeeping & Slips, Trips, & Falls Susan Harwood Grant Number SH F-23.
EETD Environmental Health and Safety Monthly Metrics December, 2013.
EETD Environmental Health and Safety Monthly Metrics August, 2013.
EMS Checklist (ISO model)
Red Tag Date 13/12/11 5S.
1. 2 Earthquake effects on health care facilities 2.
Hazardous Waste Section
What to look for, What to correct, How it should look,
2.01 Understand safety procedures
Module 6: Safety At the HIV Rapid Testing Site. Lab workersHealth workersCounselors 2 The Lab Quality System Process Control Quality Control & Specimen.
1 HR Presentation Living Sky School Division No. 202 October 26 th, 2010.
EETD Environmental Health and Safety Monthly Metrics June, 2013.
EETD Environmental Health and Safety Monthly Metrics December, 2012.
EETD Environmental Health and Safety Monthly Metrics August, 2014.
Module 2 Worksite Inspection Checklist Days to a Safe and Healthy Workplace - Days 6-10.
EETD Environmental Health and Safety Monthly Metrics September, 2014.
EETD Environmental Health and Safety Monthly Metrics April, 2013.
EETD Environmental Health and Safety Monthly Metrics February, 2013.
EETD Environmental Health and Safety Monthly Metrics June, 2013.
EETD Environmental Health and Safety Monthly Metrics March, 2013.
ETA Environmental Health and Safety Monthly Metrics November, 2014.
EETD Environmental Health and Safety Monthly Metrics November, 2013.
EETD Environmental Health and Safety Monthly Metrics February, 2014.
EETD Environmental Health and Safety Monthly Metrics October, 2014.
EETD Environmental Health and Safety Monthly Metrics January, 2013.
ETA Environmental Health and Safety Monthly Metrics December, 2014.
ETA Environmental Health and Safety Monthly Metrics March, 2015.
Safety First: Facility Safety Inspections “Reginald C. Reese VP, Safety and Risk Management.
EETD Environmental Health and Safety Monthly Metrics May, 2014.
EETD Environmental Health and Safety Monthly Metrics June, 2014.
ETA Environmental Health and Safety Monthly Metrics February, 2015.
ETA Environmental Health and Safety Monthly Metrics April, 2015.
PELLET PLANT LAY DOWN TRAFFIC MANAGEMENT POLICY COMMUNICATION.
ETA Environmental Health and Safety Monthly Metrics January, 2015.
Health and Safety Laws, Compliance Assistance Don Williams Illinois Department of Commerce and Community Affairs.
EETD Environmental Health and Safety Monthly Metrics January, 2014.
1 EETD SAFETY TOPICS FEBRUARY 28, 2013 Laboratory Area Housekeeping Awareness.
EETD Environmental Health and Safety Monthly Metrics September, 2013.
ETA Environmental Health and Safety Monthly Metrics June, 2015.
EETD Environmental Health and Safety Monthly Metrics July, 2014.
ETA Environmental Health and Safety Monthly Metrics July, 2015.
ETA Environmental Health and Safety Monthly Metrics May, 2015.
Mini 10-Hour Course Standards You Need To Know. OSHA’s Philosophy An effective workplace culture should value safety and health Employers should establish.
ETA Environmental Health and Safety Monthly Metrics August, 2015.
ETA Environmental Health and Safety Monthly Metrics September, 2015.
1 Hazard Assessment Evaluation of a work place for potential hazards.
1. 2 Hazard Assessment 3 Your accident rates or injury rates will be reduced by being pro-active in Hazard Assessment.
ETA Environmental Health and Safety Monthly Metrics October, 2015.
ETA Environmental Health and Safety Monthly Metrics November, 2015.
Ferris State University & Michigan Department of Career Development 1 Hazard Assessment.
ETA Environmental Health and Safety Monthly Metrics December, 2015.
ETA Environmental Health and Safety Monthly Metrics February, 2016.
ETA Environmental Health and Safety Monthly Metrics March, 2016.
ETA Environmental Health and Safety Monthly Metrics May, 2016.
CIHQ - All Rights Reserved 2017
Presentation transcript:

EETD Environmental Health and Safety Monthly Metrics October, 2013

EETD Accidents- 10/13 TypeDateDept.DescriptionSeverityStatus No EETD accidents reported in October

