Floating Head Heat Exchanger

Slides:



Advertisements
Similar presentations
Health & Safety Life Book AM ST p. 1 v.01 - Nov. 03, 2011 Isolation Positive isolation of dangerous fluids is providing a safe environment during.
Advertisements

The idea evolved from two different contractor customers who shared with us a better way to perform hydrostatic testing of DWV piping system. Two different,
CHAPTER 45 Engine Lubrication.
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
REMOVE AND INSTALL THERMOSTAT AND TEST OPERATION CS4 A.1 D.6 P-5/6.
Force & Lift Pump RAJASTHAN EXPERIENCE. Present scenario Unclean toilet – closed toiletsone drinking water point – one hand washing point.
Metering Pump Spare Parts Replacement. Pump Components (Metering Pump) Pumps are supplied with a 120VAC or 240VAC power cord. Use care to ensure pump.
Tools Material Pre-Assembly Assembly Purpose Test 4/24/2015 JTOT Jet A – Thermal Oxidation Test Training Memphis Refinery Lab Tools Material Pre-Assembly.
Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
Engine Removal and Disassembly
Reservoirs Covered in Ch. 5 of Vickers Text
A Canadian Hot Tub Factory Tour. You begin with a Quality Lucite Acrylic sheet. The shape is created by loading the sheet into a forming machine, heating.
"AIR COOLER" Heat Exchanger
Suction Pumps.
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
Pump Installation Vigyan Ashram, Pabal.
CARBURETED FUEL SYSTEM
Hydronic Mechanical Controls
…an innovative shell and tube heat exchanger with an exceptionally high heat transfer coefficient for industrial fluid cooling and air conditioning.
Engine Installation, Break-In, and In-Chassis Repairs
© 2011 Pearson Education, Inc. All Rights Reserved Automotive Technology, Fifth Edition James Halderman IN-VEHICLE ENGINE SERVICE 27.
3.7.5 Student Book © 2004 Propane Education & Research CouncilPage 1 A full understanding of the operation of the liquid evacuation process if essential.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
HVAC523 Circulator Pumps.
GIDC DEGREE ENGINEERING COLLEGE BRANCH- CIVIL ENROLLMENT NO PATEL SHARADKUMAR KIRITBHAI SHARMA TANISHQ SHAH ASHIT.
Floating Head Heat Exchanger
INTRODUCTION Definition:
Process line for cylinder heads second half. Machines in order 1.Warehouse 2.Robot 3.Two machine centers 4.Washing machine 5.Pluging machine 6.Ringing.
USA ZAMA BASIC BIS. USA ZAMA What is BIS ?  What does BIS mean? – BIS is an acronym for B alanced I dle S ystem – The BIS system is part of the idle.
“Fix Tube Sheet” Heat Exchanger
Heat Exchangers This is session 19 in curriculum manual.
Getting Ready Gather tools, oil and filter. If you plan to change your oil regularly, consider investing in jack stands, a socket set and an oil drain.
HPU FILTERS LOW PRESSURE FILTER FROM APU UNIT. CLOSE APU HYDRAULIC FLUID VALVE. FILL FILTER WITH HYDRAULIC FLUID PRIO TO INSTALLATION. LUBRICATE GASKET.
Add plants to your garden
Spiral Heat Exchangers – “The Problem Solver”
Automotive Engines: Theory and Servicing, 7/e By James D. Halderman Copyright © 2011, 2009, 2005, 2001, 1997 Pearson Education, Inc., Upper Saddle River,
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
Vertical Pump Motor Manifold Upgrade. VPMM Replaces Existing Pumps, Motors, Relief Valves, Check Valves, Discharge Filters, Pump Running Pressure Gauges,
INSTALLATION MANUAL FATL Machine Installing: ACTIVITY CHECK POINT 1. Minimum two persons required for opening the Machine. 2. Cut the straps & tape. 3.
Ferrari Testarossa 1987 OS Giken Clutch Replacement Document Version
Hydraulic axial forces acting on a Francis runner.
Temperature Test Allows monitoring of temperature changes.
Condensate Management
CANTY QUICKPORTS™ “How they work”
F I L T R A T I O N SCHOONOVER, INC..
45 Chapter Exhaust System Technology and Repair.
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
IN-VEHICLE ENGINE SERVICE
774X 21/2”, 6”, 8”.
Soxhlet Unit B Maintenance By: Shawna Brookes.
2000SS 2½”-12”.
High Pressure Water Jetting
Servicing the Steering System
Ignition Systems Overview
Fans & Heaters technical seminar
SB Packing Automatic Downpuller Power Unit
Fuel Supply System Service
Engine Removal, Disassembly, Inspection, and In-Chassis Repairs
FUEL DELIVERY SYSTEM Copyright © MILE 2011 MILE / XUV500 / IC / VER 01 / JUL 2011.
Jet A – Thermal Oxidation Test Training Memphis Refinery Lab
Hydraulic axial forces acting on a Francis runner
774 DCDA 21/2”-12”.
5000SS 21/2”- 6”.
SAFETY, TOOLS & EQUIPMENT, SHOP PRACTICES
VG INSTALATION & MAINTENANCE.
2000SS 2½”-12”.
774 2½”-12”.
3000SE 21/2”, 6”, 8”.
Automotive Technology Principles, Diagnosis, and Service
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

