Fundamentals of Production Planning and Control

Slides:



Advertisements
Similar presentations
Capacity Management Planning the resource capacity that a firm will need to meet its demand.
Advertisements

Strategic Decisions (Part II)
Operations Management Contemporary Concepts and Cases Chapter Twelve Capacity Planning Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
IES 371 Engineering Management Chapter 14: Aggregate Planning
3. Aggregate Planning. Aggregate Planning  Provides the quantity and timing of production for intermediate future Usually 3 to 18 months into future.
Chapter 12 Aggregate Planning.
PRODUCTION AND OPERATIONS MANAGEMENT
Sales and Operations Planning CHAPTER THIRTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Aggregate Planning.
WEEK 11A – [S&OP] AGGREGATE PLANNING (CHAPTER 13) Planning levels (long, intermediate and short ranges and real time control); Planning & Control Model;
Reid & Sanders, Operations Management © Wiley 2002 Aggregate Planning 13 C H A P T E R.
1 Introduction to Operations Management Aggregate Planning CHAPTE R 12.
Manufacturing’s Objectives
Chapter 8 Aggregate Planning in a Supply Chain
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning Delivered by: Eng.Mosab I. Tabash Eng.Mosab I. Tabash.
Aggregate planning 1 Aggregate planning / scheduling Medium range plan - what we will make over the next 3-18 months. –general demand –controllable variables.
Chapter 9 Capacity Planning 2000 by Prentice-Hall, Inc.
Operations Planning Horizons
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operations Planning Operations Management - 6 th Edition.
OPIM 204 – Aggregate Planning 1 Aggregate Planning OPIM 3104 Instructor: Jose Cruz.
Aggregate Planning and Resource Planning Chapters 13 and 14.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Operations Management
Aggregate Planning.
1 OMGT 4743/6743 Aggregate Production Planning (APP) Matches market demand to company resources Plans production 6 months to 12 months in advance Expresses.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning PowerPoint presentation to accompany Heizer/Render Principles of.
Aggregate Planning Chapter 13. MGMT 326 Foundations of Operations Introduction Strategy Managing Projects Quality Assurance Facilities & Work Design Products.
Operations Management Aggregate Planning
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Chapter 13 Aggregate Planning.
Chapter 10 Sales and Operations Planning (Aggregate Planning)
14-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
© 2007 Pearson Education Sales and Operations Planning.
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
14-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Visual 3-1 Sales and Operations Planning Purpose of Sales and Operations Planning General Design of Sales and Operations Planning Approaches to Sales and.
9 Sales and Operations Planning: Planning Supply and Demand in a Supply Chain.
LESSON 2 Sales and Operations Planning (S&OP) and Aggregate Planning
OPERATIONS MANAGEMENT: Creating Value Along the Supply Chain,
Sales and Operations Planning
SALES AND OPERATIONS PLANNING AGGREGATE PLANNING PRODUCTION PLANNING OPERATIONS PLANNING How to meet effectively and efficiently forecasted requirements.
Planning Supply and Demand in a Supply Chain
McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Aggregate Planning Chapter 13.
Chapter 14 Aggregate Planning.
13 Aggregate Scheduling PowerPoint presentation to accompany
Operations Management
Basic Strategies Level capacity strategy: Chase demand strategy:
Facilities and Aggregate Planning
Chapter 8 Aggregate Planning in the Supply Chain
13 Aggregate Planning.
Chapter 8 Aggregate Planning in the Supply Chain
9 Sales and Operations Planning: Planning Supply and Demand in a Supply Chain.
Beni Asllani University of Tennessee at Chattanooga
Chapter 8 Aggregate Planning in the Supply Chain
Sales and Operations Planning
Dr Sh Salleh bin Sh Ahmad
Aggregate Planning and S&OP
13 Aggregate Scheduling PowerPoint presentation to accompany
Production and Operations Management
(Aggregate) Production Planning
Manufacturing’s Objectives
Aggregate Production Planning (APP)
Presentation transcript:

Fundamentals of Production Planning and Control Chapter 3 Sales & Operations Planning

S&OP necessary to coordinate activities among departments Hiring new medical salespersons causes increased sales If using a chase strategy, low production can be used for training programs New product introductions need capital and production time to inventories

Strategies for meeting objectives of S&OP Internal Strategies External Strategies

Internal Strategies Hire/fire workers Temporary workers Overtime/slack time Subcontracting Inventory Backlog Do not meet demand Change production rates Hire and Fire – As the name implies, this strategy focus on altering the number of workers. Temporary workers – In some industries, this alternative is becoming increasingly popular. Overtime/slack time – The overtime alternative has been common in many companies for a number of years. Recently, companies in some environments are recognizing that it occasionally may be a wise move to continue to keep and pay workers, but to not expect them to produce product unless there is demand for that product. Subcontracting – Also called “outsourcing” in some environments, this option has also become popular in some companies in recent years. Basically, it means that the company will contract with a supplier or other contractor to produce some or all of a required output. Inventory – This is a very common option in manufacturing companies. Basically, the implication is that inventory will be produced during time of low demand and used to meet demand during times of high demand. Backlog – As the name implies, this means the company will take the customer order even if it does not have inventory or capacity to meet the immediate demand, but will promise delivery when capacity is available. Do not meet demand – Again, as the name implies, this options means the company will simply decline to take a customer order if they do not have the inventory or capacity to meet the order requirements. Change production rates – This option is rarely used, since it has a potentially negative impact on the workers. It implies the capability to slow down or speed up the rate of production. It can potentially have a negative impact on both morale and output quality.

