AIXM CCB meeting EUROCONTROL HQ, Brussels

Slides:



Advertisements
Similar presentations
FIXM – What’s it all about?
Advertisements

FIXM Breakout Introduction
Delivering Digital Services A-CDM extension to FIXM v2.0 FIXM Break-out session Presented By: Carlos FORNAS FERNANDEZ & Hubert LEPORI, EUROCONTROL Date:August.
The European Organisation for the Safety of Air Navigation WXXM, December 2012 Dennis Hart Senior Aviation Meteorology Expert EUROCONTROL
June 2014 Jan Van Meenen 1 SWIM Standards. SWIM Definition 2 SWIM standards infrastructure Governance ATM Information Qualified parties Services SESAR.
Delivering Digital Services FIXM - Flight Information Exchange Model Presented By: Rob Hunt Manager, FAA, Air Traffic Organization, Technical Analysis.
Delivering Digital Services SESAR AIRM Status Report Presented By: Hubert LEPORI EUROCONTROL Date:August 26, 2014.
Integrating information towards Digital ATM FIXM – Flight Information Exchange Model Presented By: Richard Jehlen Director, FAA, Air Traffic Organization,
AIXM 5.1 Seminar 12 – 13 December 2011
Integrating information towards Digital ATM Information Structures - AIXM - Presented By: Eduard Porosnicu, Eurocontrol Date:August 27, 2013.
International Civil Aviation Organization SAM Regional Seminar/Workshop Tom Brady ICAO Air Navigation Bureau May Flight Plan Implementation and.
Aeronautical Information Exchange Model (AIXM). Introduction “Never let an aircraft take you somewhere your brain didn't get to five minutes earlier”
AIRM Review Forum #2 Monday 12 th September 2011 Eurocontrol, Brussels Welcome by Joe Gorman, NATMIG/SINTEF, Norway CCB Chairman 1.
UNCLASSIFIED 1 Digital Geospatial Information Working Group (DGIWG) Jeffrey Bell – NGA Aeronautical Harmonization Working Group Chair Briefing to AIXM.
The European Organisation for the Safety of Air Navigation OGC Aviation DWG - Bonn Hubert LEPORI EUROCONTROL – DSR/CMN/IM 01-March-2011.
AIXM - purpose, scope, implementation and future evolution.
Workshop on How to Publish Data in VO ESAC, June 25-June Tips & tricks by the Ivoa Document Coordinator Bruno Rino
E-Government Initiative Geospatial Information One-Stop FGDC Coordination Group January 10, 2002 John Moeller.
Work Plan Work Plan Management (Document 21)
© GEO Secretariat Work Plan Management Update GEO Work Plan Symposium 30 April – 2 May 2012.
FIXM briefing for the AIXM CCB Hubert LEPORI EUROCONTROL, ATM/STR/SWM
Introduction to Digital NOTAM
5-7 DEC 2016, EUROCONTROL HQ, Brussels
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
AIXM-FIXM-iWXXM coordination
AIXM 5.1 – Metadata AIXM CCB – Webex 18 JULY 2017.
AIXM 5.1 – Interoperability issues
Workshop on preparations for ANConf/12 − ASBU methodology
Implementing the Surface Transportation Domain
FIXM – What’s it all about?
Workshop on preparations for ANConf/12 − ASBU methodology
Messaging support FIXM 4.0 Guidance Materials
Mini Global Demonstration
FIXM – GUFI Manfred Beckmann (SOLITEC)
AIXM 5.1 – Interoperability issues
AIXM 5.1 – Interoperability issues
AIXM 5.2 – WIP AIXM CCB – Webex 09 MaY 2017.
Work Plan Management GEO Work Plan Symposium 30 April – 2 May 2012
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
AIXM CCB meeting EUROCONTROL HQ, Brussels
AIXM 5.1 – Interoperability issues
Recommending a Strategy
Fast Track Maintenance Process (for existing messages)
AIXM 5 Overview xNOTAM Workshop #2 Brussels, November 2007
AIXM 5 Development Status
[draft] Conclusions, actions & next steps
Yearly Maintenance Process (for existing messages)
AIXM 5.2 – WIP AIXM CCB – Webex 26 July 2018.
EPAN - eGovernment EPAN Administrative Framework
WG GES Workshop Art. 8 MSFD Assessment
AIM Global Strategy Air Navigation Procedures for AIM Seminar
P. Cruellas EUROCONTROL DSR SWIM/EA Unit
AIXM 5.1 – Interoperability issues
Proposal of a Geographic Metadata Profile for WISE
SAM Regional Seminar/Workshop
Eddy Porosnicu EUROCONTROL
[draft] Conclusions, actions & next steps
30 NOV – 01 DEC 2017, Eurocontrol, Brussels
Introduction to Digital NOTAM
AIXM CCB – Webex 24 January 2017
Meeting of Water Directors Progress on Reporting and WISE
Eddy Porosnicu EUROCONTROL
5.b3 Monitoring & Reporting 2019
AIXM 5.2 – WIP AIXM CCB – Webex 26 APR 2018.
ICAO AIRM briefing for the AIXM CCB Scott WILSON
AIXM scripts and plannning
AIXM 5.2 – WIP AIXM CCB – Webex 29 March 2017.
AIXM 5.2 – WIP AIXM CCB – Webex 10 OCT 2017.
AIXM CCB – Webex 28 FEBRUARY 2017
Presentation transcript:

AIXM CCB meeting EUROCONTROL HQ, Brussels FIXM Briefing AIXM CCB meeting EUROCONTROL HQ, Brussels Hubert LEPORI EUROCONTROL 07-June-2017

Previous briefings What is FIXM? FIXM History FIXM Change Management Technical talking points Dec 2016 FIXM 4.1.0 deprecations FIXM 4.1.0 references to aeronautical info FIXM 4.1.0 ICAO AIRM coordination FIXM 4.1.0 Extension mechanism Dec 2017 FIXM Briefing

FIXM Documentation Package Today’s briefing FIXM 4.1.0 is released! FIXM Documentation Package Next FIXM developments (FIXM 4.2.0) Some FIXM questions / unknowns Misconception about FIXM Today FIXM Briefing

FIXM 4.1.0 15-Dec-2017 https://www.fixm.aero/fixm_410.pl FIXM Briefing

FIXM Briefing

Content not tied to a FIXM version Developed & endorsed by FIXM CCB Reviewed by ICAO ATMRPP FIXM Briefing

Strategic requirements driving the FIXM project FIXM components FIXM in the SWIM big picture … https://www.fixm.aero/documents/FIXM%20Strategy.pdf FIXM Briefing

Organisation of the FIXM Community Operating procedures of the FIXM Change Control Board Membership rules Equivalent to & inspired by the AIXM charter https://www.fixm.aero/documents/FIXM%20Change%20Management%20Charter.pdf FIXM Briefing

ICAO FF-ICE & SWIM milestones (quotes) Planned released dates & objectives for next FIXM Core versions Planned released dates & objectives for FIXM extensions (developed by CCB) FIXM version policy (the one agreed with AIXM CCB) https://www.fixm.aero/documents/FIXM%20Release%20Plan%20v1.1.pdf FIXM Briefing

Content tied to a FIXM version Developed & endorsed by FIXM CCB FIXM Briefing

Entry point to a given FIXM version For FIXM 4.1.0: https://www.fixm.aero/releases/FIXM-4.1.0/FIXM_Core_v4_1_0_Primer.pdf

FIXM Briefing

Rulebook for designing FIXM Core Rulebook for designing FIXM Extensions For FIXM 4.1.0: https://www.fixm.aero/releases/FIXM-4.1.0/FIXM_Core_v4_1_0_Modelling_Best_Practices.pdf FIXM Briefing

