ACER opinion on ENTSOG’s 2011 Ten-Year Network Development Plan

Slides:



Advertisements
Similar presentations
GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 13 December 2013.
Advertisements

1st Ten Year Network Development Plan: ERGEG opinion
Gas Regional Initiative – North West Region Investment workshop The Hague – 4 June 2010 Investment Project Regional Investment Plans Introduction to methodology.
Stakeholder Group Meeting 26. May 2010 Northern Regional Initiative in a European context Jeppe Danø.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
SG MEETING GRI NW– 28 N OVEMBER 2013 Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the.
Gas Regional Initiative Region North-West Gas Regional Investment Plan Project Marie-Claire Aoun, Carole Mathieu CRE RCC Meeting The Hague – 4 April 2013.
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
GRI NW Stakeholder Group Meeting – 25 November 2011 GRI NW Stakeholder Group Meeting 25 November 2011 Kristóf Kovács The 2014 target and the role of the.
Madrid Forum 15 October 2014 Massimo Ricci Chairman.
RCC meeting Gas Regional Investment Plan project TITRE 18/10/2012 RCC meeting Gas Regional Investment Plan project CRE.
Gas Regional Initiatives Getting to 2014 Steven Gordon Head of the Gas Department, ACER 8 th GRI Co-ordination Meeting Brussels, 27 th February 2012.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
1 THE THIRD ENERGY PACKAGE – THE ENERGY COMMUNITY APPROACH Energy Community Secretariat 20 th Forum of the Croatian Energy Association and WEC National.
TYNDP SJWS #3 Demand TYNDP – 3 rd SJWS 08 March 2012 ENTSOG offices -- Brussels.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
Tom Maes, ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Transit contracts.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
Tahir Kapetanovic ENM TF Co-Chair XIX Florence Forum, December 2010 ERGEG Opinion on the ENTSO-E pilot TYNDP.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
The Central Role of the Network Operators 28 March 2007 ERGEG-GTE Meeting.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
Gas Regional Initiative South South-East
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
10 year investment plan ERGEG approach and contribution
Dr. Benoît ESNAULT (CRE) and Dr. Stefanie NEVELING (BNetzA)
40th IG meeting 29th November 2016
Enagás, GRTgaz, Reganosa, REN and TIGF
GRI-S : Infrastructures The Union list of projects of common interest
How will the 3rd Energy Package Impact GRI NW ?
Gas Regional Investment Plan North West Europe 2013 Presentation for ENTSOG (November 26th 2013, Brussels) and GRI NW SG (November 28th 2013, Stockholm),
Gas Regional Investment Plans
GSE worked with ERGEG on CAM/CMP since
Background and Process
ERGEG GRI South South East – , Maribor
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
Gas Regional Initiative
GRI NW European Energy Work Plan 2011 – 2014
Ashgabat International Energy Charter Forum
ACER’s view on the future role of the Gas Regional Initiative
Public workshop: CBA 3.0 –come and improve with us the transmission and storage assessment methodology Brussels 07 November 2017.
Brussels, 29th April 2009 Presentation by Martin Altstätter
Gas Regional Investment Plan North West
Gas Regional Investment Plan North West
Gas Regional Investment Plan North West Europe 2013 Presentation for ENTSOG (November 26th 2013, Brussels) and GRI NW SG (November 28th 2013, Stockholm),
Enagás, GRTgaz, Reganosa, REN and TIGF
Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the ACER Gas Infrastructure Task Force.
Gas balancing – where next
Gas Regional Investment Plan project
40th IG meeting 29th November 2016
Purpose Transparency is a critical element in ensuring an effective functioning internal European Gas market Gas Regulation No 715/2009, effective from.
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
GRI NW European Energy Work Plan 2011 – 2014
Gas Regional Initiative South South-East
Incentives for electricity infrastructure – ERGEG view
ACER’s view on the future role of the Gas Regional Initiative
Update on WS3 Activities
July update JANUARY 2019.
Gas Regional Initiative South South-East
Projects of Common Interest
Presentation transcript:

ACER opinion on ENTSOG’s 2011 Ten-Year Network Development Plan Benoit Esnault, Co-Chair TYNDP workstream 20th Madrid Forum 27 September 2011

Introduction ENTSOG submitted the 2011 TYNDP to ACER on July 18 According to Article 9(2) of Gas Regulation, ACER has to provide a duly reasoned opinion and recommendations according to specific criteria on market integration and access to interconnections Background of ACER analysis: ERGEG recommendations and analysis of the 2010 TYNDP General comments ACER welcomes ENTSOG efforts, in particular that several past recommendations were taken into account; Important step forward compared to the previous TYNDP; Some clarifications and improvements are however expected for the next version.

ACER analysis – data collection and stakeholders involvement Need for a consistent and standardised data collection ACER welcomes that the TYNDP compares different demand projections; ENTSOG annual demand projection is the highest in terms of absolute figures; But is based on TSOs’ forecasts without any harmonisation of underlying assumptions; Some inconsistencies between TSO projects and third-party projects communicated by non-ENTSOG members. Need for a close collaboration between all actors to produce consistent and comparable investment plans at European and regional levels in order to: Have a sound diagnosis regarding congestions and investment needs; and ensure a consistent design for cross-border projects.

ACER analysis – Scenarios and modelling Combination of “bottom-up” and “top-down” approaches Improved inclusion of EU wide dynamics (“top-down approach”); The analysis of wide-range market integration and security of supply scenarios is welcomed; Modelling improved in terms of application, model description and presentation of the results. Improvements expected On scenarios: discussions needed on the concept of “remaining flexibility”; Modelling does not allow to clearly identify where congestions are; The “supply initialisation” approach excessively simplifies the analysis of the impact of new infrastructures on flow patterns; Assessment of market integration: need for deeper analysis of identified regional and national congestions; ENTSO-E and ENTSOG investment plans should be coordinated.

ACER analysis – consistency between national, regional and EU-wide plans ACER acknowledges that, in many Member States, no national plan has been developed yet. Since regional plans are still under development, ENTSOG has to ensure that Community-wide and regional plans are consistent. ACER invites TSOs to use the existing GRI structures to present regular updates and promote dialogue with stakeholders. ACER expects the next TYNDP to: feature a monitoring chapter with a particular focus on 3-year projects; Give explanations on divergences or inconsistencies between national investment plans and GRIPs.

ACER’s reasoned opinion on TYNDP (1/2) The TYNDP should provide all the information allowing to identify infrastructure needs and encourage necessary investments Need for greater stakeholder involvement during the elaboration of the TYNDP to ensure data is comprehensive and consistent; To help delivering concrete proposals, a more infrastructure-based approach should be followed. The modelling methodology should include an economic dimension to better address the impact of new projects on shippers arbitrages; and a physical dimension to better reflect the “real” network and gas flows.

ACER’s reasoned opinion on TYNDP (2/2) In the current context, the TYNDP is no more a “voluntary” process Need to reflect the EU political goals (RES and 20-20-20 targets) and expected effects of nuclear phase outs, as in Germany, on the European gas market; Need to coordinate ENTSOG and ENTSO-E TYNDPs. The Energy Infrastructure Package will probably translate into higher expectations from the TYNDP An analysis of competitive projects, with costs and benefits on competition, non-discrimination, market integration and effective functioning of the internal market could have to be, ultimately, carried out by ENTSOG.

Thank you for your attention www.acer.europa.eu