External Strategies Pricing Promotions Advertising Reservations “Package” offerings Pricing – As the name implies, this involves changing the price of the product or service. Generally, lowering price will increase demand while raising prices will decrease demand. Promotions – Offering special incentives (“rebates”, for example) are occasionally used to increase demand. Advertising – A very common strategy used to increase customer awareness and increase demand. Reservations – Often used when capacity is scarce or very expensive (such as in some restaurants, in doctor’s offices, dentist’s offices, etc.), this approach smoothes demand, allowing both better customer service and more effective utilization of the scarce or expensive resource. “Package” offerings – A special type of promotion, the package offers tend to link popular items with less popular items to smooth the overall demand.

Tools for S&OP Optimization techniques Computer simulation Simulating with a spreadsheet Optimization techniques can be used to find an optimal combination of products to maximize profits It is difficult to model complex environments Takes a high skill level – use at Ohio Edison Computer simulation can be used to simulate the production environment in a computer simulation Requires simulation software and expertise Difficult to build an appropriate model. Simulating with a spreadsheet Difficult to build but can be reused

Objective of S&OP Plan for and coordinate resources, including type, quantity, and timing Operations Marketing/Sales Product Development Finance Information Technology Human Resources.

Other Names Aggregate Planning Production Planning Staffing Planning

Level of Aggregation Aggregate products that have similar processes Markets Product Family Aggregate to common unit of measure Units Dollars Common Raw Material Labor Hours Aggregate along family lines Common unit of measure that can be understood by top management and used by middle management Dollars Common raw material Labor hours Forecasts are more accurate in aggregate

Opposing Objectives Meet all customer demand on-time Minimize inventory investment Maintain steady workforce

Human resource needs Number of people Skill level Timing of need Hiring/firing Overtime Temporary workers Skill level Timing of need Training programs Use times of slow production for training

Sales and marketing activities Sales promotions Advertising Pricing New product introductions Expansion of markets Reservations for service industry

S&OP Inputs Output Strategic Plan Forecasts Business Plan Usually expressed in dollars May be part of the budget cycle Stated in dollars to guide the finances of the organization

3.1 Determine type, quantity, and timing of resources Inventory levels Cash flow Human Resource Needs Capital needs Production outputs Capacity Planning Sales and marketing activities

3.2 Design of S&OP Aggregate demand along family lines 23” bearings v. 60” bearings can be in hours or tons Forecasting is important in identifying the demand factors can impact this aggregation / forecast

Things to Decide Time horizon Time buckets Level of aggregation Time horizon – time needed to make acquire additional resources Bricks & Mortar could be several years Service industry may be weeks or months depending on skill level of employees needed Time buckets– aggregate as much as possible to the point where useful resource plans can be made. Aggregate along family lines Common unit of measure that can be understood by top management and used by middle management Dollars Common raw material Labor hours Forecasts are more accurate in aggregate Aggregation

3.3 Approaches to S&OP Primary focus is to establish decisions about… sales volumes service levels production rates inventory levels Make-to-stock view Make-to-stock - identify inventory levels Make-to-order - identify backlog level

3.4 Strategies for S&OP Develop the plan mathematical calculations can work are sometimes clumsy and expensive simulate the environment simulate the demand using computer models Find the best trade-off approach

Inventory levels... Level strategy Chase strategy Combination strategy

Level Strategy

Level Strategy

Chase Strategy

Example: Chase Strategy Use strategies to alter demand rates Use workforce changes to meet demand Carry little inventory (or none in a service industry) (must be used in a service industry)

Example: Chase Strategy ABC Company is considering its S&OP for the next four quarters. The CEO has decided that “inventory is bad” and therefore, as a company you should be carrying little to no inventory. The following costs have been identified. See Problem 1. Problem 1a

Example: Chase Strategy Number of employees 30 Production Rate 100 Units per month Subcontract Cost $30 additional cost per unit Hire Cost $3,000 per employee Fire cost $5,000

Combination Strategy

Time Horizon If considering capital needs could be several years Service could be months or years depending on the skill level involved

Time buckets Aggregate as much as possible to the point where useful resource plans can be made Could use weeks or months in short term plan Maybe years for longer term planning

Example: Chase Strategy Consider the option of hiring and firing employees to meet demand.

Example: Chase Strategy Consider subcontracting production to maintain a steady workforce.

Example: Level Strategy Maintain level workforce Carry inventory to cover periods of high demand

Example: Level Strategy ABC Company has decided that they would like to consider carrying inventory. They could hire a set of workers at the beginning of the year and then build inventory. See Problem 2. Problem 1b

Qualitative Issues Affect strategy will have on workforce Affect strategy will have on customers Forecast error

Affect strategy will have on workforce Layoffs impact moral Hiring new employees doesn’t payoff overnight Psychological affect of Temporaries

Affect strategy will have on customers Backorders Not accepting orders

Forecast error Must provide “wiggle room” in terms of capacity Buffer inventory, buffer capacity

Homework Problems 8, and 9 Use an Excel Spreadsheet – don’t do calculations by hand Don’t wait until the last minute – this takes some time ,