Seminar on JESSICA and State Aid Brussels, 4 May 2011

Slides:



Advertisements
Similar presentations
Social economy and state aid in the ESF-context. resources from the ESF and the ERDF = state resources The rules on state aid therefore apply to financing.
Advertisements

DG Energy and Transport, European Commission Fabrizio Barbaso 17/04/2008 EU RENEWABLE ENERGY PROPOSALS ARF Energy Security Seminar EUROPEAN COMMISSION.
Directorate-General for Regional Policy EUROPEAN COMMISSION Cohesion Policy and the water sector Eddy Hartog Head of Unit, DG REGIO EU Sanitation Policies.
The new State Aid Package for SGEI
Regional Policy EUROPEAN COMMISSION 1 EGTC regulation EGTC regulation ESF and EGTC regulations Regulation of the European Parliament and of the Council.
EN Regional Policy EUROPEAN COMMISSION The new European Regional Development Fund Brussels, 12 October 2006 Committee of the Regions N. De Michelis,
State aid and Structural Funds Carlos Tenreiro DG Competition Brussels 9 April 2003 DG Competition.
Article 55 of Council Regulation (EC) No 1083/2006: Revenue-generating projects Impact of the revision 2010 Presented by Anton Schrag DG.
Anna NYKIEL-MATEO Policy Officer DG COMP A3 27/11/2012
1 FINANCING ENERGY EFFICIENCY AND RENEWABLE ENERGY IN BUILDINDS: THE EIB EXPERIENCE European Investment Bank (EIB) Promotion of investments in sustainable.
Combination of repayable financial instruments with grants Interest rate subsidies and guarantee fees subsidies Grants in combination with repayable.
Management and control systems Franck Sébert, DG Regional and Urban Policy, Head of Unit C1 FOURTEENTH MEETING OF THE EXPERT GROUP ON.
Regional Policy Delegated Acts. Regional Policy 2 Delegated ActsImplementing Acts 32(10): Purchase of land and combination of TA with FI 33(3)(a):FI complying.
1 JESSICA: STATE AID PRINCIPLES Eglé Striungyté, DG Competition European Commission* JEREMIE and JESSICA Conference Brussels, 30 November 2010 * DISCLAIMER:
JESSICA Addressing State aid issues in Andalucia (ES) and the United Kingdom Frank Lee Head of Holding Funds and Advisory – Northern Europe JESSICA & Investment.
1 DG TAXUD/C/213/05/2005 Future of Preferential Rules of Origin Commission Communication The Rules of Origin in Preferential Trade Arrangements Orientations.
European Union Cohesion Policy
EN Regional Policy EUROPEAN COMMISSION Information and Publicity SFIT, 15 June 2006 Barbara Piotrowska, DG REGIO
European Commission DG Competition Limitations on public funding of innovation support services Jean-Charles DJELALIAN.
Research and Innovation Research and Innovation Brussels, 12 November 2013 Types of Action Focus on Innovation Actions and the SME Instrument.
1 JESSICA: detailed economic assessment directly under TFEU Eglé Striungyté and Christian Harringa DG Competition, European Commission* * DISCLAIMER: The.
Nicolas de Sadeleer State aids and the EU ETS Professor of EU Law at FUSL Jean Monnet Chair Guest Professor Lund and UCL.
1 EC Ports Policy Consultation II ‘Port Service Enhancement’ ESPO General Assembly Hotel Amigo, Brussels – 7 November 2012.
1 TOWARDS A CLEARER INTERACTION BETWEEN THE STATE AID RULES AND THE RULES ON PUBLIC PROCUREMENT Global Competition Law Centre, Bruges, 30 Sept 2011 Klaus.
Stefan Appel, DG Regional and Urban Policy
INTRODUCTION TO STATE AID
Lectures on Competition Policy – State aid Louvain-La-Neuve 16 March European Commission, DG Competition State aid to network industries, liberalised.
EEA – EFTA Forum State aid rules - modernisation Advokat Hanne S. Torkelsen E-post
State Aid Rules Ole Damsgaard.
How to make your money go further Lorraine Lee Scottish Government - State Aid Unit Eileen Threlfall Scottish Government – Legal Division.
