Yasuhiro Okada, Executive Director, KEK

Slides:



Advertisements
Similar presentations
ILCSC Report KILC12 / Daegu Jonathan Bagger Chair, ILCSC Johns Hopkins University 4/23/12.
Advertisements

European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
LCC status Lyn Evans 1April 18, 2015PAC Orsay. ILC in Linear Collider Collaboration 2 ICFA Chair: J Mnich Program Adv. Committee PAC – Chair: N. Holtkamp.
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
The ILC Global Design Effort Barry Barish ILC Industrial Forum Japan 28-June-05.
GDE expectations from the SRF community Barry Barish Cornell SRF Mtg 15-July-05.
Status of International Linear Collider Global Design Effort Barry Barish (by telecon) HEPAP Washington DC 18-May-05.
Review of last year: Global Design Effort Barry Barish ILC Consultations URA, Washington DC 12-May-05.
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
ECFA European Committee for Future Accelerators ECFA ACTIVITIES Lenny Rivkin, EPFL & PSI CHIPP Plenary meeting Fribourg, 30 June – 2 July, 2014.
Atsuto Suzuki. 2 Japan Policy Council Second Recommendations: Regional Development through Creation of Global Country inside Japan Realizing a global.
LCB/ICFA meeting at Newport News with full snow, February This is only for TB meeting Presentation and not for Distribution. ( )
MEXT Review Process in Japan 2014/7/16 Y. Sugimoto 1.
Organizing the Linear Collider. Steps toward the ILC 1989 – 1996: Operation of the world’s only linear collider, the 90 GeV SLC at Stanford Linear Accelerator.
J. Mnich for Pier Oddone | ICFA Report to Lepton Photon 2013 June 28, 2013 | Page 1 ICFA Report to Lepton Photon 2013 J. Mnich (for Pier Oddone, ICFA chair)
Status of Linear Collider Activities Rika Takahashi on behalf of the LC Communicators 104 November, 2013 Interactions US.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
ILC Accelerator Status Lyn Evans, CERN, Imperial College London 1A. Yamamoto, LCB ILC Acc. Status.
Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities.
1 1 LCC Physics and Detector Hitoshi Yamamoto ECFA LC2013, DESY May 27, 2013.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
The International Linear Collider and the Future of Accelerator-based Particle Physics Barry Barish Caltech Lomonosov Conference 20-Aug-2015 ILC.
The time line Autumn 2011CERN Council initiated an update exercise to the European Strategy for Particle Physics which was approved by a special Council.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
ILC in Japan A 10 minute introduction H.Weerts Argonne National Lab March 24, 2014 University of Chicago.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
HEPResearchers Set-up JLCB and JLCC ~6 Cite Decision Design ILC Lab. Japan Policy Council Positive Reference from New Prime Minister.
THE INTERNATIONAL COMMITTEE FOR FUTURE ACCELERATORS (ICFA) Roy Rubinstein2nd International Conference on New Frontiers in Physics - 4 September
1 SPAFOA Capitol Hill Briefing December 2013 Harry Weerts International Linear Collider - progress & status SPAFOA meeting, Dec 11, 2013, H.Weerts.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
1 GUTs and Branes DESY Theory Workshop 2003 A brief introduction to the future of particle physics at DESY Albrecht Wagner Hamburg, 23 September 2003.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Nick Walker AD&I WebEx Meeting TeV Upgrade Study AD&I WebEx Meeting Nick Walker 1 Brief summary of ALCPG’11 discussions.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
23-April-13 ECFA LC2013 Global Design Effort 1 Barry Barish ECFA LC2013 DESY Hamburg, Germany 27-May-13 GDE The path to a TDR.
Glion Colloquium / June Accelerating Science and Innovation R.-D. Heuer, CERN HL-LHC, Aix-les-Bains, 1 Oct ECFA HL-LHC Experiments Workshop.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
Hitoshi Yamamoto, 2-Oct Detector Tohoku Forum for Creativity - a Pilot Program - ‘Particle Physics and Cosmology after the Discovery of the Higgs.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
The Situation in Japan Yasuhiro Okada, Executive Director, KEK ILD meeting 2014 September 7, 2014, Oshu-city, Iwate, Japan 1.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
ICFA J. Mnich (DESY) November 5, J. Mnich | ICFA LCWS Panel Discussion 5 November 2015 | page 2 ICFA Web Page and Mandate ICFA: International Committee.
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
The Status of the ILC Project in Japan
The Status of the ILC Project in Japan
ILC Accelerator Activities in Japan
LCC L. Evans, Santander, 2nd June 2016
ILC - Upgrades Nick Walker – 100th meeting
Mike PAC Charge & Agenda ALCW15 Plenaries CERN SPC – September 2014
ICFA and the Linear Collider
ICFA Report to C11 August 2016 to August 2017 J. Mnich (DESY)
ILC project Status Yasuhiro Okada (KEK) ILC detector meeting
ILC Status in Japan ECFALC M.Yamauchi KEK June 02, 2016
ILC Decision Timeline in Japan (KEK/JAHEP) and Asian LC overview
ICFA Report to ICHEP 2016 August 2015 to August 2016 J. Mnich (DESY)
Annual ILC detector meeting K. Kawagoe (Kyushu)
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
ICFA Report Lepton-Photon 2017
Report from ICFA ICFA mission and membership ICFA Panels ICFA and ILC
Sun Yat-Sen University, Guangzhou, China
Snowmass on the Mississippi
FALC report and KEK’s plan for the ILC
Barry Barish JSPS - Sendai 12-Sept-11
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

