Make sure your PEFS are Up-to-Date

Slides:



Advertisements
Similar presentations
Always start a vehicle correctly
Advertisements

Always use proper handles of the pipe spinner
PDO Safety Advice Date: LTI: Amputated finger
Beware of hazards around you
Ensure a safety briefing is given where appropriate
PDO Second Alert What happened? Your learning from this incident..
No Removal of cellar frames by hands
Injury: Fall from height
LTI: Fractured forearm
Always ensure the right tools are used for the task
PDO Second Alert Date: Incident : LTI What happened?
Comply with Safe Operating Procedures
PDO Second Alert Valves open Valve closed Valves open Valve open
Don’t pull a twisted sling
Maintain 3 point contact when you climb Ladder
LTI: Multiple fractures Always follow the Safe Journey Management Plan
Always think to use hands off technique.
Use right tools for the job and use them correctly
PDO Second Alert Date: Incident type: LTI What happened?
Always wear fall protection equipment when working at height
Ensure a working platform is adjusted and used
Follow Management of Change for an activity which is not in permit
PDO Second Alert Date: Incident: LTI What happened?
PDO Second Alert Date: Incident: LTI What happened?
Keep away form ‘line of fire’
Keep away from “Line of Fire”
PDO Safety Advice What happened
Always use the correct tools for the job
Always use the right equipment for the task !!!!
PDO Second Alert Date: Incident Type: LTI What happened?
No hands on elevator while delivering pipe
Never put your Hands in line of fire
LTI: Finger Crush Injury Hands off suspend loads “Use Tagline”
Always observe safe pedestrian zones
PDO Second Alert What happened? Your learning from this incident..
Beware of Fall hazards while working at edge of trailer
PDO Second Alert Photo explaining what was done wrong
Safety Critical Devices can Save the Lives & Protect Asset
Always keep your fingers away from pinch points
Stay out of the “Line of Fire”
Keep a safe distance and expect the unexpected
Always use the right equipment for the task
PDO Second Alert Date: Incident title: HiPo Asset Damage
Keep your hands in a safe position
Ensure safety devices are working prior to starting work
Never place yourself in “line of fire”
Always use your hands to set the slips
Ensure that all Rig moves are carried out by competent personnel
Always stay away from line of fire
LTI: Ring finger injury
Tubing hanger must always be assembled in horizontal position.
PDO Second Alert What happened? Your learning from this incident..
When operating the Tongs under tension, make sure all crew keep clear
PDO Second Alert Date: Incident title: HiPo What happened?
Your health is your responsibility
Check equipment prior to start the job
PDO Second Alert Photo explaining what was done wrong
Be aware of potential pinch points
Always keep your hands and fingers away from the Line of Fire
Always keep your equipment maintained
PDO Second Alert What happened? Your learning from this incident..
Always isolate equipment before beginning maintenance tasks
Check Level Setup prior Lifting & Lowering Operation
Use the correct lifting device for the load
Keep away from “Line of Fire”
Only perform tasks under your responsibility
Gas test before welding
Drive as per the road condition
Keep away from the line of fire
Beware of raised edges of walk ways.
Presentation transcript:

Make sure your PEFS are Up-to-Date PDO safety advice Date: 08.12.2016 Incident type: AIPS & LTI What happened? Bahja Gathering station was recently by passed and the Operations team were preparing for the facility to be Decommissioned. When the team proceeded with depressurizing the Gas section the Flare KOD vessel ruptured and exploded injuring the operator. It was a closed valve in the flare line after this low pressure vessel resulted in pressure build up, followed by rupture, explosion and fire. Your learning from this incident… Align LO/LC register with PEFS and ensure compliance with 3-month and 6-month checks & audit. Preparatory activities for Decommissioning to be Planned Method statement prepared Risk assessment done Actual site conditions verified with drawings Walk the line Necessary resources and interfaces be identified and confirmed Photo explaining how it should be done right Always “Walk the line” Make sure your PEFS are Up-to-Date

Management actions Date: 08.12.2016 Incident type: AIPS & LTI As a learning from this incident and to ensure continual improvement all contract managers must review their HSE HEMP against the questions asked below Confirm the following: Do management carry out their assurance checks even when the asset is out of use? Are all Safety critical valves clearly identified and in the maintenance plan Do all operators return systems to as before after any task