Floating Head Heat Exchanger MAINTENANCE Floating Head Heat Exchanger Peyman Ranjbar

FLOATING HEAD Heat Exchanger General Assembly view Shell side Inlet Shell side Outlet Tube side Inlet Tube side Outlet Shell Back Cover Distributor Tube Sheet Gaskets Gasket Saddle Floating Head Bundle

Floating Head Heat Exchanger Cross Sectional View Baffle Shell Distributor Back cover Tube Bundle Floating Head

FLOATING HEAD Heat Exchanger Split View of Parts Gasket Gasket Split ring Spacer Gasket Gasket Tube Bundle Tube sheet Distributor Back Cover Floating Head Shell Floating Head Detail

Do Not Start The Job Without A Safety Plan MAINTENANCE Floating Head Heat Exchanger Safety First Plan Do Not Start The Job Without A Safety Plan

FLOATING HEAD Heat Exchanger Maintenance Activity Description Blind Inlets-Outlets at plant area Disconnect and remove Floating Head with gasket Disconnect and remove Distributor with gasket Install the bundle puller Pull the bundle out Disconnect and remove Back cover with gasket Bundle Puller Ground level

FLOATING HEAD Heat Exchanger Maintenance Activity Description…..Continuation Lower the bundle and take to hydro-jetting area Lift the bundle puller with clean bundle and new gasket, ready for reinstallation Clean Shell and covers Bundle Puller Ground level

FLOATING HEAD Heat Exchanger Maintenance Activity Description…..Continuation Reinsert the bundle by bundle puller Lower the bundle puller to the ground and take it away Bundle Puller Ground level

FLOATING HEAD Heat Exchanger Maintenance Activity Description…..Continuation Shell Side Hydro-test Install front Test Ring with gasket Install Pressure Gauge Raise the pressure up to value given by Inspection Connect water pump Install back Test Ring with gasket Check leakages from tubes Fill the shell by water Install Blinds in shell PG Water Pump Ground level

FLOATING HEAD Heat Exchanger Shell Side Hydro-test …Check leakages from tubes continuation PG “A” “B” Water View “A” Water View “B”

FLOATING HEAD Heat Exchanger Shell Side Hydro-test ….Continuation Details PG “A” “B” Shell under pressure Tube leak elimination Details Detail “A” [By Expansion both sides] Detail “B” [By Plug both sides] Leak Tube Expander Tool Leak

FLOATING HEAD Heat Exchanger Maintenance Activity Description…..Continuation Discharge water from shell drain Reinstall distributor with new gasket & tight bolts Remove Test Ring & gasket [floating head side] Remove Test Ring & gasket [distributor side] Blind Distributor in & out Reinstall Floating Head with split flange, new gasket & tight bolts PG Drain

FLOATING HEAD Heat Exchanger Tube Side Hydro-test ….Continuation Details FLOATING HEAD Heat Exchanger Install PG in distributor top nozzle Check floating head gasket sealing Discharge the water, remove PG and water pump Connect water pump Check distributor gasket sealing Fill tube side by water Remove blinds form distributor nozzle and tight bolts Raise the pressure up to value given by Inspection PG PG Water Pump Drain

FLOATING HEAD Heat Exchanger FLOATING HEAD Heat Exchanger Shell Side Final Hydro-test ….Continuation Details Install Back cover with Gasket Check Back cover gasket sealing Discharge the water, remove PG and water pump Connect water pump Check bundle to shell gasket sealing Fill Shell side by water Remove blinds form shell nozzles and tight bolts Raise the pressure up to value given by Inspection PG Drain Water Pump

FLOATING HEAD Heat Exchanger FLOATING HEAD Heat Exchanger Handover & Final House Keeping By Maintenance Remove tools and equipment Close Work permit Clean and wash the area Remove scaffold after unit start-up