Yasuhiro Okada, Executive Director, KEK ILC Status: General Yasuhiro Okada, Executive Director, KEK 2014 Joint Workshop of the TYL/FJPPL & FKPPL Particle Physics Laboratories May 27, 2014, Bordeaux, France

ILC as a Global Project R&D for a future e+e- linear collider was started more then 20 years ago in three regions. By early 2000’s , it became a consensus among the world HEP community that an e+e- linear collider with the CM energy of about 500 GeV should be the next collider beyond the LHC. ICFA chose the cold technology for LC as a global project, and set up a global team (GDE) for design and coordination of R&D for the ILC.

TDR completed: The LCC succeeded the GDE After eight years of works, the TDR of the ILC was published in June 2013 under the leadership of the GDE Director, Barry Barish. ICFA set up the Linear Collider Collaboration headed by Lyn Evans.

ILC TDR Layout e+ Main Linac Damping Rings Polarised electron source Ring to Main Linac (RTML) (including bunch compressors) e+ Main Linac e- Main Linac Parameters Value C.M. Energy 500 GeV Peak luminosity 1.8 x1034 cm-2s-1 Beam Rep. rate 5 Hz Pulse duration 0.73 ms Average current 5.8 mA (in pulse) E gradient in SCRF acc. cavity 31.5 MV/m +/-20% Q0 = 1E10 E+ source A. Yamamoto, 2014/05/12

ILC Physics case is even stronger after the discovery of a Higgs particle The Higgs particle becomes a tool to explore New Physics. July 4, 2012 Expected precision of the Higgs coupling determination Results taken from Snowmass 2013 study

Z’ LHC ILC ILC Various opportunities for direct and indirect New Physics search at the IILC Z’ effect Top anomalous coupling Z’ Snowmass 2013 study Snowmass 2013 study SUSY GUT SUSY DM LHC Baer, List ILC ILC Taken from the L-T Wang’s result at AWLC14

ILC efforts in Japan In October 2012, after the discovery of a Higgs –like particle, the Japanese HEP community proposed a phased execution of the ILC hosted in Japan as a global project. Impacts of this statement The European Strategy for Particle Physics Update 2013: May 2013

AsiaHEP/ACFA statement on the ILC project: September 2013 AsiaHEP/ACFA welcomes the proposal by the Japanese HEP community for the ILC to be hosted in Japan. AsiaHEP/ACFA looks forward to a proposal from the Japanese Government to initiate the ILC project. ICFA statement on the progress towards an ILC in Japan: February 2014 US P5 report (draft) : May 2014

ILC Time Line: Progress and Prospect Preparation Phase Expecting ~ (3+2) year since (middle) 2013   We are here, 2014 A. Yamamoto, 2014/05/12 AWLC14

ILC Status A.Suzuki, May 2014, FNAL TDR February 6, 2014 August, 2013 September 26, 2013 TDR September 28, 2013

MEXT Task Force Review by Science Council of Japan Review Issues Particle・Nuclear Physics WG Academic Experts Committee TDR Validation WG February 6, 2014 May 8, 2014 TDR Validation Value Estimation for Quake-Proof Value Estimation for Environmental Improvement Total Value Estimation Clarification of ILC Physics Review Issues 2013 2014 2015 2016

Action Plan toward before Construction in 2014 Further Action Plan before Construction 2012 2014

Further Action Plan before Construction 2014 2015 2016 2017 2018 Engineering R&D Schedule (LCC-PreLab) Pre-construction Schedule (LCC-PreLab)

Further Action Plan before Construction 2014 2015 2016 2017 2018 Engineering R&D Schedule (LCC-PreLab) Pre-construction Schedule (LCC-PreLab) Staging Scenario (LCB, LCC) Lab Design: Organization, Structure (LCB, LCC) CERN EU XFEL Procurement Legal Base Personnel ITAR ILC ITER LCB WG (Feb. 2014~) PIP & PDG

Further Action Plan before Construction 2014 2015 2016 2017 2018 Governmental Negotiation Preparatory Phase Decision-Making Site-Dependent Value (LCC-LCB-PreLab) Value-Sharing Model Host Others CFS - LAND ??? % Instrument - Electricity Maintenance/Labor Detector

3. Summary Further Action Plan before Construction ① ② ③ ④ ⑤ ⑥ ⑦ ⑧ ⑨ Site-Dependent Value A.Suzuki, AWLC 14