CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Higgs Factory, HF2014 at IHEP, 2014 Oct. 101Eiji Kako (KEK, Japan) High Power Couplers for Higgs Factory Eiji KAKO (KEK, Japan)
30 th September 2004 High Power RF Couplers James Rogers High Power RF Couplers ELSRF Daresbury Laboratory.
Progress and Plan for Superconducting RF Cavity RF Group.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
324MHz FETS RFQ RF measurement and components By Aaron Cheng 18 December 2006.
Status of 325MHz coupler S. Kazakov 11/29/ MHz coupler structure.
SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, The RF Power Coupler Development Program at LAL-Orsay and.
Coupler without copper coating S. Kazakov 11/13/2013.
TDR Part 2: 3.3 Cavity Integration (10 pages) H. Hayano Baseline Design based on the meeting discussion.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Zenghai Li SLAC National Accelerator Laboratory LHC-CC13 CERN, December 9-11, 2013 HOM Coupler Optimization & RF Modeling.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
Status of the Fermilab Cold BPM R&D Manfred Wendt Fermilab 10/1/20091LCWA09 Main Linac WG.
704MHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL July 8, 2015 LEReC Warm Cavity Review Meeting  July 8, 2015.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
IHEP High Power Input Coupler Activity Report First Mini-workshop on IHEP 1.3 GHz Superconducting RF project June 10th, 2009, Beijing IHEP High Power Input.
LCLS-II Power Coupler Nikolay Solyak, Ivan Gonin, Andrei Lunin C.Adolphsen - SLAC TTC meeting, March 23-27, 2014 AWLC2014, FNAL, May 12-16,
KEK R&D for LHC Plan of 800MHz Cavity Calculation of 400MHz Cavity 16 th September 2009, LHC-CC09 at CERN K.Nakanishi.
LCWS13 at Tokyo, 2013 Nov. 121Eiji Kako (KEK, Japan) Status of STF2 Input Couplers Eiji KAKO (KEK, Japan)
1.3GHz Input Coupler for ILC
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
LCLS-II FPC Aluminum Waveguide Box Karen Fant with work done by Chris Nantista and Ken Premo 6/24/2015.
Shuichi NoguchiHayama ILC Lecture, Part III ILC BCD Cavity  Maximum Use of Potential Performance  Maximum Use of each Cavity Performance 
2.1 GHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL June 15, 2015 LEReC Warm Cavity Review Meeting  June 15, 2015.
5 K Shield Study of STF Cryomodule Norihito Ohuchi, Norio Higashi KEK Xu QingJin IHEP 2008/3/3-61Sendai-GDE-Meeting.
20 years of high average Fundamental Power Coupler designs at CERN CWRF workshop 2014, Trieste Eric Montesinos, CERN-RF, on behalf of many colleagues CWRF.
Cavity Measurements By Aaron Cheng 4 May Overview RF measurements Waveguide-coax transition.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
LCLS-II Couplers and Related R&D Chris Adolphsen WWFPC, CERN June 23, 2015.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
 =1 cavity: parameters Dimensions for cavity fabrication before any chemical polishing and at room Temp. outer ½ cell pick-up side inner ½ cells outer.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
MAIN LINAC CRYOMODULE DESIGN REVIEW INPUT COUPLER September 5, 2012V. Veshcherevich.
13/Nov/ mm STF2 Coupler Design Content 1.Motivation 2.40mm Design 3.“Preliminary” Result by HFSS 4.“Tentative” Conclusion 5.Future.
Detail plan of S1-Global H. Hayano (KEK),
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Specification Table 23 Oct 2007 FNAL Lutz Lilje DESY.
Plug compatibility discussion TILC09 cavity integration session H. Hayano.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
Power couplers Timergali Khabiboulline (FNAL) FNAL-LBNL meeting on NGLS April 13, 2012.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
HiLumi-LHC/LARP Crab Cavity System External Review 5-6 May 2014, BNL SPS - RF Power and Coupler status Erk Jensen, Eric Montesinos, CERN BE-RF.
Overview of CW input coupler for ERL
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
TDR guideline discussion on Cavity Integration
CW couplers; KEK injector couplers Eiji Kako (KEK, Japan)
ILC-SCRF Test Facilities considerations
Power Couplers, HOM Couplers and Tuners for the XFEL
Power coupler at DESY & for XFEL
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
List of changes and improvements for the next generation CLIC module
World Wide Fundamental Power Coupler meeting #3
SNS Fundamental Power Coupler History
Modified TTF3 Coupler Design and Related R&D for LCLS-II
V. Veshcherevich Cornell University
Main Coupler R&D at DESY
The report of CEPC 650MHz Coupler in 2016
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
DQW HOM Update and Recent Developments
CEPC-650MHz Cavity Cryomodule
V. Veshcherevich Cornell University
Cryomodule Design for CW Operation 3.9 GHz considerations
SNS Coupler Shipping Plans
Higher power couplers at Helmholtz-Zentrum Berlin
Presentation transcript:

CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting Ma Q., Huang T.M. 2017-7-14

Index Requirement of CEPC FPC Concept design of 650MHz Coupler Design of 1.3GHz Coupler

Requirements of CEPC FPC Main ring Booster Frequency (GHz) 0.65 1.3 Power (kW) 300 (400 update?) 10 Coupling (Qext) Variable: 1E5~2E6 Variable: 4E6~4E7 2 K heat load (dynamic300kW,TW,CW) 1 W 0.3 W Assembly Clean assembly of coupler to cavity in class 10 clean room

Concept design of 650MHz coupler The length of coupler in the cryomodule Variable coupling Change outer conductor length Change inner conductor length Change inner conductor length, Bellow on 1/4 λ shorter port ( LHC Type ) Single window or Double windows

Concept design of 650MHz coupler The length of coupler in the cryomodule As the inner diameter is 1300, the length of coupler (window and vacuum coax ) is less than 460. The short vacuum coax line leads the difficulty of heat- load controling. If use the rectangular module, the length of coupler is not a problem. Maybe it's a another choice. FPC coupler port Beam Pipe cryomodule inner surface

Variable coupling Usually,Changing the penetration depth of the antenna tip to adjust the Qext. Calculation shows the length of change is about 30mm.

Variable coupling Change outer conductor length, like TTF coupler. TTF-III coupler

Variable coupling Move the window to change the outer conductor length. Bellow needs special cooling. otherwise the temperature will be over 400K. Remove the length of window (~120) and bellow(~220), the length of coax line is too short for heat insulation(<120). This design need fatter cryomodule or rectanglar crymodule. fixed by WG window water cooling bellow fixed by Cavity move window 5K 80K 300K

Variable coupling Change inner conductor length, like ATF coupler or KEK-STF coupler . ATF coupler STF coupler

Variable coupling Add bellow on inner conductor. Bellow cooling: water or air? Water cooling: bellow corrosion by water? air: insufficient cooling? Easier heat load control. Need more heat simulation. window Bellow coolingpipe move antenna tip 5K 80K 300K

Variable coupling Change inner conductor length, Bellow on 1/4 λ shorter port ( LHC Type ) The ONLY variable coupler operating above 300kW CW in the world. LHC Type need rectanglar Cryomodule. It is a future design or not? LHC coupler

Single window or Double windows Avoid polution when ceramic was broken. Expensive. More complex, more trip rate. Single window Maybe 1~3 module were poluted when ceramic was broken. And long period was spent for changing the module. Cheaper and simpler.

Single window or Double windows transmission line waveguide win Vacuum transmission line warm win Difficult to cooling in big CW power cold win win Cavity Cavity X ?

Collabration of 650MHz Coupler Collabration on concept design and simulation.

Design of 1.3GHz Coupler Finished the RF design and mechanical rough design. Doing heat simulation now. RF model of CEPC booster cavity FPC

Collabration of 1.3GHz Coupler Collabration on design and Power test. Hope to test the coupler in KEK in late 2018. Prepare the coupler and vacuum connect waveguide( if the connect flange is not same ) (IHEP) Prepare the power source, low level controller and interlock system (KEK) The details of test could be discussed later.

Thanks