G0 PC Installation and Beam Studies

Slides:



Advertisements
Similar presentations
Source Outlook High polarization strained-layer photocathodes were activated in both electron guns during the summer shutdown, with usual QE (0.2% at 850.
Advertisements

CEBAF Photoinjector: What’s new, what’s the same since HAPPEx 2004? What needs to be done? M. Poelker, HAPPEx collaboration meeting, Feb. 18, 2005.
Parity Quality Beam (PQB) April 07, Notes: 1.For each BPM, the wires are: +X+, +X-, +Y+, +Y- 2.There are only two injector BPMs we are not reading:
R. Michaels PVDIS at Nov 2009 Beam Requirements for PVDIS Property ValueRun-Avg Hel. Correl. 1-Day Hel. Correl. Energy 6 and 4.8 GeVdE/E < 1 ppm < 5 ppm.
G 0 PC Installation and Beam Studies June & July 2006 Stephanie Bailey Riad Suleiman.
Bill White Drive Laser April 16, Drive Laser Commissioning Experience Reminder of requirements on Drive Laser.
ExperimentEnergy (GeV) Pol (%) I (µA) TargetA pv (ppb) Maximum Charge Asym (ppb) Maximum Position Diff (nm) Maximum Angle Diff (nrad) Maximum Size Diff.
ExperimentEnergy (GeV) Pol (%) I (µA) TargetA pv (ppb) Maximum Charge Asym (ppb) Maximum Position Diff (nm) Maximum Angle Diff (nrad) Maximum Size Diff.
Electronic Cross-talk & Ground Loop Elimination in Injector Riad Suleiman Center for Injectors and Sources.
PQB Photocathode Analyzing Power Study May 19, 2009.
JLab Polarized Source Happex Collaboration Meeting May 18, 2007 P. Adderley, J. Brittian, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
PAVI ’06 Milos May 20, 2006 Kent Paschke – University of Massachusetts Controlling Helicity-Correlated Asymmetries in a Polarized Electron Beam Kent Paschke.
Polarized Source Development Run Results Riad Suleiman Injector Group November 18, 2008.
Real-time Parity Feedback John Hansknecht & Riad Suleiman April 28, 2009.
Diana Parno – July 22, 2008 January PREx Test Run: Compton Photon Analysis Diana Parno Carnegie Mellon University HAPPEX Collaboration Meeting.
Parity Quality Beam (PQB) Study Injector Group November 10, 2008.
Hall A Parity Workshop (May 10, 2002), 1 Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson.
Collimator June 1-19, 2015HUGS The collimator is placed about 85 cm from the target and intercepts scattered electrons from 0.78° to 3.8° Water cooled.
Linear Equations Complete the table: xy
Polarisation.
Short Tutorial on Causes of Position Differences… …and what we can do about them (most slides stolen from Cates PAVI ’04 talk)
Polarized Injector Status QWeak Collaboration Meeting February 1, 2010 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman, R. Suleiman,
Operated by Jefferson Science Associates, LLC for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Polarized Electron Beam.
ExperimentEnergy (GeV) Pol (%) I (µA) TargetA pv (ppb) Maximum Charge Asym (ppb) Maximum Position Diff (nm) Maximum Angle Diff (nrad) Maximum Size Diff.
Probing Hadron Structure at CEBAF Using Polarized Electron Scattering M. Poelker, Jefferson Lab APS Meeting, Dallas, TX, April 2006 Structure Functions,
1 G9a -FROST. 2 Experiments FROST New generation of CLAS photoproduction experiments with FROzen Spin Polarized Target (FROST) E02-112: γp→KY (K + Λ,
Parity Quality Beam (PQB) Study Injector Group September 2008.
Autocollimator Calibration
Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 Updates G0 Tiger Laser High Polarization Photocathodes Mott polarimeter.
Helicity Magnets Commissioning February 7, 2007 Hari Areti, Chao, Brad Cumbia, Jeff Dale, Richard Dickson, Joe Grames, Roger Flood, Scott Higgins, Matt.
G 0 PC Installation and Beam Studies Stephanie Bailey Riad Suleiman.
Source Systematics PITA - type effects The importance of controlling the analyzer-axis –Two Pockels cells –Half-wave plate Position asymmetries –Lensing.
Injector Status & Commissioning QWeak Collaboration Meeting May 24, 2010 P. Adderley, J. Clark, S. Covert, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
Parity Experiments and JLab Injector Riad Suleiman February 5, 2016.
CEBAF Source and Injector Status PREx-II Collaboration Mtg Feb. 26, 2016 Matt Poelker and Joe Grames Center for Injectors and Sources.
G 0 Project Coordinator Report Joe Grames “Big Picture” Schedule Preparations Polarized Source Injector Accelerator Hall C Accelerator Plans for 687 MeV.
Operated by Jefferson Science Associates, LLC for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Polarized Electron Beams.
Continuous Electron Beam Accelerator Facility Polarized e-Source - Talking Points for PV experiments: P. Adderley, M. BastaniNejad, J. Clark, S. Covert,
Progress in CLIC DFS studies Juergen Pfingstner University of Oslo CLIC Workshop January.
Parity Quality Beam (PQB) B-Team Meeting September 10, 2008.
Polarized Injector & Upgrade Schedule QWeak Collaboration Meeting November 06, 2009 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Polarized Injector Update
Parity Violation Experiments & Beam Requirements
with help from Riad Sulieman, Arne Freyberger, and Joe Grames
A Mini-Primer for Parity Quality Beam (as seen from the Accelerator)
G0 Backward Angle Accelerator Preparations
Parity Violation Experiments at JLEIC
Parity Quality Beam (PQB)
Magneto-Optic Kerr Effect in a Magnetized Electron Gun
Thoughts on why G0 needed position feedback and HAPPEX didn't
Thoughts on why G0 needed position feedback and HAPPEX didn't
QWeak Collaboration Meeting
G0 PC Installation and Beam Studies
Polarized Source Development Run Results
Bubble Chamber Readiness Review
Adiabatic Damping and Parity Quality of Low Energy
Feedback Systems Joe Grames Hall A Parity Meeting Jefferson Lab
PIs: Riad Suleiman and Matt Poelker
Injector Studies Using Superlattice Photocathode
Helicity Magnets for PQB Feedback Helicity Magnets for PZT Booster
Status of Instrumental Beam Studies and Technical Description of Detectors and DAQ February 24, 2017.
Polarized Source: Recent Activities
Bubble Chamber Experiments at UITF
G0 PC Installation and Beam Studies
MEIC Polarized Electron Source
Spot-Size Reduction 4/5/2017.
Injector Commissioning & Optimization
Generation of Magnetized Bunched Electron Beam for MEIC Cooler
Presentation transcript:

G0 PC Installation and Beam Studies January 2007 Stephanie Bailey Riad Suleiman

Pockels Cell Installation January 2, 2007 What did we accomplish? Commission the PC translational Stage. These are the x & y of the PC that minimize the position differences for each IHWP state: IN: x=0, y=90 mils OUT: x=70, y=90 mils Aligned Pockels Cell (PC) Degree of linear polarization = 3.24% Degree of circular polarization = 99.95% Minimized x and y position differences.

Pockels Cell Installation January 2, 2007 Steering (LP OUT) IHWP IN IHWP OUT Goal Δx -0.0137 ± 0.0186 µm -0.0674 ± 0.0204 µm < 0.1 µm Δy -0.0101 ± 0.0139 µm 0.0625 ± 0.0150 µm Δcharge 8.476 ± 2.311 ppm 4.133 ± 2.461 ppm Birefringence (LP IN) IHWP IN IHWP OUT Goal Δx 5.63 ± 0.0195 µm -13.22 ± 0.0198 µm < 6 µm Δy -11.09 ± 0.0116 µm 12.29 ± 0.0119 µm Δcharge -31230 ± 96 ppm 31940 ± 96 ppm Electrical Pickup PC OFF Δx 0.0034 ± 0.0052 µm Δy -0.0056 ± 0.0029 µm Δcharge 4.46 ± 0.63 ppm Injector Happex Δx < 0.3 µm Δy Δcharge w/ photocathode 3X larger in injector w/ photocathode 20X smaller in injector

Electron Beam Studies January 3, 2007 PITA=0 PITA=-180

Electron Beam Studies January 3, 2007 RHWP=170° RHWP=170°

Electron Beam Studies January 3, 2007 IHWP = IN RHWP = 170° -17 ppm/V IHWP = OUT RHWP = 170° 15 ppm/V