Multi-apartment buildings 5-9 storeys Low-rise apartment buildings up to 4 storeys UPB prefabricated buildings 2007.

Slides:



Advertisements
Similar presentations
Un percorso realizzato da Mario Malizia
Advertisements

Circle Theorems Bingo!. Use any 9 of these numbers 105 o 240 o 55 o 14 o 65 o 50 o 90 o 45 o 60 o 40 o 110 o 155 o 15 o 74 o 120 o 12 o.
Artrelle Fragher & Robert walker. 1 you look for the median 1 you look for the median 2 then you look for the min and max 2 then you look for the min.
Two Special Right Triangles
OAA Practice Created by Educational Technology Network
Fill in missing numbers or operations
Name: Date: Read temperatures on a thermometer Independent / Some adult support / A lot of adult support
$1 Million $500,000 $250,000 $125,000 $64,000 $32,000 $16,000 $8,000 $4,000 $2,000 $1,000 $500 $300 $200 $100 Welcome.
Ozone Level ppb (parts per billion)
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
WHAT DO THEY ALL MEAN?. Median Is the number that is in the middle of a set of numbers. (If two numbers make up the middle of a set of numbers then the.
/4/2010 Box and Whisker Plots Objective: Learn how to read and draw box and whisker plots Starter: Order these numbers.
2.4 Using Linear Models 1.Modeling Real-World Data 2.Predicting with Linear Models.
Topographic Maps Mr. King.
Half Life. The half-life of a quantity whose value decreases with time is the interval required for the quantity to decay to half of its initial value.
Welcome to Who Wants to be a Millionaire
Warm up Complete the analogies: 5 is to 25 as 6 is to ___________ 7 is to 77 as 11 is to ___________ ¼ is to ½ as.25 is to ____________
1 1  1 =.
1  1 =.
DirectInverseJointVariations Radical Review
Science Jeopardy >>>> Topic 1 Topic 2 Topic 4 Topic Topic 5.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt ShapesPatterns Counting Number.
Partial Products for Multiplication
Word Problems.
Who Wants To Be A Millionaire?
Decimals 10ths and 100ths.
I can interpret intervals on partially numbered scales and record readings accurately ? 15 ? 45 ? 25 ? 37 ? 53 ? 64 Each little mark.
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.

£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
IV infusions Calculating volume of fluid delivered over time:
Construction Documents
ORDER OF OPERATIONS LESSON 2 DAY 2. BEDMAS B – Brackets E – Exponents D – Division from left to right M – Multiply from left to right A – Add from left.
Unit 2: Supply, Demand, and Consumer Choice 1. REMEMBER THE STEPS! 2.
Price Points With Bar Charts. Investment to Value Ratio $45,000 - $65,000 $25,000 - $45,000 Under $25,000 $90,000 - $125,000 $65,000 - $90,000 Low Price.
EXAMPLE 4 Solve a multi-step problem SHOPPING
+ FV TV PROBLEM: A SQUARE PLATE IS PIERCED THROUGH CENTRALLY
Money Math Review.
Constructions of Large-panel Buildings in Vilnius
Effects on UK of Eustatic sea Level rise GIS is used to evaluate flood risk. Insurance companies use GIS models to assess likely impact and consequently.
Area of triangles.
CVP /BEP Analysis DR. RANA SINGH Associate Professor in Management MBA (Gold Medalist), Ph.D.
REVOLUTIONARY BUILDING SYSTEM TM. TIMECOSTENERGY THE PROBLEM A NEED FOR INNOVATION.
Pressure = force area = 12 N 25 cm 2 = 0.48 N/cm 2.
Applied Technology CIS-400 Central State University Prof. Hicks.
Marks out of 100 Mrs Smith’s Class Median Lower Quartile Upper Quartile Minimum Maximum.
Counting coins Teacher’s Notes Slides used as worksheet print outs rather than class presentation. Variations to quantity and appearance can be made easily.
UNIT 2: SOLVING EQUATIONS AND INEQUALITIES SOLVE EACH OF THE FOLLOWING EQUATIONS FOR y. # x + 5 y = x 5 y = 2 x y = 2 x y.
Least Common Multiples and Greatest Common Factors
N.S. 1.3: Converting Fractions, Decimals, & Percents Period Odds: 9/19/13 Period Evens: 9/20/13.
World Tuberculosis Day 2013 TB situation in 2011: Findings from the ECDC and WHO/EURO joint TB surveillance report ECDC TB Team European Centre for Disease.
Forging new generations of engineers
MathOnMonday® Presents: Building Math Courage® A program designed for Adults or Kids who have struggled to learn their Math in the traditional classroom!
Number bonds to 10,
Beat the Computer Drill Divide 10s Becky Afghani, LBUSD Math Curriculum Office, 2004 Vertical Format.
NCCTM Leadership Conference Greensboro, NC
2 x0 0 12/13/2014 Know Your Facts!. 2 x1 2 12/13/2014 Know Your Facts!
Another Presentation © All Rights Reserved.
Fractions Simplify: 36/48 = 36/48 = ¾ 125/225 = 125/225 = 25/45 = 5/9
MEL 4E.  Graphing data can make it easier to quickly see trends. There are different types of graphs which each show and compare data.
Partial Products. Category 1 1 x 3-digit problems.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
Kyle bought a bike from his friend. His friend gave him a 20% discount. He paid $40 for it. How much was the original price of the bike?
Powerpoint Jeopardy Category 1Category 2Category 3Category 4Category
© 2006, François Brouard Case Real Group François Brouard, DBA, CA January 6, 2006.
35 Estimating Building Costs Chapter Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives Explain the process.
Wood Building Nordic Växjö 2015 Mass customization – creative freedom for architects in a standardized world? September
دانشگاه شهیدرجایی تهران
تعهدات مشتری در کنوانسیون بیع بین المللی
Presentation transcript:

Multi-apartment buildings 5-9 storeys Low-rise apartment buildings up to 4 storeys UPB prefabricated buildings 2007

5-9 storey apartment building project

Wide range of architectural solutions

General layout LEGEND 1.PROJECT BUILDING 2.PROJECT BUILDING 3.PROJECT BUILDING 4.CHILDRENS PLAYGROUND 5.CARPARK AREA UPB implemented project – 5 storey apartment buildings in Latvia

Apartment buildings in construction process

Technical drawings

View

Floor layout

Parametrs Elaboration of final design: ARHITEKTA U. PĪLĒNA BIROJS Manufacture and supply prefabricated concrete constructions: DZELZSBETONS MB General contractor:UPB NAMS Blocks I, IIBlock III Number of floors55 Number of apartments4015 Area of one apartment50 – 80 m m 2 Total area of building3004,5 m ,6 m 2 Area of apartments2649,0 m ,0 m 2 Area of service space (common premises)355,1 m 2 177,5 m 2 Construction area710 m m 2 Building volume9987,4 m ,7 m 3 Underground section:60 m 2 30 m 2 Low attic floor:530,8 m 2 265,4 m 2 Stages I, IIStage III UPB implemented project – 5 storey apartment buildings in Latvia

Low-rise apartment building project up to 4 storeys

UPB implemented project - 3 storey apartment building in Liepāja General layout LEGEND 1.PROJECT BUILDING 2.PROJECT BUILDING 3.PROJECT BUILDING 4.CHILDRENS PLAYGROUND 5.CARPARK AREA

UPB implemented project - 3 storey apartment building in Liepāja

UPB implemented project - 3 storey apartment building in Liepāja

Technical drawings

View

Floor layout

Parametrs Elaboration of final design: ARHITEKTA U.PĪLĒNA BIROJS Production and delivery of prefabricated concrete constructions: DZELZSBETONS MB General contractor:UPB NAMS Commissioner:UPB Number of floors:3 Number of apartments:12 Total area of building:958 m 2 Area of apartments:698 m 2 Area of service space (common premises): 104,4 m 2 Construction area of building:430 m 2 Building volume of the house:2866 m 3 Underground section:125 m 2 Low attic floor:325 m 2 Boiler house:45 m 2 Area of terrace:10 – 20 m 2 Area of terraces:155,87 m 2 UPB implemented project - 3 storey apartment building in Liepāja

Thank you for your attention!