European Commission, DG Competition, Unit A3 Global crisis and State aid in the EU Dr. Juergen Foecking “EU State Aids Acquis and Turkey” Istanbul, 11.
State aid control Wouter Pieké* Head of Unit COMP.C.4
Lorraine Lee Scottish Government State Aid Unit
The General Block Exemption and De Minimis Regulations
Dias 1 Securing Electricity Generation Capacity An assessment through the lens of EU State aid law Eleni Manaridou, LL.M. Ph.D. Fellow Centre.
1 Homologues Group Meeting Slovenia, October 2009 Republika SlovenijaEuropean Union Ljubljana, October 2009 Workshop 3 Audit of State Aids Ljubljana,
State aid issues for NGA networks Ginny O’Flinn 23 November 2010.
Comments on the 2011 draft SGEI Package Damien Geradin Covington & Burling, Tilburg University and College of Europe Bruges, 30 September 2011.
The State Aid Action Plan Thibaut KLEINER DG COMP Global Competition Law Centre 19 September 2005 – Brussels.
The reform of State aid rules on SGEI An economic perspective on compensation Lorenzo Coppi GCLC SGEI Conference Bruges, 30 September 2011.
HOW TO SUCCESSFULLY GAIN COMMISSION APPROVAL 3 June 2014.
TRAINING AID AND AID FOR DISADVANTAGED WORKERS AND FOR WORKERS WITH DISABILITIES Stephen Moore European Support Unit.
The revision of the State aid rules for R&D&I Prague, 18 July 2013
DG Competition 1 DG Competition June 2004 Revision of the regional aid guidelines (RAG)
STATE AID DAY Office for the Protection of Competition FINANCIAL AND REAL ECONOMY CRISIS AND STATE AID Roland Schachl Federal Ministry of Economy, Family.
1 Homologues Group Meeting Slovenia, October 2009 Republika SlovenijaEuropean Union Ljubljana, October 2009 EC rules on state aid Ljubljana,
Humbert DRABBE Director, Cohesion, R&D&I and enforcement DG Competition Brussels, 6 March 2012 Session 2: Possible main elements of the modernisation package.
The Community State Aid Action Plan Alena Zemplinerova, CERGE-EI, joint working place Charles University and Academy of Sciences The International Conference.
2004 Aviation Guidelines EUROPEAN COMMISSION Jean-Louis COLSON, Brussels, 08 September 2009.
State Aid - An Introduction Stephen Martin Scottish Government State Aid Unit.
State Aid and SMEs, Access to Finance Ramona IANU Country coordinator for Romania, DG Competition 1.
Workshop III: Energy and Environmental aid Diana BARGLAZAN DG Competition, European Commission 1.
State Aid Rules Ole Damsgaard. What is state aid? “Any aid granted by a Member State…which distorts competition by favouring certain undertakings or the.
Communication Temporary framework for State aid measures European Commission DG Competition 21 January 2009.
1 State aid control in the broadband sector Oliver Stehmann Click to edit subtitle Digital Agenda Assembly – workshop 5: Financing and facilitating broadband.
State aid – Trainee training Sarah Ward 15 September 2015.
Institute for Austrian and International Tax Law Cooperative compliance at the crossroad of different legal frameworks – Cooperative.
ENERGY AND ENVIRONMENTAL AID - GENERAL OVERVIEW Diana BARGLAZAN *, Zora MINCHEVA *, Christos PEOLIDIS * DG Competition * The views expressed are purely.
State aid to tourism: Overview of the rules
State aid in the fishery and aquaculture sector
Regional aid and Article 56 GBER
Public funding for broadband networks and State aid rules
RULES ON REGIONAL AID AND STATE AID FOR SMES
Yvonne SIMON, Legal officer, DG REGIO
State Aid Rules Kirsti Mijnhijmer, Joint Secretariat
Notification or Block Exemption? Factors To Take Into Account
State aid in the field of Energy: challenges
Pedro Cruz Yábar Brussels, 21st June 2016
Yvonne SIMON, Legal officer, DG REGIO
STATE AID - Week 9 - Prof. Valerio Cosimo Romano.
Presentation transcript:

