University of Wisconsin-Madison

Slides:



Advertisements
Similar presentations
R. Lee CMS EMU Alignment: 28 Feb, COCOA Simulation and Study of the EMU Alignment System Robert Lee CMS Endcap Alignment Muon EDR 28 February 2002.
Advertisements

1 James N. Bellinger 4-Feb-2009 ME+1 status and Endcap Z James N. Bellinger University of Wisconsin at Madison 4-Feb-2009.
Skeleton: Hardware Alignment for EMU meeting James N Bellinger 15-Mar-2009.
Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara Dean White.
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
Upgrade news and Proposed interventions during YETS for the Muon Barrel Alignment Szillási Zoltán, Béni Noémi (ATOMKI ) This project is supported by Hungarian.
1.Check Laser track of B=0 run and exclude some tracks in order to get precise GGV eff, which in turn is used when extract T1, T2 value by pos-B and neg-B.
Analysis of Metrology Data from First Two Small Disks Stephen Pate 5/11/111.
Status of the Alignment 17/12/04 Dario Autiero. Measurements taken so far: 13/9 TT8 On the mounting arch 12/11 TT7 Standalone in the target 19/11 TT7.
Goal : Setup and monitor “chambers” with resolution of < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line 1 Transfer Line 1 Transfer Plate.
Goal : Setup and monitor “chambers” with resolution of  < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line (2 Laser Redundancy) 1 Transfer.
First Reconstruction Results on the Alignment of Muon Endcap Chambers in the CMS Experiment at CERN S. Guragain, G. Baksay, M. Hohlmann Florida Tech 74.
Partial Disassembly of the alignment devices on each ME11transfer plate, ME1/1 chamber and ME1/2 chamber. (6 on +Z and 6 on –Z side of the CMS)
Hand Crosscheck HSLM1. Position of REF DCOPS CENTER MAB Target DM distance DMdowel to DCOPS dowel DCOPS dowel to center.
1 James N. Bellinger University of Wisconsin-Madison 27-November-2009 Status of Transfer Line Reconstruction James N. Bellinger 27-November-2009.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, Endcap Alignment Status of Offline Software Alignment CERN 17, 18 May 2001.
November 11 SESAPS 2006 Samir Guragain 1 Calibration, Installation & Commissioning of Sensors for the Alignment of Muon Endcap Chambers in the CMS Experiment.
Chamber Alignment Pins Δy = y PG – y nom. vs. Δx = x PG – x nom. M. Hohlmann 1, G. Baksay 1, S. Guragain 1, J. Bellinger 2, D. Carlsmith 2, F. Feyzi 2,
Alignment Meeting, CERN, Sept 19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field.
1 James N. Bellinger University of Wisconsin-Madison 2-February-2011 Status and Plans for Endcap Hardware Alignment James N. Bellinger 2-February-2011.
1 James N. Bellinger University of Wisconsin-Madison 13 February 2008 Cocoa Plans.
1 James N. Bellinger University of Wisconsin-Madison 13-August-2010 Endcap Processing Notes James N. Bellinger 13-Aug-2010.
EMU Meeting, CERN, Sept 18-19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field up.
1 James N. Bellinger University of Wisconsin-Madison 25-February-2011 Z-sensor News James N. Bellinger 25-February-2011 Good news this time!
1) News on the long scale length calibration 2) Results of the two surveys performed on plane 7 Set 1: morning of 12/11/2004 Set 2: morning of 19/11/2004.
Status VELO alignment 1.NIKHEF 3D measurements 2.Photogrammetry 3.Calliper checks in x-direction 4.Photogrammetry again Jo van den Brand May 23, 2006.
1 James N. Bellinger University of Wisconsin-Madison 15-March-2009 Hardware Alignment.
1 James N. Bellinger Robert Handler University of Wisconsin-Madison 11-Monday-2009 Laser fan non-linearity James N. Bellinger 20-March-2009.
PIXEL ladder alignment Hidemitsu ASANO. Photo analysis & survey beam data (with zero magnetic field) ① SVX standalone tracking Global Tracking Strategy.
1 James N. Bellinger University of Wisconsin-Madison 19-Feb-2010 Status of Transfer Line Reconstruction James N. Bellinger 19-February-2010.
Patch Testing. HYSWEEP ® Calibration of a Multibeam System Patch Testing Single and Dual Head Multibeam Systems. Patch Testing Single and Dual Head Multibeam.
James Bellinger, December CMS Week Muon Alignment James N. Bellinger University of Wisconsin at Madison 5-December-2006 DCOPS Data from MTCC2.
Performance of the Iris diaphragm laser alignment system of the SPring-8 C. Zhang JASRI / SPring-8 IWAA2014, October 13-17, 2014, IHEP, Beijing.
University of Wisconsin at Madison
Relative alignment of LXE and DCH using AIF
Muon Alignment: Organization
EMU Alignment DAQ Endcap Alignment Muon Alignment EDR Feb. 28, 2002
Validating Magnets Using Beam
University of Wisconsin-Madison
University of Wisconsin-Madison
Status of Transfer Line Reconstruction University of Wisconsin-Madison
Status and Plans for Endcap Hardware Alignment
Transfer Line and CSC Rφ Reconstruction
Plus Endcap Transfer Lines
Status of Transfer Line Reconstruction University of Wisconsin-Madison
DCOPS Readout before and during MTCC
University of Wisconsin at Madison
James N. Bellinger 1-November-2007
Validating Transfer Line Fit University of Wisconsin-Madison
Starting from the Basics
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
Comparing Laser Fit to Barrel Fit University of Wisconsin-Madison
University of Wisconsin-Madison
Status of Transfer Line Reconstruction University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
CMS Week Muon Alignment
Transfer Line Calculations
University of Wisconsin at Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
Presentation transcript:

University of Wisconsin-Madison Transfer Line Fits James N. Bellinger University of Wisconsin-Madison 26-March-2010 James N. Bellinger 26-March-2010

Contents Determine that my transfer plate centers are better than Dave’s Hand fits give me something to validate Cocoa with James N. Bellinger 26-March-2010

Whose TP centers are better? Fit a set of SLMs with Dave’s and with my transfer plate centers at 0T Find alignment pins positions wrt the disk Compare with PG of pins wrt disk Select ME-2 and ME-3 since I did not test them before James N. Bellinger 26-March-2010

Alignment pin PG looks OK Alignment pins outline the SLMs neatly. One not measured James N. Bellinger 26-March-2010

CMS X comparison X_mine-X_PG mean 0.1mm RMS 1.1mm X_dave-X_PG ME-2/SLM2 fits poorly for Dave’s #’s. Excluded here. James N. Bellinger 26-March-2010

CMS Y and Z comparison Y_Dave-Y_PG Mean 1.2mm RMS 2.6mm Y_Mine-Y-PG dZ is different: clumpy; but note that my clumps are tighter James N. Bellinger 26-March-2010

Conclusion My calculated TP centers clearly result in better fits, even if the Cocoa model is not perfect Note that the Cocoa model does not account for the different chamber distances from the SLM: these need to be introduced by hand James N. Bellinger 26-March-2010

Reason for Z “clumps” Cross section of SLM Cocoa model has all chambers in the same plane: Wrong but easily fixed up. SLM line 248mm Chambers are at different distances from the SLM laser James N. Bellinger 26-March-2010

How Did I Generate Positions? V direction Zsensor H direction SLM DCOPS Transfer DCOPS Center of TP is here Simple and short translation from target to center Three PG targets on top of DCOPS James N. Bellinger 26-March-2010

Hand Fit Comparison I create 12 independent fits for the transfer lines 2 for each transfer line, in the H and V directions (illustrated in next slide) native to the transfer line coordinate system 0T data from June 2009: Oleg pointed me to a range and a BFI search found some good data: no profiles, unfortunately James N. Bellinger 26-March-2010

