1 AirBase developments and EoI2005 reporting cycle Patrick van Hooydonk and Wim Mol European Topic Centre on Air and Climate Change (ETC/ACC) under contract.

Slides:



Advertisements
Similar presentations
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Advertisements

Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 BANK PROFITABILITY (BP) PROGRESS REPORT Working Party on Financial Statistics Paris 2,3 October 2007 D. Campion STD/NAFS OECD.
Vienna, | Slide 1 EUROPEAN ENVIRONMENT AGENCY EUROPEAN TOPIC CENTRE ON WATER Quality of Groundwater in Europe Vienna, 22 June 2005 Andreas Scheidleder.
UNITED NATIONS Shipment Details Report – January 2006.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
FY 2006 Lincoln Trail Libraries System Budget & Work Plan May 24, 2005.
1 Reportnet – an introduction Reportnet – an introduction Presentation for the Meeting on Noise Copenhagen, 12 November 2008 Søren Roug, EEA
Event, date: Reporting of SoE biology, Author: Jannicke Moe (NIVA) 1 Agenda item 2: Practical information for reporting of State-of-Environment.
1 Limitations of current air quality data in Europe? Frank de Leeuw Real time pollution data exchange and forecast in Europe Copenhagen, 7-8 April 2005.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Making the System Operational
1 AirBase DEM training Wim Mol, Libor Cernikovski, Patrick van Hooydonk European Topic Centre on Air and Climate Change (ETC/ACC)
ZMQS ZMQS
Richmond House, Liverpool (1) 26 th January 2004.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
ABC Technology Project
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Linking AirBase with geo-info Future developments of air quality information system AirBase Wim Mol European Topic Centre on Air and Climate Change (ETC/ACC)
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Session 2 – WISE SoE TCM data processing and quality issues.
Addition 1’s to 20.
25 seconds left…...
School Census Summer 2011 Headlines Version Jim Haywood Product Manager for Statutory Returns.
Project for support of the participation of West Balkan countries in the work of the EEA Wim Mol European Topic Centre on Air pollution and Climate change.
1 Workshop on inventories of greenhouse gas emissions from aviation and navigation May 2004, Copenhagen EU greenhouse gas emission trends and projections.
EIONET European Environment Information and Observation Network Version * * * Reportnet introduction and data.
Presentation of the Air Quality e-reporting User Interface (AQUI 1.0) Wim Mol Presentation AQUI 1.0 Dublin, Ireland October 2013 European Environment.
1 AQ data flows: Summer ozone reporting (SOR) & near real-time air quality data exchange (NRT) IPA support Air Quality kick off meeting, Sarajevo, Bosnia-Herzegovina,
Januar MDMDFSSMDMDFSSS
Week 1.
8th EIONET Workshop AQ,Oslo 1 06 Nov ‘03 EoI 2003 EoI Report Upload process DEMv7.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
PSSA Preparation.
Essential Cell Biology
Weekly Attendance by Class w/e 6 th September 2013.
European Environment Agency 14th EIONET Air Quality Workshop, 5-6 October 2009, Warsaw Update on EEA’s near-real time air quality data work Warsaw, 5-6.
8th EIONET Workshop AQ 1 Oslo, Nov Information on Air Quality on the web AirView 3.0 XML-dump.
1 Joint Drafting Group on State of the Environment and Eionet Workshop — Overview task 4 and 5 — 13/14 November 2006 EEA Copenhagen.
EUROPEAN TOPIC CENTRE ON AIR AND CLIMATE CHANGE AIRBASEAIRBASE Peter de Smet ETC data Manager w status w progress Peter de Smet ETC data Manager w status.
Presentation of the Air Quality e-reporting User Interface (AQUI 1.0) Wim Mol Presentation AQUI 1.0 Dublin, Ireland October 2013 European Environment.
What to report in a revised AIR QUALITY INFORMATION SYSTEM Frank de Leeuw AQ EIONET workshop October 2005, Vilnius.
AirBase and DEM Wim Mol.
Summer Ozone Data Exchange
Presentation transcript:

1 AirBase developments and EoI2005 reporting cycle Patrick van Hooydonk and Wim Mol European Topic Centre on Air and Climate Change (ETC/ACC) under contract to the European Environment Agency Bilthoven, The Netherlands

10th Eionet Workshop on Air Quality Okt Vilnius Contents AirBase developments 2004/2005/2006 (Wim) EoI2005 reporting cycle (Patrick)

10th Eionet Workshop on Air Quality Okt Vilnius AirBase dev. 2004/2005 > DEMv8.0 Moving/Copying stations from one network to another Measurement methods: –Automatic analyzer (fixed list of meas.methods) –Remote sensor (fixed list of meas.methods) –Active sampler Export: all meta data info (DEM meta info file) Import: modify, delete, add meta information networks, stations and measurement configurations

10th Eionet Workshop on Air Quality Okt Vilnius AirBase dev. 2004/2005 > DEMv8.1/8.2 Bugs during the workshop 9-10 June Copenhagen Bugs in visualisation and report module Patches available medio August and 1 Sept.