Catalogue of flight data elements supported by the FIXM version Traceability between the FIXM model elements and the requirements from ICAO For FIXM 4.1.0: https://www.fixm.aero/releases/FIXM-4.1.0/FIXM_Core_v4_1_0_Operational_Data_Description.pdf FIXM Briefing

General guidance for the implementation of FIXM Guidance for the implementation of FIXM in support of FF-ICE/1 Requirements on FIXM core usage Requirements on FIXM extension usage Validation approach for FIXM General FIXM encoding rules Geographical position References to aeronautical info … Role of FIXM in support of FF-ICE Examples of FF-ICE/1 Services Implementations (Planning, Filing) Guidance for the implementation of FIXM to encode existing FPL, as a precursor towards FF-ICE/1 FIXM XML Samples FIXM Briefing

Let’s open the document and have a look at… 2.2.2. What is considered a valid FIXM core usage? 2.4.1. Use of FIXM schema profiles 2.5.3. References to published aeronautical information 3.3. Building examples of FF-ICE/1 Realization through FIXM-Based Services 3.5. Filing Service – Example of realisation 4.3. ATS Message Content to FIXM Logical Model Map 5.3. FIXM Samples of ATS Messages for a Full Flight Life-Cycle FIXM Briefing

FIXM 4.2.0 30-Jun-2019 Next FIXM version FIXM status update

Next FIXM version – FIXM 4.2.0 May version of the FF-ICE/1 Implementation guidance Q4 2018 version of revised (draft) ICAO Doc 9965 2018 ATMRPP WG/33 ATMRPP/4 2019 J F A M S O N D FIXM Workshop FIXM Workshop? FIXM Workshop? Start of the 4.2.0 development Official FIXM 4.2.0 FIXM 4.2.0 ALPHA FIXM 4.2.0 BETA FIXM 4.2.0 RC1 Final FIXM Implementation guidance Iteration 1 based on Iteration 2 based on Main thread Analyse ATMRPP’s FF-ICE/1 Implementation guidance and improve FIXM accordingly Messaging & Absent data FIXM Implementation guidance Complementary thread Testing activities / V&V Using ALPHA Using BETA Using RC1 Correct bugs FIXM status update

Link to ICAO ATMRPP’s FF-ICE Roll-out and communication strategy Work underway FIXM Briefing

FIXM questions / unknowns in relation to FF-ICE From a user perspective, should the FF-ICE transaction elements be technically harmonized? If yes, which elements? If yes, how to achieve this? As an FF-ICE Message Model building on FIXM? As a component of FIXM core? As a dedicated FIXM extension? From a user perspective, what is the impact of not harmonizing (technically) any messaging elements? ICAO ATMRPP/IMP/CP task force addressing FF-ICE impl. over SWIM FIXM Briefing

LAST BUT NOT LEAST WRONG ! Common misconception: FIXM does not use GML so FIXM is not interoperable with AIXM WRONG ! Conceptually ISO19107 Same reference! LAST BUT NOT LEAST FIXM and AIXM understand and encode geometries in the same way !!! Technically [FIXM 4.1.0] <fx:point4D srsName="urn:ogc:def:crs:EPSG::4326"> <fb:pos>56.84 -29.860000000000003</fb:pos> …   [AIXM 5.1] <aixm:ElevatedPoint srsName="urn:ogc:def:crs:EPSG::4326" gml:id="pTEMPO"> <gml:pos>56.84 -29.860000000000003</gml:pos> Equivalent structures! One-to-one mappable! FIXM Briefing

Contact details FIXM Community FIXM Secretariat: fixm.secretariat@eurocontrol.int FIXM CCB: FIXM.CCB@eurocontrol.int FIXM Online Resources www.FIXM.aero FIXM Work Area (register here) Cross-XM Coordination Common -XM work area FIXM Briefing

FIXM Briefing