EETD Accidents- By Type

EETD Accidents- Severity Note: Two accidents in Nov 12 not considered OSHA reportable, but may be compensable

Emergency Incidents- 10/13 DateIncidentAreaStatus No EETD incidents reported in October

Ergonomic Assessments- By Month

Open EETD Ergonomic Assessments Date Requested Dept.TypeStatus 8/26/13DIVDiscomfortActions Pending

EETD Job Hazard Analysis (JHA)- Pending New Hire vs. Expired Metric Started Sep 13

Job Hazard Analysis- % Completion

EETD Incomplete Training Assignments * Does not include SEC0203 External Monitoring Notice

Training % Completion Status

Incomplete Training by Course Type (Total Incomplete Assignments = 92)

Incomplete Training Assignments (Total = 92) Open Assignments by Dept.Open Assignments by Hire Date

EETD Incomplete Training Assignments

SAA Overall Compliance

SAA ISSUES

Cumulative SAA Issues (FY Q1 12 – Q1 14)

Safety Concerns Submittals- EETD

EETD Safety Concerns Status #DateConcernTypeStatus 6426/21/13Very loud in Some sort of issue with room ventilation EnvironmentOpen- Facilities Work Request 9249/12/13B90 lobby steps do not have code compliant hand rails and step tread surface slippery FireOpen- Fire Marshall determine old code 9259/12/13Bicycles improperly stored on Shuttle bus bike racks. Bike could fall off. TrafficOpen- Institutional 9269/18/13Near miss slip incident reported by employee walking on painted walk in B50 lot. Mud from street sweeper. Slip/TripOpen- Institutional 9279/20/13Near miss incident when subcontractor truck nearly hit employee using painted walk in B50 lot. TrafficOpen- Institutional 9299/26/13Vehicles parking on unmarked roadway near B90 loading dock. Fire truck access blocked. Extend red painted curb. TrafficOpen 9449/27/13Employee riding on bicycle on Chu Road near roundabout cut off road by passing flat bed truck. TrafficOpen- Institutional 96210/22/13Storage of old equipment in Building 70/70A breezeway. Could block egress in emergency. Fire SafetyOpen 96310/25/13Door stop in conference room could be activated from hallway and lock people inside room. Needs replace Building Maint.Open 10/31/13Trip hazard in Bevetron parking lot. Temporary fence footings jutting into pedestrian walkway near stairs. Slip Trip FallOpen- Institutional

Corrective Action Reports (CATS)- 10/13 CAT #DateDescriptionLeadStatus /27/13Remove orphan chemicals and samples from lab areas R. ScholtzCompleted /27/13Damaged cords and outlets in Building 90 S. SynarskiCompleted /27/13Daisy chaining of outlets strips in Building 90 S. SynarskiCompleted /27/13Lack of outlets/use of extension cords in B90. S. SynarskiCompleted /27/13Non-NRTL equipment in Building 90 R. ScholtzDue- 3/27/14. Self assessment findings.

Activity Hazard Documents (AHD)- 10/13 AHDDescriptionStatusLocationPI No AHD activity in October

Audits and Inspection Status- 10/13 TypeDateLeadStatus SAA quarterly inspection 10/29/13R. ScholtzCompleted

Significant Safety Achievements- 10/13 The 2014 EETD Self-Assessment Plan was completed. Developed division safety performance review guidelines. Completed Satellite Accumulation Area (SAA) inspections. Completed major old chemical sample clean-outs of the and lab areas. Cleaned out a number of old chemicals in Building New door hazard placards were posted at all Building 70 lab areas reflecting the new Building Manager and other updates. Assisted personnel in updating their JHAs and training to reflect new electrical safety requirements. An EETD Safety Committee meeting was held on 10/3/13.

Short Term Safety Outlook- 10/13 Assist with safety planning for the FLEXLAB start-up. Assist with safety planning for the battery testing facility location at the Richmond Field Station. Finalize work with Facilities on the noise issues in Implement a new electronic lab inspection form for easier monthly lab area inspection documentation. Start the Personal Protective Equipment self-assessment project. Assist with the continued lab moves in Buildings 62 and 70. Finalize the next old chemical pick-up by Waste Management. We have 400 containers waiting in lab areas.