Seminar on JESSICA and State Aid Brussels, 4 May 2011 JESSICA: using existing State aid provisions Eglé Striungyté and Christian Harringa DG Competition, European Commission* * DISCLAIMER: The views expressed are purely those of the presenters and may not in any circumstances be regarded as an official position of the European Commission

Overview State aid presence and beneficiaries Compatibility rules: Regional Aid Guidelines Environmental Aid Guidelines Broadband Guidelines Risk Capital Guidelines SGEI rules GBER References

Is State aid present? (1) Cumulative Art 107 (1) TFEU conditions to establish State aid presence: Support in whatever form provided by the State or through State resources to… selected economic activities (offering of goods or services on a specific market) carried out by any entities (pubic or private) conferring… an economic advantage, i. e. investments not in line with the market economy investor principle (MEIP), which could… distort competition and affect trade. Verifying MEIP-compliance to establish State aid presence: Loans - interest rates in line with the Reference Rate Communication (OJ C 14, 19.1.2008); Guarantees - fees and conditions in line with the Guarantee Notice (OJ C 155, 20.6.2008); Equity/quasi-equity - public-private investments on a pari passu basis (the Risk Capital Guidelines, OJ C 194 18.008.2006); Services of General Economic Interest (SGEI) - see below.

Is State aid present? (2) De minimis aid (not qualifying as State aid): EUR 200,000 over any 3 fiscal year period (Regulation N. 1998/2006) Only transparent aid, i. e. a grant or a gross grant equivalent (GGE) of loans and guarantees (equity only if treated as a grant) Calculating a GGE of State aid (for de minimis and compatibility): Standard loans - the present value of the difference between the (market) interest rate (normally based on the Reference Rate Communication) and the interest rate actually charged; Guarantees - the present value of the difference between the (market) guarantee fee (normally based on the Guarantee Notice) and the guarantee fee actually charged; Equity/quasi-equity – considered not to be transparent aid and, therefore, normally the total investment amount is treated as a grant.

Potential State aid beneficiaries Private investors in HF/UDFs receiving preferential treatment compared to public investment HF/UDF managers receiving higher than market remuneration for investment management services Project promoters (and other project investors) receiving sub-commercial equity, loans and guarantees

Justifying State aid Guidelines Directly under TFEU No prior notification Prior notification obligation, approval of the Commission General Block Exemption Guidelines Directly under TFEU Art 107.3 (c), (d) Standard assessment Detailed assessment Specific policy instruments: pre-defined market failures and limited distortions Detailed economic assessment: effect-based balancing test

Regional Aid Guidelines Project types: Multi-sectoral investment projects (SMEs and large companies) Standard assessment principles (schemes): Projects must be undertaken in the assisted areas of Art. 107(3)(a) or(c) TFEU covered by the regional aid map (if areas below the NUTS III level with min. 20.000 population covered by the regional map, SMEs may receive investments below EUR 25 million); Investment into new assets (initial investment, not replacement investment) and must be maintained for at least 5 years after completion; Aid intensities (a percentage of discounted eligible costs) – up to 50% for large enterprises, up to 60% for medium-sized and up to 70% for small enterprises; The recipient must contribute at least 25 per cent of the total eligible costs that are free of State aid . Individual notification (projects): Large investment projects above EUR 50 million or exceeding the RAG thresholds.

Environmental Aid Guidelines Project types: Renewable energy, high efficiency cogeneration, energy saving, district heating installations (not heating infrastructure), waste management (treating waste generated by other polluters) and the remediation of contaminated sites (where the polluter is not known). Standard assessment principles (schemes): Eligible costs – only extra investment costs linked to environmental protection (compared to a reference conventional investment) net of operating costs and benefits (i. e. cost savings) arising during the first 3 to 5 years of the investment; Aid intensities may not exceed 60-80% for renewables, cogeneration and energy savings and 50-70% for waste management and district heating; For the remediation of contaminated sites, 100% aid intensity of the eligible costs (the costs of remediation, minus the increase value of the site). Individual notification (projects): Aid to a project exceeding EUR 7.5 million.