Transfer Line Coordinate system V direction CMS Y H direction Transfer plate “X” direction varies with position CMS X James N. Bellinger 26-March-2010

Hand Fits Illustration Transfer Line 1 Horizontal (Rphi) coordinate Fit for two laser beams and offsets for each DCOPS Position is wrt center of Transfer Line Blue points are raw data Black are fit positions Distance between points is invariant with fit CMS Z (mm) James N. Bellinger 26-March-2010

Changes in Cocoa Model Single Transfer Line Fix DCOPS internals Fix DCOPS mounts Fix disks Widen TP error James N. Bellinger 26-March-2010

Offsets for Line 1 MAB calcs not readily comparable yet Station dX (mm) Cocoa Hand fit dY (mm) ME+3 2.07378 2.520 -5.58365 -6.072 ME+2 2.06415 2.474 -4.66432 -5.098 ME+1 1.00499 1.220 -5.41692 -5.732 MAB+3 1.32987 3.855 -3.47646 21.982* MAB+1 -2.30884 3.528 0.357306 25.469* MAB-1 -1.29895 4.907 -2.51285 -0.214 MAB-3 1.74611 4.546 -0.113382 1.540 ME-1 1.02517 0.893 -5.25257 -5.361 ME-2 1.16804 1.462 4.50519 4.383 ME-3 0.11244 -0.040 3.85222 4.062 MAB calcs not readily comparable yet James N. Bellinger 26-March-2010

First pass at residuals No cuts on quality yet 570 microns for this, 440 if exclude point at -3 Residuals still far too large, but agreement with hand fit says we’re on the right track. James N. Bellinger 26-March-2010

Conclusions Cocoa reproduces the Endcap part of the hand fit successfully Possibly better, since it includes beam fan tilt instead of using averages More work required on MAB: different sizes If continue to get agreement, this will validate the Cocoa calculation James N. Bellinger 26-March-2010

Plans Re-expand scope of fit Find MABs I can use to constrain the lines Check MABs for consistency If agree, calculate Transfer Plate positions in X and Y Review SLM models with Himali, and generate chamber positions Converge on a plan for Z Generate chamber Z and angles James N. Bellinger 26-March-2010

BACKUP James N. Bellinger 26-March-2010

Predicting MAB positions 34.78 MAB center to MAB sensor center (fixed) 2736.35 Radial lever arm: center to DCOPS (fixed) -33.14 MAB sensor center to target (fixed) -6698.93 -6694.2 -6694.74 -6694.49 -6691.12 -6693.94 MAB center in Z -0.003264 -0.003333 -0.003403 MAB y-angle rotation -6706.2214 -6701.6803 -6693.1 -6692.85 -6689.48 -6701.6118 Predicted target position -6671.4414 -6666.9003 -6658.32 -6658.07 -6654.7 -6666.8318 My predicted MAB center -23.480 16.328 29.950 23.078 36.226 20.019 How far from ideal is rear? -24.743 13.167 27.616 26.346 47.551 24.589 How far from PG is rear estimate? Try working backward -10487.737 -10485.839 -10486.666 -10492.268 -10500.325 -10493.57 Rear TP from photogrammetry -10519.287 -10517.389 -10518.216 -10523.818 -10531.875 -10525.12 Distance to IP side of TP4 -9629.771 -9628.595 -9629.196 -9631.867 -9644.918 -9635.249 To IP side of TP3 -8018.672 -8017.435 -8019.927 -8023.371 -8035.466 -8024.924 To IP side of TP2 -6887.060 -6885.315 -6888.109 -6891.053 -6903.913 -6893.197 To IP side of TP1 -6681.478 -6678.050 -6683.246 -6683.125 -6698.899 -6690.420 Estimating MAB target gives 24.743 23.630 9.854 9.725 -9.419 11.192 Estimated MAB-found MAB James N. Bellinger 26-March-2010