10th Eionet Workshop on Air Quality Okt Vilnius AirBase dev. 2004/2005 > Workshop 9-10 June at EEA DEM training 37 participants from 31 MS Valuable experience not only to the participants but also to ETC/ACC! The first time that the DEM was tested by so many people!

10th Eionet Workshop on Air Quality Okt Vilnius AirBase dev. 2004/2005 > QA/QC See QA/QC checks on air quality data in AirBase and on the EoI2004 data (link: Removal of phantom stations –1079 stations removed –1954 left: 1549 will be removed asap; 405 will be populated with data Overview PM10 correction factors used in the 2002-data (+ recently overview 2003-data) EoI2004 quality checks.

10th Eionet Workshop on Air Quality Okt Vilnius AirBase dev. 2004/2005 > cycle 2004/2005 DateProcess DSProcess ETC/ACC Release DEMv7 Modify, check metadata Import, check raw data Submit to CIRCA Upload DEM into AirBase Quality checks + reports Replies on feedback reports Additional feedbackProcessing (non) replies Calculation statistics and exceedances Release of AirBase with EoI data + XML dumps

10th Eionet Workshop on Air Quality Okt Vilnius AirBase dev. 2005/2006 See report AirBase – potentials and developments also in climate.eionet.eu.int/reports Items: –Improving the quality –Accessibility –Completeness –Central database for AQ meta information –Coupling with geographical data –Reportnet –Accellerating data transmission cycle

10th Eionet Workshop on Air Quality Okt Vilnius AirBase dev. 2005/2006 > Improving the quality Outliers checks before 2002 Filling time gaps

10th Eionet Workshop on Air Quality Okt Vilnius AirBase dev. 2005/2006 > Coupling with geographical data Station coordinates -> NUTS codes NUTS codes: NUTS1, NUTS2, NUTS3, LAU1 and LAU2 NUTS codes -> Zones and agglomerations DEMv9: NUTS4, NUTS5 replaced by LAU1, LAU2 DEMv9 will be preloaded with the new NUTS codes for checking by the data suppliers

10th Eionet Workshop on Air Quality Okt Vilnius AirBase dev. 2005/2006 > Central database for AQ meta information Merging the FWD with the EoI (see Andrej Kobe: Data Exchange Group) Extend AirBase with information on zones and agglomerations (see Frank de Leeuw : revised AQ Information System)

10th Eionet Workshop on Air Quality Okt Vilnius AirBase dev. 2005/2006 > Completeness Correct information on the measuring method used including the correction factors PM10 Extension AirBase/DEM with precipation data (4DD)

10th Eionet Workshop on Air Quality Okt Vilnius AirBase dev. 2005/2006 > Accessibility AirView 3.1 XML dumps (+ ascii files with raw data) Excel macros for postprocessing XML dumps New: migration of the visualisation and dissemination functions of AirBase from ETC/ACC to EEA In 2008 the new EEA system is operational –At least same functionality as AirView and XML dumps/Excel macros –Integration with EEA data and map service –Generation of reports (tables in the EoI Technical report) –…..

10th Eionet Workshop on Air Quality Okt Vilnius AirBase dev. 2005/2006 > Accelerating data transmission cycle AirBase uploaded, quality checked, statistics, exceedances: –2004/2005: After 6 months (1 April) –2005/2006: After 4 months (1 Februari) –2006/2007: After 3 months (1 January) on condition that: MS deliver feedback replies within a month All MS deliver the DEM Earlier availability of statistics is possible: –Release of the DEM in April/May –MS deliver the DEM as soon as the national validated data are available –Advance the 1 Oktober deadline

10th Eionet Workshop on Air Quality Okt Vilnius EoI 2005 reporting cycle Status Upload procedure Time shedule

10th Eionet Workshop on Air Quality Okt Vilnius EoI 2005 reporting cycle: Status reported 94 % uploaded 30 % feedback 24 % reply 9 % Status upload-process: 14 oct Number of county reports expected: 33

10th Eionet Workshop on Air Quality Okt Vilnius EoI 2005 reporting cycle: upload procedure Changes country feedbacks Availability 2004-data in AirBase

10th Eionet Workshop on Air Quality Okt Vilnius EoI 2005 reporting cycle: upload procedure - country feedback Reply expected in two ways: –Modified country feedback-sheets –DEM-database Changes country feedback: –Sheets adjusted for automatic processing reply of: Changes outlier check boundaries Detected outliers Updating essential meta data Confirm deletions/resubmissions

10th Eionet Workshop on Air Quality Okt Vilnius EoI 2005 reporting cycle: upload procedure - country feedback Fill in new boundary values Example 1 : outliers(overview)

10th Eionet Workshop on Air Quality Okt Vilnius EoI 2005 reporting cycle: upload procedure - country feedback Update status value If status = C: correct result value Example 2 : outliers(results-detail)

10th Eionet Workshop on Air Quality Okt Vilnius EoI 2005 reporting cycle: upload procedure - country feedback Fill in missing meta information Example 3 : missing meta(classification)

10th Eionet Workshop on Air Quality Okt Vilnius EoI 2005 reporting cycle: upload procedure - availability Preliminary state of AirBase at 1 st of december will be available on the 15 th of december:

10th Eionet Workshop on Air Quality Okt Vilnius EoI 2005 reporting cycle: Time schedule