Broadband Guidelines Project types: Necessity criteria: Basic broadband and next generation access (NGA) networks. Necessity criteria: Areas with insufficient broadband coverage: “white” areas (simplified procedure) and “grey” areas (standard assessment), no credible private investment in the target area within 3 years. Core safeguards: Detailed mapping and coverage analysis, public consultation with existing operators; Open tender process selecting the most economically advantageous bid; Technological neutrality not to favour any technology or service provider; Use of existing infrastructure, wholesale access, benchmarking pricing, monitoring and claw-back. Additional safeguards (core safeguards plus for NGA networks): Access to passive (and not only active) infrastructure; National Regulatory Authorities shall be consulted; Network architecture should support effective and full unbundling and satisfy all different types of network access.

Risk Capital Guidelines Risk Capital Guidelines (OJ C 194 18.08.2006, p. 2) foresee public/private investments in the form of equity and quasi-equity combined with loans and guarantees. Preferential (non pari-passu) conditions for private co-investors can be compatible. Standard assessment principles (“Chapter 4”): EUR 2,5 million joint public/private investment tranches per target SME per year; Minimum private participation of 50/30 percent in non-assisted/assisted areas. In-depth assessment principles (“Chapter 5”): Higher investment tranches and lower private participation possible when sufficiently justified by specific proof of market failure.

General Block Exemption Regulation GBER (OJ L 214, 09.08.2008, p. 13): conditions for several aid measures to be exempt from obligation to notify. 26 different settings (e.g. regional aid, investment aid, environmental aid or risk capital measures) for recipients, aid intensities and eligible costs. Aid has to meet transparency criterion in Article 5 GBER, i.e. primarily aid has to be comprised in grants, interest rate subsidies, certain kinds of loans, guarantees and capped fiscal measures. Equity/quasi-equity considered non-transparent, possible when total amount considered as grant. Investments into SMEs only when provided by a public/private fund with minimum 50% private participation (30% in assisted areas).

SGEI (1): The „Altmark Conditions“ Under the following conditions, set by the Court (Judgment of 24 July 2003 Case C-280/00, European Court reports 2003 p. I-07747) , public compensation for the provision of SGEIS by an undertaking is free from State aid: The undertaking actually has public service obligations to discharge and these obligations are clearly defined. The parameters of the compensation are objective and established in advance. The compensation does not exceed the costs of the SGEI plus a reasonable profit and may not be used on other markets open to competition. The SGEI provider has been selected by a tendering procedure or Compensation for provision of SGEI has been calculated on the basis of the costs of a typical undertaking that is well run and adequately equipped (Efficiency test).

SGEI II: the 2005 compatible SGEI package COMMISSION DECISION OJ 2005/L 312/67 FRAMEWORK OJ 2005/C 297/04 TRANSPARENCY DIRECTIVE OJ 2006/L 318/17 “Small” SGEI: Turnover max. EUR 100 million and compensation max. EUR 30 million p.a. Social housing Hospitals “Small” public service operators: air and maritime links “Large” SGEI Separate accounts required for: SGEI activities and Commercial activities EXEMPT FROM NOTIFICATION NOTIFICATION

Test Case(s): Refurbishing the EU Quarter in Model Town In order to demonstrate options for urban develop-ment projects in line with State aid rules, we use the following test case(s) both in assisted and non assisted areas: Construction of 200 apartments in a privately owned social housing project for EUR 50 million of which EUR 10 million are public grant funding. Building of 4,000 square meters of privately owned office space for EUR 8 million, EUR 6 million of which are public subordinated loan to international development company (no SME). Installation of solar panels on top of office buildings for EUR 800,000 by a private undertaking with EUR 200,000 grant funding. Building a public park for EUR 3 million public expenditure. Integrating 1-4 in a single development project with EUR 61.8 million volume in a public private partnership without public grants but with favorable investment conditions for the private investor.

References State aid Handbook: http://ec.europa.eu/competition/state_aid/legislation/compilation/state_aid_11_03_11_en.pdf State aid for urban development – the Urban Vademecum: http://ec.europa.eu/competition/state_aid/studies_reports/vademecum.pdf Contacts: Paolo Cesarini, Head of Unit, H2, H - State aid: Cohesion, R&D&I and Enforcement, DG Competition, Tel: +32 2 2951286, email: Paolo.Cesarini@ec.europa.eu